Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2021-08-16 GC Agenda - Item 8 - Attachment 3 - Amended 2021-22 Operational Plan

of 22

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                    Theme - Long Term Planning for Noosa Shire
                                    Corporate Plan Goal - Noosa Shire is well managed and
                                    sustainable


Corporate Plan Key Focus Areas      Operational Initiatives               Outcomes                              Responsible Areas

Adopt a new Town Planning           Undertake the process for             Increased provision of affordable     Director Environment
Scheme                              amendments to the Noosa Plan          and accessible housing                & Sustainable
                                    2020                                  Delivery of Ministerial conditions    Development
                                                                          and associated amendments

                                    Implement Short Stay Local Law        Management of short stay              Director Environment
                                                                          letting to reduce the impacts         & Sustainable
                                                                          on permanent residents and            Development
                                                                          residential amenity

                                    Continue rollout of Place Making      Measured improvement in              Director Environment
                                    project                               liveability through planning, design & Sustainable
                                                                          and management of public spaces Development

Implement an integrated             Continue to implement priority        Transport options contribute          Director
Transport Strategy that             activities from the Noosa Transport   positively to a strong economy,       Infrastructure
encourages alternative transport    Strategy                              the health and wellbeing of the       Services
usage and reduces our                                                     community and a low carbon
dependence on private motor                                               future
vehicles
                                    Implement the Walking and Cycling     Facilitation of walking and cycling   Infrastructure
                                    Strategy                              for transport, recreation, health     Planning, Design &
                                                                          and tourism                           Delivery

                                    Noosa Hinterland recreation trails    Increased recreational                Environmental
                                    upgrade/implement Noosa Trails        opportunities and improved multi      Services,
                                    Master Plan, Audit of the trail       use trails and linkages within the    Infrastructure
                                    network                               trails network                        Planning, Design &
                                                                                                                Delivery

                                    Undertake pathways expansion          Improved access and connectivity      Infrastructure
                                    upgrade                               within the shire                      Planning, Design &
                                                                                                                Delivery

Implement the Noosaville            Undertake non powered water           Delivery of land use outcomes         Community
Foreshore Land Use Management       sports feasibility study              identified in the Noosa Foreshore     Development,
Plan                                                                      Land Use Master Plan                  Property

Ensure effective service planning   Develop the new Corporate Plan        Progress towards achieving            CEO
processes are in place                                                    Council's long term vision and
                                                                          to provide strategic direction to
                                                                          council over the next 5 years

Develop and report on               Develop a Performance                 To assist in decision making and      Director Executive
community sustainability            Measurement Framework                 improving performance by linking      Services
indicators                                                                organisational objectives to
                                                                          operational and individual levels

Meet the principles of the          Ongoing Support of the Noosa          A community led framework that        Environmental
UNESCO Man in the Biosphere         Biosphere Reserve Foundation          meets the balance between             Services
Program                                                                   environment and sustainable
                                                                          human development

Establish functional Asset          Finalise development of Asset         Asset management objectives           Asset Planning
Management Plans for all Council    Management Plans for major asset      are met and full suite of Asset
asset classes                       classes by completing the Parks       Management Plans completed
                                    and Playgrounds AMP

   Page 18
Log in to download the original file

2021-08-16 GC Agenda - Item 8 - Attachment 3 - Amended 2021-22 Operational Plan(PDF, 2MB).pdf · 1.6 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.