Skip to the record
Beware of cheap imitations.

Council archive · source document

SUPERSEDED Compiled Approved Plans - 132006.1165.01(06/1165)

of 12

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 

 

 

 

 

UPPER PITCHING POINT

 

 

COLORBOND ROOF SHEETING AS SELEDCTED
AT 5° ROOF PITCH

 

 

COLORBOND FASCIA AS SELECTED

RENDERED FINISH AS SELECTED

 

 

 

 

 

 

 

 

 

ON HEBAL POWERPANEL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

$0x50 SHS STEEL FRAME WITH

BLUE BOARD CLADDING TO
FORM WINDOW AWNING

RENDERED FINISH AS SELECTED
ON HARDIES BLUE BOARD CLADDING

UPPER PITCHING POINT

 

2640 ABOVE FFL

UPPER FLOOR LEVEL RL 43.025

ALUMINIUM FRAMED WINDOWS AS SELECTED

 

 

 

 

 

 

 

WITH POWDERCOAT FINISH

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2440 ABOVE FFL

UPPER FLOOR LEVEL RL 43.025

 

 

 

LOWER CEILING HEIGHT
3000 ABOVE FFL

LOWER FLOOR LEVEL RL 39.600

RENDERED FINISH AS SELECTED

 

 

 

 

ON R/BLOCK WORK

 

FIXED GLASS BALUSTRADE AS SELECTED
TO COMPLY WITH BCA .

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOWER CEILING HEIGHT
3000 ABOVE FFL

LOWER FLOOR LEVEL RL 39.600

 

 

NOTES:

 

SPEEDBRACE ROOF CROSS BRACING
AS PER ROOF TRUSS MANUFACTURERS
SPECIFICATION.

 

 

 

 

1500 4600) 1000

 

|

 

 

 

 

 

 

 

 

 

2069

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RENDERED FINISH AS SELECTED
GN R/BLOCKWORK

 

 

 

© copyricut

 

THIS DRAWING IS THE EXCLUSIVE
PROPERTY OF HARRIS DESIGNS &

 

COMMUNICATIONS PTY LTD AND

 

MAY NOT BE LOANED OR COPIED

 

 

0 7/06 | PLAN AMMENDMENTS

C 6/06 | PLAN AMMENDMENTS

B 5/06 4 BUILDING APPROVAL

A [2/06] PRELIMINARY
ISSUE | DATE | DESCRIPTION

 

 

. IN WHOLE OR PART WITHOUT
WRITTEN CONSENT .

 

 

PROJECT

PROPOSED PROJECT

67 SEAVIEW TERRACE
SUNSHINE BEACH

 

bullding designers’
association of
queensiand Inc.

CLIENT

LIPSKY PTY LTD

PROPOSED EAST ELEVATION

 

 

DATE
2/06

DRAWN SCALE
JH 1:100

 

 

 

Cl

 

OO

oo

CONCRETE STAIRS

NOOSA SHIRE COUNCIL
PLANS APPROVED

 

 

 

ACN 082 563 273

83 Dover Street WESTON O 4051

Pr: 1071 3352 $269

Fax; (07) 3356 2994

Mobite: (0408) 752 025

Licences Under the BSA. 61550

Email Address: jonharrisftpowerup.com av

 

 

 

 

DRAWING TITLE

ELEVATION

JOB No. DWG No. ISSUE
250905 006 D

 

 

 

 

 

Used in these records

About this file

File size
3.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Compiled Approved Plans - 132006.1165.01(06_1165).pdf · 3.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.