Original source · versioned page text
Reference Document MCU22-0102 Stormwater Management Plan
The original of this document is very large (29.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn4.3. OVERALL DEVELOPED SITE MUSIC MODEL The overall proposed preliminary stormwater design for the site has been conducted in accordance with the Noosa Plan 2020, Part 9.4.8 Water Quality and Drainage Code. The resultant treatment train is shown in Figure 5 below. This MUSIC (Model for Urban Stormwater Improvement Conceptualisation) Model below. Figure 5; MUSIC Stormwater Treatment Train and Effectiveness Model This MUSIC model, the Proposed Preliminary Stormwater Site Layout Plan and this report shows compliance (meets or betters the minimum design requirements) with the required Performance Outcomes of the Stormwater Drainage Design P01 – P05, the requirements of the Stormwater Quality and Protection of Receiving Waters P06, P08 and P09, and also Hydrology and waterway stability PO10 – PO13 (Note: that some areas/requirements are not applicable or relevant to the proposed works). -9- TMC Building Design Group
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.