Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

07/1098 - MCU - Detached House [As Published] · 132007.1098

of 43

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

\

 

 

 

INTEGRATED PLANNING ACT 1997 . : - IDAS Assessment Checklist, Version 20, 2 Apr! 2007
‘State-controlléd:road matters. _|2. ~The application involves: (tick applicable boxes) , \
‘ore efonpon er ‘os tea 1602: (C1 (i) development on land contiguous? to a State controlled road and for- . \

in -You-answered enone‘ ‘Of the, ove" 0 .
“the application’ triggers referral to the Department (2 (a) material change of use assessable against the planning scheme; \
of Main Roads (DMR).as. a réfertal agency. Oo (b} reconfiguring alot unless -
In:certa DMR will be an advi
Paiaptebrbtnicadlarat me ; "e the total number of lots is not increased; and ‘
be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased; \
Schedule 2 of the IP Requtation N will assist you to
‘delermine where OMR is an advice o (1 (c) operational work (not associated with a material change of use assessable against the

concurrence agency for the application. planning scheme or reconfiguring a fot mentioned in (b) above}—
: . : : :e associated with access to a State-controlled road; or
 forfi iling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
iii) development on land not contiguous to a State-controlled road and -
(] (a) material change of use -
* assessable against the local government's planning scheme; and
. * mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
. . that schedule;
(21 (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation *
“and exceeding the thresholds set by that schedule;
. ; (1 (c) operational work (not associated with a material change of use assessable against th
‘ ” : “og . planning scheme or reconfiguring’ a lot mentioned in (b) above)— :
1H ed + assessable against the local government's planning scheme; and
an « mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
‘that schedule.

Ei) ‘none of the above

 

 

 

 

 

The,application-involves: (tick applicable box/es)
(i) material change of use ~
(a) assessable against the planning scheme; -
{b) on alot containing -
« acategory 1, 2 or 3 area shown ona property map of assessable vegetation; or
‘manager for the. apalication, i : ‘ + if there is no property map of assessable vegetation. for the lot - remnant vegetation;
cgoncurTence agency for ne appicatonin relation (c)_ where the existing use of the land is a rural or environmental use; and
ityouitickes-03()0r4i); your, appliction ie (d). where the size of the land is 2 hectares or larger - - complete Part J of Form 1
referral to NRW for: assessment fegardle | (ii) reconfiguring a lot~
(a) on a lot containing a category 1, 2 or 3 area shown on a property map of
ct Be "assessable vegetation or, if there is Qo property map of assessable vegetation for
the lot, remnant vegetation;
(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and .
(d) where the size of any lot created is 25 hectares or smaller - compete Part J of Form 1
CI (iii) operational work: -
(a) for the clearing of native vegetation where the vegetation Clearing | is made
_ assessable under Schedule 8 of the IPA; and
(b} not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ji) - complete Part J of

Form 4 ‘
‘ wot none of the above. |

The application involves: :
DW development on strategic port land as defi ned i in the Transport infrastructure Act 1994 (Tl
. Act) - complete Part ! of Form 1 .
isa (1 (ii) a material. change of use thatis inconsistent with the land use Se plan approved under the
. of TI Act for the strategic port land - complete Part | of Form 1
{iii)

none of the above

 

    
 

 

 

“Strategic, port! land
‘For-more information:

   

  

concurrence: = aaeney tort

 

 

4 Land contiguous toa State-controlled Toad is defined i schedule 14 of the iP Regulation fo mean land -if pat of the tand.is within 100m of the State-controlied toad: 0 or that is part of a future State- ©
controlled road,
. Page 2

Used in these records

About this file

File size
3.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1098 - MCU - Detached House [As Published].pdf · 3.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.