Reference Document MCU22-0102 Stormwater Management Plan

of 119

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (29.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                     To ensure effective      Flow then enters the biofiltration chamber via a pipe
                                     functioning of           located at the base of the structure, and is distributed
                                     the biofiltration        throughout the filter media through a HDPE geo-grid
                                     system, standard         fitted to the perimeter walls (4). Stormwater filters
                                     specifications of        through the proprietary media blend horizontally and
                                     the soil media have      into the centrally-located, slotted collection pipes (5)
                                     been developed           that discharge to the outlet chamber (6). Flow finally
                                     (FAWB, 2009).            enters the underground stormwater drainage system
                                     These specifications     through a discharge pipe (7) that is controlled by an
                                     require traditional      offset outlet from the base to create a permanently
                                     biofiltration systems    submerged zone. These are shown in Figure 3.
                                     to implement three
                                     layers of media, as      1.3 DESIGN DRAWINGS/DIMENSIONS
                                     indicated in Figure 2.
                                                              A standard drawing of the SPELBasin® is shown in
FIGURE 2.                                                     Figure 4. The SPEL basin has an overall length, width
BIOFILTRATION MEDIA LAYERS SECTION                            and height of 6120 x 1340 x 1300 mm respectively. The
                                                              system allows for stormwater runoff to enter via a kerb
These three layers then have a detailed specification         inlet, a grated inlet or underground pipe. The kerbtype
that describes the particle size distribution, nutrient       inlet and grated inlet are fitted with a 600 x 600 mm
content and desired permeability to achieve the               PEL StormSack which filters gross pollutants from
stormwater treatment goals.                                   stormwater inflow.

1.2 MODULAR BIOFILTRATION                                     Pre-filter cartridges are situated within the pre-
                                                              treatment chamber to further remove coarse sediment
The SPELBasin® modular biofiltration system has               from stormwater that bypasses the StormSack. Flow
a number of similar design features to a traditional          is horizontally dispersed through a 7.3 m3 biofiltration
biofilter, however, differs in two key areas;                 system with a proprietary biofiltration media blend
                                                              which drains treated stormwater into the 1.56 m3
•   the use of a proprietary media blend; and                 discharge chamber. Treated water is discharged
•   horizontal flow instead of top-down flow;                 through outlet pits and to street drainage.

The treatment process provided by the SPELBasin®
commences with runoff entering via a kerb inlet (2),
grated inlet or pipe network, and passing through
a coarse sediment screen in the pre-treatment
chamber (3).




                                                                                                  FIGURE 3.
                                                                                                  SPELBASIN® SCHEMATIC




                                                                                                      spel.com.au        3
Log in to download the original file

Reference Document MCU22-0102 Stormwater Management Plan.pdf · 29.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.