Log in to see the plans as drawnSQIDEP Evaluation SPEL Basin, Sippy Downs
have not been involved with this project prior to this evaluation, for example at QAPP stage
and have not been privy to the QAPP.
Review Documents
The following documents form the basis of this independent evaluation:
1) Associate Professor Terry Lucke and Ms Oriana Sanicola, Evaluation of Treatment
Performance of SPEL Basin at Sippy Downs, May 2018, Stormwater Research
Group, University of Sunshine Coast.
2) Dr Darren Drapper and R. Biggins, SPEL Stormwater, Field Monitoring of a SPEL
Basin at University of Sunshine Coast, 90 Sippy Downs Dr, Sippy Downs QLD 4556,
Issue 1, 10 October 2019.
3) SPEL Basin Monitoring setup (digital video)
4) SPEL Basin Technical Design Guideline, revised August 2020.
5) Dr Darren Drapper and E. Hancock, SPEL Stormwater, Field Monitoring of a SPEL
Basin at University of Sunshine Coast, 90 Sippy Downs Dr, Sippy Downs QLD 4556,
SQIDEP Body of Evidence Application Supplementary Report, Issue 1, 31 July 2020.
Sippy Downs SPEL Basin
A SPEL Basin was submitted for evaluation against the SQIDEP protocol in October, 2019.
Testing for the system was conducted over the period from March 2017 to April 2018 by the
University of Sunshine Coast (USC), with the testing criteria adapted to meet the SQIDEP
Protocol (released subsequent to the testing period). USC is an independent organisation
that undertook the testing on a fee for service basis.
The basin installation is on Sippy Downs Drive, Sippy Downs and can be seen in Figure 1.
Greater description is contained in review documents 1 and 2.
A review of the site and catchment conditions is shown below. The field monitoring claims to
have met all of the criteria of the SQIDEP protocol, and this claim is evaluated in this report.
5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.