Reference Document MCU22-0102 Stormwater Management Plan

of 119

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (29.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
1. PROPOSAL OVERVIEW
TMC Building Design Group (in conjunction with CMG Consulting Engineers Pty Ltd) has been
engaged by Chris King & Joanne Hill to prepare a holistic Stormwater and Waste Water
Management Plan for the proposed Car Wash and Take Away Food & Drink Outlet at 34 Elm
Street in Cooroy.
The proposed new development building and works consists of:
   1. Two (2) Automatic Car Wash bays,
   2. Two (2) Self-Serve Wash Bays,
   3. Two (2) Super Bays,
   4. Three (3) Vacuum bays,
   5. Two (2) Dog Washes,
   6. A Plant Room, Secure Storage and Store Room with staff amenities,
   7. Fenced Bin area,
   8. Stand-alone Take Away Food and Drink Outlet with attached Disabled Public Toilet,
   9. Suitable landscaping and seated area.

This report will investigate the full water cycle management for the site including;
    A. Stormwater Management,
           i. Compare Pre-Developed Site -v- Post-Developed Site runoff coefficients,
          ii. Model Stormwater harvesting from roofed areas,
         iii. Overall developed site Music Model,
         iv. Overall developed site water quality improvement systems to be adopted.
    B. Waste Water Management,
           i. Expected Car Wash and Dog Wash site patronage,
          ii. Mains Water usage and Sewer discharge with and without recycling equipment,
         iii. Customer Average Weekday, Peak Weekend, Flagship Event site daily patronage,
         iv. Compare Annual Mains Water usage and sewer discharge with and without
               recycling.
    C. Cooroy & LGA Car Wash Stormwater Pollution Calculator.
           i. Current conditions- Pre- proposed Car Wash development,
          ii. Future conditions- Post- proposed Car Wash development.




 -3-        TMC Building Design Group
Log in to download the original file

Reference Document MCU22-0102 Stormwater Management Plan.pdf · 29.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.