                                                                                                                                                                                                               OP WORKS
                 RESIDENTIAL UNIT DEVELOPMENT                                                                                                                                     -
                                                                                                                                                                                                                        ISSUE


                 NOOSA HEADS                                                                                                                                              APPROVED PLANS
                                                                                                                                                                       MCU21/0133 & OPW21/0220
                 9 BOTTLEBRUSH AVENUE, NOOSA HEADS, QLD 4567                                                                                                               NOOSA COUNCIL
                 Lot 147 RP 88934                                                                                                                                         5 NOVEMBER 2021
                 CIVIL WORKS                                                                                                                                                      -



            NOTE:                                                                     8.   CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO
                                                                                           AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR
            THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS                 REINSTATEMENT TO BE CARRIED OUT IMMEDIATELY TO THE SATISFACTION
            BEFORE                                                                         OF INFRASTRUCTURE OWNER/MANAGER / AUTHORITY/COUNCIL.
            ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR IS TO PROVIDE    9.   CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL
            A                                                                              WORKPLACE HEALTH AND SAFETY REQUIREMENTS.
            MINIMUM OF 72 HOURS NOTICE TO RECOR FOR REQUIRED INSPECTIONS. SHOULD      10. WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN CLOSE
            THE                                                                           PROXIMITY TO NEIGHBOURING LOT BOUNDARIES OR INFRASTRUCTURE,
            CONTRACTOR FAIL TO REQUEST AN INSPECTION, THE CONTRACTOR WILL BE              CONTRACTOR TO ALLOW IN SCOPE OF WORKS TO PROVIDE ALL MEASURES
                                                                                          NECESSARY TO ENSURE THE INTEGRITY OF EXISTING BOUNDARIES AND
            RESPONSIBLE FOR ALL COSTS TO ALLOW FOR THE WORKS TO BE INSPECTED TO           INFRASTRUCTURE. THIS MAY INCLUDE THE USE OF LOW VIBRATION
            THE                                                                           EQUIPMENT, TRENCH SHORING ETC AS REQUIRED.
            SATISFACTION OF RECOR. ANY INSPECTIONS THAT FAIL ARE TO BE                11. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON
            RE-INSPECTED WITH                                                             THESE DRAWINGS, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE
            ALL REINSPECTION COSTS TO BE PAID BY THE CONTRACTOR.                          WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.
            a.    PRESTART                                                            12. CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL
                                                                                          CONSTRUCTED WORKS IN ACCORDANCE WITH LOCAL GOVERNMENT
            b.    EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF SEDIMENT       REQUIREMENTS. UNLESS OTHERWISE ADVISED BY RECOR CONTRACTOR TO
                  AND EROSION CONTROL MEASURES UNSUITABLE GROUND                          NOTE COUNCILS ADAC REQUIREMENTS.                                                       SITE BOUNDARY
            c.    SIDE AND CUT OFF DRAINS                                             13. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH RELEVANT
            d.    STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL                       APPROVALS.

            e.    STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT            14. CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL,
                                                                                          LANDSCAPE AND OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL
            f.    STORMWATER STRUCTURE BASE SLABS                                         CONSTRUCTION.
            g.    SEWER RETICULATION                                                  15. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR DEMOLITION
            h.    WATER RETICULATION                                                      WORKS COMMENCING ON SITE.

            i.    PAVEMENT SUBGRADE                                                   16. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS
                                                                                          AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O.
            j.    PAVEMENT REINFORCING
                                                                                      17. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING
            k.    PAVEMENT PRIOR TO SEALING (PRESEAL)                                     PROPERTIES AND COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT
            l.    RETAINING WALL FOOTING REINFORCING                                      OF ANY WORKS ON SITE.

            m.    RETAINING WALL BLOCKWORK PRIOR TO CORE FILL                         18. CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS IDENTIFIED
                                                                                          IN THE APPROVED VEGETATION MANAGEMENT PLAN. CONTRACTOR TO
            n.    STEEL REINFORCEMENT OF CONCRETE STRUCTURES                              ENSURE ALL TREE ROOTS AND STUMPS ARE COMPLETELY REMOVED AND
            o.    PRACTICAL COMPLETION                                                    BACKFILLED TO LEVEL 1 SUPERVISION. CONTRACTOR TO ALLOW TO MULCH
                                                                                          ALL CLEARED VEGETATION AND STOCKPILE ON SITE OR REMOVE FROM SITE
            p.    ON MAINTENANCE                                                          AS DIRECTED.
            q.    OFF MAINTENANCE                                                     19. DRAWINGS TO BE READ IN CONJUNCTION WITH THE FOLLOWING
            r.    ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER               CONSULTANTS/CONTRACTORS DRAWINGS:
                  DEVELOPMENT APPROVAL)                                                          SURVEYOR:     SURVEYPLAN
            s.    ANY OTHER INSPECTION AS REQUIRED BY UNITY WATER AND WHERE                      ARCHITECT:    ZEST BUILDING GROUP
                  RELEVANT TO THEIR CERTIFICATION SCHEME
                                                                                                 HYDRAULICS:   TBC
                                                                                                 STRUCTURAL:   RECOR                                          LOCALITY PLAN
            GENERAL NOTES
                                                                                                 LANDSCAPE:    ZEST BUILDING DESIGN                           NOT TO SCALE
            1.    ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN.
                                                                                      20. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT AUTHORITY:
            2.    ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.        ROAD OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN FOR ALL WORKS
                  CONTRACTOR TO ALLOW FOR ALL MEANS NECESSARY TO ACCURATELY               WITHIN COUNCIL ROAD RESERVES. CONTRACTOR TO ALLOW FOR ALL COSTS
                  SETOUT THE WORKS.                                                       ASSOCIATED WITH IMPLEMENTATION OF THE TMP.
                                                                                                                                                                                                 08/07/21   ISSUED FOR OPW                -    BRP
            3.    ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT              21. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH ALL LOCAL                                                  DATE              REVISION             MARK CHK
                  SPECIFICATIONS AND WHERE FURTHER DETAILS ARE REQUIRED THE               AUTHORITY APPROVALS RECEIVED FOR THE PROJECT
                  CONTRACTOR SHALL REFER TO NOOSA SHIRE COUNCIL DEVELOPMENT                                                                                                                      PROJECT ENGINEER
                  GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES, ASSOCIATED            22. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH OPW
                  STANDARD DRAWINGS AND SPECIFICATIONS U.N.O.                             APPROVALS BY COUNCIL.

            4.    SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED OUTSIDE OF       23. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE
                  THE TOLERANCES SPECIFIED WITHIN THE PROJECT SPECIFICATION AND           BOUNDARY WITHOUT FORMAL APPROVAL BY THE OWNER/CUSTODIAN OF
                  LOCAL AUTHORITY REQUIREMENTS, THE CONTRACTOR WILL RECTIFY AT            THAT LAND INCLUDING BUT NOT LIMITED TO PRIVATE PROPERTY, ROAD
                  THEIR COST INCLUSIVE OF ANY ADDITIONAL COSTS INCURRED BY RECOR.         RESERVE, PARKS/OPENSPACE, EASEMENTS.

            5.    EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS       24. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION
                                                                                          DRAWINGS AND APPROVALS ON SITE AT ALL TIMES.                                                            E [email protected]
                  SUCH THEIR ACCURACY CANNOT BE GUARANTEED. NO RESPONSIBILITY IS
                  TAKEN BY RECOR OR THE PRINCIPAL FOR THE ACCURACY AND                25. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN
                                                                                                                                                                                                  A 37 MARY ST NOOSAVILLE, QLD
                  COMPLETENESS OF THIS INFORMATION. IT IS THE RESPONSIBILITY OF THE       ACCORDANCE WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN AND                                            P +61 7 5211 1003
                  CONTRACTOR TO ACCURATELY ESTABLISH THE LOCATION AND LEVEL OF            CONSTRUCTION CODE (2013).
                                                                                                                                                                                                 CLIENT
                  ALL EXISTING SERVICES PRIOR THE COMMENCEMENT OF ANY WORKS. ANY
                  DISCREPANCIES SHALL BE REPORTED TO THE SUPERINTENDENT.                                                                                                                           NOVATO GROUP
                  CONTRACTOR TO LOCATE AND PROTECT SERVICES AS REQUIRED DURING
                  PROPOSED WORKS.                                                                                                                                                                PROJECT

            6.    THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND                                                                                                                        UNIT DEVELOPMENT
                  SURVEY ALL CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS SHOWN
                  ON THE DRAWINGS INCLUDING ANY POTENTIAL EXISTING SERVICES
                                                                                                                                                                                                    9 BOTTLEBRUSH AVENUE
                  CLASHES PRIOR TO COMMENCEMENT OF CIVIL WORKS. CONTRACTOR TO                                                                                                                       NOOSA HEADS
                  IMMEDIATELY REPORT ANY DISCREPANCIES TO RECOR AND AWAIT FORMAL
                                                                                                                                                                                                 TITLE
                  DIRECTION PRIOR TO COMMENCING CIVIL WORKS.
            7.    ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS SHALL                                                                                                                COVER SHEET AND
                  BE RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS, FOOTPATHS,
                  CONCRETE AREAS, GRAVEL AREAS, GRASSED AREAS AND ROAD
                                                                                                                                                                                                   LOCALITY PLAN
                  PAVEMENTS.

                                                                                                                                                                                                 PROJECT NO.      DRAWING NO.   STATUS

                                                                                                                                                                                                  20210008        C01           OPW
                                                                                                                                                                                                 DRAWN            DESIGNED      SCALE         ISSUE

                                                                                                                                                                                                 BRP              BRP           NTS            A
Document Set ID: 21694501
                  21635898
Version: 1, Version Date: 09/11/2021
                          01/10/2021
Log in to download the original file

Approved Plans - MCU21-0133 & OPW21-0220.pdf · 6.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.