Council archive · source document
07/1098 - MCU - Detached House [As Published] · 132007.1098
INTEGRATED PLANNING ACT 1997
Integration of land use and public °
transport
~ For more information refer to Guide 23, schedule
8A of the IPA, & schedule 2 of the IP-Requlation.
Untess you answered “none of the above”, the
application triggers referral to QT as a
concurrence agency.
Q
IDAS Assessment Checklist, Version 20, 2 April 2007
22. The application involves: (tick the applicable box/es)— -
C1 (i) a material change of use assessable against the planning scheme fora purpose
~ mentioned in schedule 13C of the IP Regulation: and exceeding the thresholds set by that
schedule.
L (ii) reconfiguring a lot—
Oa)
Oo)
‘Oo.
Cid)
Che)
on fand that is completely or partly within a a public transport corridor, and the
total number of lots increases;
on land that is completely or partly within a future public transport, corridor or
an airport's public safety area;
on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
. for a residential purpose within the 25 ANEF contour for an airport;
for a residential purpose resulting in 100 or more allotments.
C1 (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that
Ola)
d, Ow)
{i vy) none of the above.
is completely or partly within a public transport corridor or a future public
transport corridor;
will result in work that encroaches into an airport's operational airspace.
Railway safety and efficiency
For more information refer to Guide 23, schedule
8A of the IPA-& schedule 2'6f tie IP Regulation.
Unless you answered “none ‘of the above’, the
application triggers referral to QT as a
concurrence agency.
‘| 23, The application involves: (tick the apolicable box/es)—~
oD (i) a material change of use assessable against the planning scheme for a purpose
* mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule,
Oo tii) ) reconfiguring a lot—
D(a)
Ci (b)
Oo
O@
De).
on
-on.Jand that is completely or partly within a future public transport. corridor,
future railway land or a railway tunnel easement,
on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger ralway station, and the total site area is 5000m? or
greater;
on land that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
on land that abuts rail corridor land, commercial corridor land or future railway
land.and an easement abutting the corridor or future railway tand is created;
on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
for a residential purpose resulting in 100 or more allotments.
(ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) e
above, involving extracting, excavating or filling greater than 50m3, on land that—
(1 (a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
(1 (b) is completely'or partly within future railway land, or a railway tunnel easement;
[3 (c) . abuts rail corridor land, commercial corridor land or future railway land, and
‘ -the work is within 25m of the railway boundary.
ain) none of the above.
“Moonie to Brisbane pipeline
For more information refer to schedute 2of the [P
Regulation.
Unless you answered “none of the above”, the
application triggers referral to the holder of
pipetine licence No 1 issued under the Petroleum
Act 1923, currently Santos QNT Pty.Ltd, for
advice,
: 24. The application involves the easement for the construction or operation of the Moonie to
Brisbane strategic pipeline, and-involves; (tick the applicable box/es)—
Oa | material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the |
easement.
C1 (ii) reconfiguring a lot
C1 (ii) operational work assessable against the planning scheme, that is filling, excavation,
“compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
(iv) none of the above. -
‘Page 8 .
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1098 - MCU - Detached House [As Published]Related documentApplication case desk ↗
00154BA3.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.