Original source · versioned page text
Town Planning Assessment Report
h) includes the provision of
landscaping, shaded seating
and consistent and simple
paving materials on footpaths
that are consistent with the
character of its setting
including where shown as
primary streetscape treatment
area on Figure 7.2.1.4 (Pomona
Framework and Character
Plan); and
i) retains a pedestrian
friendly low-speed traffic
environment with on-street
parking and provides off-street
car parking at the rear or to
one side of the development.
PO12 PO12 – Complies
Development improves local No acceptable outcome provided Development improves local
connectivity by providing safe connectivity by providing a safe
and convenient pedestrian and and activated frontage to
bicycle pathways to and between Memorial Avenue and further
key destinations within the casual surveillance to the rear
villages such as the railway carparking area.
station, community and sports
facilities and schools.
PO13 AO13 AO13 – Not Applicable
Development integrates with and Development on land including or The land does not contain or
extends the existing street and adjoining a key pedestrian/cycle adjoin key pedestrian/cycle links.
pathway networks including but link including where shown
not limited to those identified on Figure 7.2.1.4 (Pomona
on Figure 7.2.1.4 (Pomona Framework and Character
Framework and Character Plan) facilitates these connections.
Plan) such that connections to
and between key local
destinations are provided and
reinforced.
PO14 AO14 AO14 – Not Applicable
Development has no significant Connecting Habitat Areas as The land is not located within
adverse effects on biodiversity, identified on Map SFM-4 - vicinity of connecting habitat
natural vegetation, native fauna Biodiversity (Strategic Framework areas
habitat, landscape quality, water Map) are protected from
quality or cultural heritage fragmentation and encroachment
values, including those related by development.
to—
a) changes to natural drainage; Editor’s Note— Council may
b) disturbance to any of request additional information on
the wetland systems; the proposed method of effluent
c) management of landslide and disposal to ensure the nature of the
fire risk; development is compatible with
d) erosion and the transport of environmental values. Refer
sediments off site; to PSP1 – Preparing a well made
e) managed public access; application.
f) effluent disposal; and
changes to fauna habitat and
behaviour.
Page 17 of 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.