Original source · versioned page text
Reference Document MCU22-0102 Stormwater Management Plan
The original of this document is very large (29.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn APPLICATIONS
• Car parks & shopping centres
• Council depots
• Industrial estates
• Heavy vehicle maintenance
• Transport depots & loading bays
• Tunnels
• Highways & transport corridors
• Recycling yards
• Airport aprons & tarmacs
BENEFITS
The SPELBasin is an advanced stormwater treatment
system that works with natural forces to provide
superior pollutant removal. Delivered as a pre-
fabricated, compact and self-contained treatment
system, the SPELBasin utilises HORIZONTAL FLOW
bioretention technology and multistage pre-treatment. • Built-in bypass available with all configurations
Easy to size, install and maintain, the SPELBasin is • All configurations utilise a pre-treatment chamber
ideally suited for the urban environment – treating which contains:
runoff from parking lots, roadways, residential and • Litter capture
commercial developments and/or retrofit applications.
• Sediment chamber
Available in numerous sizes and various inlet • Pre-filter cartridges
configurations, including internal high flow bypass, the
SPELBasin is clearly the most versatile and innovative
stormwater treatment system.
Verificatio
Stormwater Quality Improvement Device Evaluation Protocol (SQIDEP) n Certificate
Reference –
Maintenan Number: SA-YY SQIDEP VC
ce VERIFICATION CERTIFICATE YY/MM/VC
performed • Stormwate
durin r Technology
Applicant Information g monitoring A was
monitorin • This main period; Cond maintained once
g ition per annum
tenance includ s over the 3
Applicant Name Example Pty cartri
Ltddge; ed complete year
• No other replaceme
maintenan Thnte ve of the techn
• This NSW ce2000 rif ology
Applicant Address 2 Puddles wasSydney
Way,
verified with
was performed
during the
•
icatio
company. a Statutory moni
th n of Verif
Declaration e aptored perio thes Refe icatio
+61 2 1234 5678 from plica d;e
Phone Number catcthe
hmmain tion ce Claims renc n
e Nu Certific
Verified • entstenan of St is co mbe ate –
The ; orm nditi r: SA SQ
Email method to [email protected]
• The moni num wat onal -YYY IDEP
per er Te upon
model in technology
toring progr
am included hect ber of St chno ; Y/M
M/V
VC
• are
Website MUSIC www.example.com.au
scour and
as well as the
struc
information Th
on e the of ca ormwat logy
A C
settling; ture it was footperformantchm er Te in Re
house10d%withi pr ce ofenthe siden
• The subm
itted MUSI • per n, in tot accou
of th nt t area chnolo tia
maximum C model and Mai 10 units e hofor ; gy A im l an
d Co
structure;
and minim DPR
um structures provides
nten
descdesig anguide of St using st plem mm
n
, and calibr ribed ce mus or
lines for mwat ru ct en ted er cial
Verified Technology • The subm Stormwater Technology A
itted, calibr
•
The
ated k value
3
in th s fort be
e DPR; the sc he
er Te ure mus
ch t be
refle
cts 3,
technology ated is 25 month nolo 000
with 3 node MUSIC model provi 0 L/a methdesig
des
dule
d an gy A; betwee units
Issue Date below;YYYY
dd Mmmm s and prima • s; od ofn mode d co n 10
ry andAn mpl 0 m3
ex dary links as flowralling
secon the eted ±
and ternal te pe
per the image annu
Reviewed Documents • Quality Assurance Project Plan, Stormwater mod
Technology byA, r un ally
•
MUS elle pass fo it of
Stor as pe
d ap
Consultant A, 2025 IC m prop r flows mw
ater
r th
at
odel riate grea Tech
• Quality Assurance Project Plan Approval, Stormwater sTechnology
bein ly in ter th
g pr MUS an th no logy
A, Stormwater Australia, 2025 epar IC; e de A
ed in sign
acco TFR
• Detailed Performance Report, Stormwater Technology A, rdan is im
Consultant A, 2028 ce w plem
ith th ente
e de d,
• Laboratory Report, Stormwater Technology A – University X, 2021 tail
abov
e.
• Statutory Declaration, Consultant A, 2025
A, 2025
• The input criterMUSIC model file, Consultant
• Calibrated
ia for each
o Structure node are;
node
▪ high flow
Technology Information bypass = X 3
▪ Area = m /s
Y m2
Applicant’s Total Suspended Solids▪ (TSS)
Depth =70 Zm %
Verified Total Phosphorus (TP)▪ Orifice diam 30 %
eter = W mm
Performance Total Nitrogen (TN) ▪ Weir lengt 30 %
Claims ▪ FootprintNilh%= V m
Total Petroleum Hydrocarbons to be scale
Gross Pollutants Stormwate Nilr % d according
o Generic Technology to 100 m 3
node A per 10 units
Others, please detail: of
▪ high flow
bypass = X 3
▪ TSS reduc m /s
________________________________________________________ _______
tion = 70 %
▪ TP reduc
tion = 30 %
▪ TN reduc
© Stormwater © St tion = 30 %
or
AustraliaYYYY mwa 1
© Stormwater Australia YYYY ter Au
strali
a YY
YY
2
SPEL Basin
3
2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.