07/1098 - MCU - Detached House [As Published] · 132007.1098
FOUNDATION AND STRUCTURAL PLANS
SITE CLASSIFICATION - M
ARTICULATED MASONRY VENEER
SITE CLASS FOUNDATIONS
Most sand and rock sites with little or no ground movement
CLASS - A from moisture changes.
Slightly reactive clay sites with only slight ground
CLASS - S movement from moisture changes.
Moderately reactive clay or silt sites which can experience
CLASS - M moderate ground movement from moisture changes.
Highly reactive clay sites, which can experience high
CLASS - H ground movement from moisture changes.
Extremely reactive sites, which can experience extreme
CLASS - E ground movement from moisture changes.
CLASS - A to P | Filled sites.
Sites which include soft soils, such as soft clay or silt or
CLASS - P loose sands; landslip; mine subsidence; collapsing soils;
soil subject to to erosion; reactive sites subject to abnormal
moisture conditions or sites which cannot be classified
otherwise.
CONSTRUCTION NOTES
: 1. All workmanship and materials shatt be in accordance with the requirements of the relevant current
Australian Standard Codes, Building By-Laws and the ordinances of the relevant Local Authority.
2. i) Concrete Class - Minimum 20 MPa at 28 days
Stab on ground 20 nominal maximum aggregate size
80 maximum stump +/-10mm
ii) Concrete Class
Suspended slab
Minimum 32 MPa at 28 days for internal slabs
Minimum 40 MPa at 28 days for external slabs
20 nominal maximum aggregate size.
80 maximum slump +/-10mm ‘
25 to upper face of internal stabs -0 +Smm
45 for external exposure
30 to a membrane in contact with the ground
40 to unprotected ground :
4. Minimum Laps and Splices for Reinforcement
{a} Slab Fabric - 225 minimum overtap of transverse bars at all edges
(b} Trench Mesh 500 splices in all footing beams .
Laps at intersections as per the Design Drawings
500 splices in all footing beams
Provide “L” bars at all beam intersections with 500 laps to each leg
5. Fireplaces shall be supported on slab thickening extending 300 past the edges of the masonry, and
reinforced with F72 mesh top and bottom. Slab thickening shall be 150 thick for single storey construction
and 200 thick for two storey construction.
Shrinkage Control
6. Reinforcing mesh may be reduced to F72 for slabs under 18m in length on "S” sites
7. Where the floor slab is to be tiled, the following recommendations are made, in order to
minimise the effect of shrinkage:-
- F92 slab mesh (or equivalent) should be provided
- Placement of tiles should be delayed for as long as possible (preferably for at least 3 months)
EARTHWORKS NOTES:
Where any filling is carried out on the site after the completion of the site investigation, the
t following recommendation shall be fellowed:-
8. The site shall be stripped of all vegetation prior to the placement of any filling material.
9. Compaction Standards for filling Material
A. Controtled Filling 5G
{a} Sand filling up to 600 deep, placed in maximum 300 thick layers and compacted with a vibrating
roller to achieve a minimum Dynamic Cone Penetrometer reading of 7 blows per 300 penetration
(refer AS 1289.F3.3}. Sand fill may be flooded if necessary to achieve this compaction standard,
provided the water can subsequently be drained from the site.
(b) Non-sand filling up to 400 deep, placed in maximum 150 thick layers and compacted with a
mechanical roller. Clay fill shall be moist during compaction.
{c) Controlled filling shail continue for at least 1 metre past the edge of the footing beam and shall
be battered back to the original surface with a stope of no more than 1:2 (Vert : Hor),
(d) Where the depth of filling material exceeds that specified above, the filling material shall be
compacted as follows:-
t Sand fill to 65% Density Index in accordance with AS1289.E6.1
: Non-sand fill to 95% Maximum Ory Density (Standard Compaction) in accordance with 5.4.1
Compaction tests shall be carried out on each layer as the filling is placed. If the compaction standard
specified is not achieved, then a “Pier and Slab” and “Pier and Beam” footing design shall be adopted with
all piers founded on the undertying natural material.
. B. Rolled Filling
(a) Sand Fitling up to 600 deep, placed in maximum 300 thick layers and compacted by repeated
tolling with an excavator.
, (b) Non-sand filing up to 300 deep, placed in maximum 150 thick layers and compacted by repeated
tolling with an excavator.
{c) Where the depth of filling material exceeds that specified above, the filling material shall be
compacted as follows:-
Sand fill to 65% Density Index in accordance with AS1289.E6.1
Non-sand fill to 95% Maximum Dry Oensity (Standard Compaction) in accordance with 5.4.1
Compaction tests shall be carried out on each layer as the filling is placed. If the compaction standard
specified is not achieved, then a “Pier and Slab” and “Pier and Beam” feoting design shall be adopted with
all piers founded on the natura! underlying material.
3. Minimum Cover
to Reinforcement
(ch Reinfercing Bars
Le
ANT CL Lt A ZN
SA
Tomes l=7:
LINDSA Y CONSULFING °7y, (ubgER-#-SLENT
gli<
=-
E a
~Pig
?
o
wn
n
tod
&
a
a
eo] 8<
=i >=
<| Ga
4] 2
el Se
a wi
S| oo
319 <
a4
-| Oin =<
ut a A
aor oO
o| &© ao &
Saw Zz
a
2
=
z
oa
|=
o x
nM |=
Ll +
A w
2} x
ky
ROOCHYDORE
OFF. 2C/82 PARKER STREET, MA
~—s
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1098 - MCU - Detached House [As Published]Related documentApplication case desk ↗
00154BA3.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.