Reference Document MCU22-0102 Stormwater Management Plan
The original of this document is very large (29.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Decentralized stormwater treatment is
becoming more and more interesting for
authorities and planners. It is seen as an 3P Hydro Filter Drain
important measure within the implemen-
tation of the Water Framework Directive,
The Hydrochannel is an
as it can insert that
be deployed can be and
very precisely, placed
therefore
inside a channel grated cost effectively.
drain of 300mm wide, and at
least 450mm deep. It is designed for areas that would
It is able to filter and bind pollutants like
benefit from at PAH´s,
source stormwater
HC´s, heavy metals treatment,
like Cd, Zn, Cu,which
would otherwise be bypassed.
Pb as well as phosphate and ammonium.
Decentralized stormwater treatment Theispollutants then can be disposed of
becoming more and more interesting safelyforand easily.
authorities andThisplanners.
allows It isstormwater
seen as an from high traffic areas (car
important measure
parkswithin
and the implemen-
roads),Thisindustrial
allows stormwaters
areas from
andhigh traffic
metal roofs to
tation of the Water Framework Directive,
areaslevel,
(car parks and roads), industrial safely to
be cleaned at
as it can be deployed very precisely, site and then discharged
andand metal roofs to be cleaned at
areas
therefore cost ground or surface
effectively. water
site level, andbodies locally.safely to
then discharged
ground or surface water bodies locally.
It is able to filter and bind pollutants like
PAH´s, HC´s,The heavySPEL
metals Hydrochannel’s
like Cd,The Cu, Filtermodular
Zn,Hydro design
Drain’s modular means that
design
Pb as well asthe phosphate and ammonium.
stormwater is treated
means that thein two steps:
stormwater is treated in
The pollutants then can be disposed twoofsteps:
safely and easily.
1. Solids and 1.particulates are settled
Solids and particulates in the first step.
are settled
This allows stormwaters from high traffic
in the first step
2. and
areas (car parks Dissolved contaminants are then absorbed in the
roads), industrial
filter
areas and metal roofs matrix.
to be cleaned at
2. Dissolved contaminants are then
site level, and then discharged safely to
absorbed in the filter matrix
ground or surface water bodies locally.
The Hydro Filter Drain’s modular design
means that the stormwater is treated in
two steps: Technical data
FEATURES
in the first step
Length:
1. Solids and particulates are settled
Nominal diameter:
connectable area:
Co
nd
itio
ns
100 cm
30 cm
20 m² •
Th
e ve
the
rifi
cati
on
catc app of
2. Dissolved contaminants are then proved intensity of rainfall: 300 l/s x ha
the
• hm licati se
Th en on Cla
e
pe num ts; of im V
• rh Sto s is Re erifica
ect ber rm con fere Storm
Th are of S wa dit nce tion C
absorbed in the filter matrix suspension safety
e ter ion wa
10 foo of torm Te al u Nu ertif Mai ter Quali
• % p tp catc chn mb ic
Ma er rint hm wate olo po
n; er: ate Appli
cant pe
nten ty Im
provem
in 10
un the
of e r
nt Tech gy SA – SQ Inform du rform ance
•
de
scri tenan its a
of housi rea; nolo
A in -YY
YY IDEP Appli
ationrin ed VERIFIC ent Device
Th be ce Sto gy R e /M cant mon g • ATIO Evalu
e d in m
rm ng st A im sid M/V VC Name itorin Stor N CE ation
is 2 3 m the ust b en Protoc
• 50 on DP e wa ruct
ter p lem
tia
l C Appli g mon mwater RTIFICA ol (SQ
This itoring Techno TE
L/s; th d R; sche u an cant • IDEP) Verif
An
esi du Te re m en dC Addre Exam
an exte g le chn ust ted om ss ple PtycartLtdmaintenperiod; logy A
Refe icatio
The Hydrochannel filters and binds pollutants
• d m rn n fl da olo b refl me Phon renc n
od al byp ow nd gy e be ect rcia e Numb • ridge ance was e N Certifi
MU rate com A; er 2 Pudd No mai um
SIC e ll ed ass pe ple
tw
ee s 3,0 l
Email • ot
lesThWa her
; in clud ntai ber: cate –
mo ap n1 00 Verif is wy, Sy mai ed co ned SA-Y SQID
de pro for fl ru
nit ted 00 un ie +6 co as dneynten m once YYY/ EP VC
ls b pri o an m3 it met d 1 2 12 mpa ve NS an plet MM
ein ate ws gre of
Sto nu ± s Webs mod hod to 34 56 ny. rified W ce 20 w e re per
/VC
gp ly in ate rm ally ite 78 with 00 as pe plac annu
m ov
like hydrocarbons, heavy metals as well as total
rep wa as MU el in exam a St rf em
MU r th ter pe SIC • ple atut ormed ent er th
are SIC an r th Th@e ory of th e3
d in ; the Te at e mxample. De durin e tech year
acc chn www. tech onito com.au clar g
de olo ex nolo ring atio the m nolo
ord sig gy ample
scou pr n on gy
an nT A Verifi • gy
.co as og from ito
ce FR
is im
ed Te
chno The r and sem.au wel ram
l in the red pe
wit mai
max submitt ttling; as the cluded rio
Technical data
logy
phosphorus (TP) andweirs
total nitrogen (TN). The pollutants
h th ple nten d;
stru
ed me Issue stru imum ed MU ctur inform ance
Water over from the sedimentation Storm
eta nte Date • ct and SI e it at
il a The ure; min C mod was ion on
bo
d,
Revie water
tech submitt
imum el hous th
ve
. wed
Docu belo nology ed, ca Tech stru and DP ed w e perf
ments dd Mm
mm w; YY with libra nology ctur R
es, provid
ithin orm
, to ance
chamber And passes down to the filter
A and
can then be disposed of safely and easily.
YY 3 no ted M es
calib desig acco of
• Qu des USI rate n gu unt the
ality an Cm for
Consu Assurance d prim odel d k va id el
lues ines fo
Length: 100 cm
ltant ary pr
• Qu A, 20 Project Pla and ovides for r
25 seco the
bag with the filter matrix inside it. Both
ality n, Sto a
A, Sto Assurance rmwa ndar metho
ter Te d
rmwa
ter Au Project Pla chno y links of mod
• De logy A, as pe el
Nominal diameter: 30 cm
strali r th ling th
© tailed a, 20 n Approva
Sto Consu Perform 25 l, Sto e im
age
e
organic and inorganic contaminants are
rm ltant ance rmwa
wat • Lab A, 20 Repo ter Te
er orator 28 rt, Sto chno
Au
stra y Repo rmwa logy
• Sta ter Te
connectable area: 20 m²
lia tutory rt, Sto chno
YY
YY • Decla rmwa logy A,
Tech • Ca ter Te
removed by Adsorption and precipitation.
nolog Th e inlibrat ration chno
y Inform put ed MU , Consu logy A
ation o crite SIC mo ltant – Unive
Appli Stru ria fo del file A, 2025 rsity
cant’s
proved intensity
• ofStormwater
rainfall: 300The
l/s xfiltered
ha
Verifi ctur r X, 20
e no each no , Consulta 21
treatment ofthen
surface levels.
ed ▪ nt A,
Perfo Total high de
water flows within the
rm Su de ar 2025
Claim ance Total spended ▪
Ar flow
e;
s Phosp Solid▪
Total ho s S) ea = Y bypass
Nitrog rus (TP)▪ (TSDe m2
suspension safety
pt =X
Total
Pe
en (TN Orif h =70 Z m% m 3/s
Gross troleum ) ▪ W ice di30
Channel to the collection point where it
Pollu Hydro▪ eir le am%et
tan
o ts carFobo ng30 % er
Othe
rs, ple G
otnsprinNilth = V = W m
ase de eneric Storm t to%be m m
• Gross pollutant sediment,
be re-usedand nutrienttocapture.
© ____
____ tail: node watNil % scal
© StoStorm ▪ er Te
chno ed acco
can either or discharged
rmwawat ____ high
tererAuAu ____▪ flow
strstalia ____ TS__ logy rdin
raliaYYY ▪ S __
re ____bypa A g to
Y
YYYY TP re du ctio____ss__= X 100
▪ m3
TN ductio n = 70 __ m 3__
__ /s per
3 redu n % ____ 10 un
infiltration.
ctio = 30 % ____
____ its of
n= ____
30 % ____
___
• Insert into 300mm wide channel drain. 1
Water weirs •over from thewith The initial sedimentation step ensures the
sedimentation
Sites little working
CR flatlifegrade.
2
chamber And passes down to thelong filter of the filter bag, and the
bag with the•filter matrix inside it.granular
Both filter material within it.
No underground Theare
vault for cartridges.
filter is designed to promote an even
organic and inorganic contaminants
• Quick
removed by Adsorption andand and homogenous
easy installation
precipitation. flow and
distribution within
maintenance
The filtered water then flows within it. Separation
the of the material is near im-
possible,
Channel to the collection point where it by proven and certified design.
can either be re-used or discharged Thetopad will need be replaced at about Tested Treatment Efficiencies*
infiltration. 10 years, depending on site conditions.
Pollutant Efficiency
The initial sedimentation step ensures the
long workingTechnical data
life of the filter bag, and the Gross Pollutants (GP) 100%
granular filter material within it.
Moduleto Length:
The filter is designed promote an even Total Suspended Solids (TSS) 88%
and homogenous1000mm 2 withinwww.3ptechnik.com
flow distribution
it. Separation of the material is near im-
Total Phosphorus (TP) 69%
possible, by Module
proven andWidth:
certified design.
The pad will 300mm
need be replaced at about
10 years, depending on site conditions. Total Nitrogen (TN) 67%
Minimum Depth;
450mm Petroleum Hydrocarbon 0%
*Contact Spel to confirm approved performance for the project LGA
2 www.3ptechnik.com
2 SPEL Hydrochannel
See the original
The page text is free to read. Viewing or downloading an original file needs an account.