                                                                                                                                                                                                                                                                   EARTHWORKS NOTES
                                                                                                                                                                                                                                                                   1.    FOR GENERAL NOTES REFER DWG C01, WHICH IS TO BE REQUESTED AND VIEWED PRIOR TO COMMENCEMENT OF CONSTRUCTION IF NOT
                                                                                                                                                                                                               EARTHWORK CUT/FILL VOLUMES:                               SUPPLIED.




                                                                                                                                                            N
                                                                                                                                                                                                                                                                   2.    FOR DETAILED GEOTECHNICAL INFORMATION, REFER GEOTECHNICAL INVESTIGATION REPORT BY TECTONIC. IT IS RECOMMENDED THAT THE
                                                                                                                                                                                                                                                                         GEOTECHNICAL CONSULTANT BE CONTACTED TO CONFIRM THE SOIL CONDITIONS PRIOR TO EARTHWORKS COMMENCING.
                                                                                                                                                                                                               TOTAL CUT:             778.66m³                     3.    GRASS AND TOPSOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF 100MM OVER THE EXTENT OF THE WORKS UNLESS DIRECTED OTHERWISE
                                                                                                                                                                                                                                                                         AND STOCKPILED WHERE REQUIRED FOR FILL OF LANDSCAPING AREAS. TOPSOIL MATERIALS MUST NOT BE USED IN STRUCTURAL FILL.
                                                                                                                                                                                                                                                                   4.    UNSUITABLE NATURAL MATERIALS SUCH AS SATURATED, LOOSE OR SOFT MATERIALS ENCOUNTERED SHOULD BE REMOVED DURING
                                                                                                                                                                                                               TOTAL FILL:            1.64m³                             SUBGRADE PREPARATION FOR BULK EARTHWORKS. ALL UNSUITABLE MATERIAL TO BE REMOVED FROM SITE AT CONTRACTORS EXPENSE.
                                                                                                                                                                                                                                                                   5.    COMPACTION OF THE EXPOSED SAND SUBGRADE REQUIRES SUBSTANTIAL VOLUMES OF WATER COMBINED WITH VIBRATORY COMPACTION
 TEMPORARY SHORING AND/OR                                                                                                                                                                                                                                                EQUIPMENT(E.G VIBRATING PLATE OR MINIMUM 4 TONNE VIBRATING SMOOTH DRUM ROLLER). CARE MUST BE TAKEN TO ENSURE THERE ARE
                                                                                                                                                                                                               BALANCE:            777.02m³ CUT
BATTERS IN ACCORDANCE WITH                                                                                                                                                                                                                                               NO IMPACTS ON SURROUNDING STRUCTURES. MATERIAL TO BE COMPACTED IN ACCORDANCE WITH GEOTECHNICAL REPORT AND AS1289.
                                                                                                                                                                                                                                                                   6.    TEMPORARY SWALE DRAINS TO BE PROVIDED ALONG CREST AND TOE OF ANY CUTS AND ABOVE FILL BATTERS GRADING DISCHARGE TO A
 GEOTECHNICAL CONSULTANTS                                                                                                                                                                                                                                                CONTROL POINT FOR DISCHARGE TO EXISTING STORMWATER INFRASTRUCTURE IN ROAD RESERVE.
             SPECIFICATIONS                                                                                                                                                                                                                                        7.    A MINIMUM 150MM THICK GRANULAR WORKING PLATFORM MAY BE REQUIRED ON SOIL SUBGRADES ALONG HAUL ROADS AND LAYDOWN AREAS
                                                                                                                                                                                                                                                                         TO IMPROVE TRAFFICABILITY. SPECIFIC PLATFORM DESIGN WOULD BE REQUIRED PRIOR TO MOBILISATION AND TRAFFICKING OF ANY HEAVY
                                                                                                                                                                                                                                                                         MOBILE PLANT ON THE SITE.
                                                                                                                                                                                                                                                                   8.    IMPORTED GENERAL FILL MATERIAL SHALL BE SUPPLIED AND COMPACTED WHERE UNSUITABLE NATURAL MATERIALS ARE LOCATED AND AS
                                                                                                                                                                                                                                                                         OTHERWISE NECESSARY TO OBTAIN SUBGRADE/PLATFORM LEVEL. IMPORTED GENERAL FILL MATERIAL SHALL BE CLEAN GRADED MATERIAL
                                                                                                                                                                                                                                                                         FREE OF ORGANIC MATTER AND STONES, WITH MAXIMUM PARTICLE SIZE OF 100mm AND CAPABLE OF BEING COMPACTED INTO COHERENT
                                                                                                                                                                                                                                                                         FILLING TO THE SPECIFIED STANDARD. THE MATERIAL SHALL HAVE A MAXIMUM PLASTICITY INDEX OF 15%, A SHRINK-SWELL INDEX OF LESS
                                                                                                                                                                                                                                                                         THAN OR EQUAL TO 1% AND A MINIMUM C.B.R. OF 10%.
                                                                                                                                                                                                                                                                   9.    ALL EARTHWORKS TO BE CARRIED OUT AT +/- 2% OPTIMUM MOISTURE CONTENT FOR STANDARD COMPACTION.
                                                                                                                                                                                                                                                                   10.   ANY PROPOSED RETAINING WALL WORKS MUST BE WHOLLY WITHIN THE PROPERTY BOUNDARY OF THE SUBJECT SITE, INCLUDING REAR OF
                                                                                                  CH28.0                                                    CH27.7                                                                                                       RETAINING WALL DRAINAGE INFRASTRUCTURE FOR RETAINING WALLS IN CUT. RETAINING WALLS ARE TO BE PREPARED IN ACCORDANCE WITH
                                                                                                                                                                                                                                                                         STRUCTURAL ENGINEERS SPECIFICATIONS, AND IN CONFORMANCE WITH CONSTRUCTION REQUIREMENTS OF GEOTECHNICAL REPORT.
                                                                                                                                                                                                                                                                   11.   REFER ARCHITECT/LANDSCAPE ARCHITECT DRAWINGS FOR CONFIRMATION OF RETAINING WALL COLOUR AND FINISH.
                                                                                                                                                                                                                                                                   12.   ALL EARTHWORKS OPERATIONS SHALL BE CARRIED OUT WITH 'LEVEL 1' SOIL ENGINEERING SUPERVISION IN ACCORDANCE WITH APPENDIX B
                                                                                                                                                                                                                                                                         OF AS 3798. THE NOMINATED GEOTECHNICAL TESTING AUTHORITY SHALL PROVIDE CERTIFICATION THAT ALL GENERAL EARTHWORKS

                                                                                                                     7m
                                                                                                                                                                                                                                                                         OPERATIONS HAVE BEEN CARRIED OUT IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS AND THE CONTROLLED FILL IS SUITABLE

                                                       .5
                                                          m
                                                                                       .0m                        2 .                           .3m                                                                                                                      FOR PURPOSE TO THE REQUIRED BEARING CAPACITY UNDER THE PLATFORM/STRUCTURES AS SPECIFIED BY THE GEOTECHNICAL REPORT.

                                                  -3                                -3                           -                           -3                                                                                                                    13.   ALL EARTHWORKS FILL AND EXCAVATED AREAS SHALL BE COMPACTED TO 98% STANDARD MAXIMUM DRY DENSITY OR A DRY DENSITY INDEX
                                                                                                                                                                                                                                                                         OF AT LEAST 75% IN ACCORDANCE WITH THE GEOTECHNICAL REPORT IN LAYERS OF 250MM LOOSE THICKNESS (PRIOR TO COMPACTION).
                                                                                                                                                                                                                                                                   14.   COMPACTION TESTING TO BE CARRIED OUT AT A MINIMUM OF TWO TESTS PER VERTICAL LIFT WHERE STRUCTURAL FILL HEIGHTS EXCEED
                                                                                                                                                                                                                                                                         300MM IN ACCORDANCE WITH AS3798. CONTRACTOR TO UNDERTAKE ALL EARTHWORKS TESTING IN ACCORDANCE WITH GEOTECHNICAL
                                                                                                                                                                                                                                                                         ENGINEER AND LOCAL AUTHORITY REQUIREMENTS.
                                                                                                                                                                                                                                                                   15.   FINISHED SURFACES TO ALL DISTURBED AREAS ARE TO BE TREATED IN ACCORDANCE WITH LANDSCAPE DRAWINGS.

                                                   9m                                                                                               . 2m                       .   3m                                                                              16.   ALL NEW WORKS TO MATCH NEATLY INTO EXISTING LEVELS.

                                               2 .                                      .8m                               .7
                                                                                                                             m                   -3                         -0
                                                                                                                                                                                                                                                                   17.   ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH APPROVED MANAGEMENT PLANS.
                                              -                                      -2                              -2
                                                                                                                                                                                                                                                                   18.   CONTRACTOR TO ENSURE SUITABLE EROSION CONTROL MEASURES ARE INSTALLED INCLUDING BUT NOT LIMITED TO SHAKE DOWNS, SILT
                                                                                                                                                                                                                                                                         FENCE ETC IN ACCORDANCE WITH EROSION AND SEDIMENT CONTROL PLAN.
                                                                                                                                                                                                                                                                   19.   ADEQUATE SAFETY FENCING/BARRIERS TO BE APPLIED TO ALL BATTERS OR RETAINING WALLS (TEMPORARY OR PERMANENT) AS PER
                                                                                                                                                                                                                                                                         RELEVANT AUSTRALIAN STANDARDS AND LEGISLATION.
                                                                                                                                                                                                                                                                   20.   DUST CONTROL MEASURES ARE TO INCLUDE SPRAYING WATER ON UNPAVED ROADS, ACCESS TRACKS AND STOCKPILES AT A SUFFICIENT
                                                                                                                                                                                                                                                                         LEVEL TO SUPPRESS DUST GENERATION. ADDITIONALLY CONTRACTORS ARE TO COVER OR ENCLOSE STOCKPILES WHERE REASONABLY

                                                                                                                                                            m                         1  m                                                                               PRACTICAL TO RESTRICT DUST MOVEMENT.

                                                        0m                                                                       1m                   3                            0.
                                                                                                                                                                                                                                                                   21.   PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THIS DRAWING, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE

                                                       .                                   .1m                             -2
                                                                                                                             .                    -2.                                                                                                                    WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.
                      31




                                                  -2
                      A




                                                                                         -2
                                                                                                                                                                                                                                                                   22.   ALL EXCAVATIONS ARE TO BE CONDUCTED IN ACCORDANCE WITH THE REQUIREMENTS OF THE GEOTECHNICAL ENGINEER AS OUTLINED IN THE




                                                                                                                                                                                                                                           CH42.8
                                CH0.0




                                                                                                                                                                                                                                                                         GEOTECHNICAL INVESTIGATION REPORT BY TECTONIC. TEMPORARY UNSURCHARGED CUTS IN LOOSE TO VERY LOOSE SAND TO BE FORMED
                                                                                                                                                                                                                                                                         AT 1V:2H, AND IN MEDIUM DENSE SAND AT 1V:1H FOR BATTERS UP TO 3M IN HEIGHT. DEEPER CUTS ARE TO BE ASSESSED BY THE
                                                                                                                                                                                                                                                                         GEOTECHNICAL ENGINEER. PERMANENT CUT AND FILL BATTERS TO BE A MAXIMUM 1V:2.5H.
                                                                                                                                                                                                                                                                   23.   EARTHWORKS FILL BATTERS TO BE MAXIMUM OF 1M IN HEIGHT, OR OTHERWISE RETAINED.
                                                                                                                                                                m
                                                                                                                                                           .1
                                                                                                                                                                                                                                                                   24.   WHERE THE ABOVE TEMPORARY BATTER SLOPES CAN NOT BE ACHIEVED, TEMPORARY SHORING WILL BE REQUIRED UNDER THE ADVICE OF A

                                                                                                                                 m                      -2
                                                                                                                                                                                                                                                                         SPECIALIST SHORING CONTRACTOR.
                                                          m                                  5m                               .5                                                         3m
                                                                                                                                                                                                                                                                   25.   EXCAVATIONS IN PROXIMITY TO EXISTING STRUCTURES WILL REQUIRE SPECIFIC DESIGN TO PREVENT UNDERMINING WHICH SHOULD BE
                                                       .2                                  .                               -1                                                        .
                                                  -1
                                                                                                                                                                                                                                                                         CARRIED OUT BY A SUITABLY QUALIFIED AND EXPERIENCED RPEQ STRUCTURAL ENGINEER.
                                                                                         -1                                                                                        -1                                                                              26.   CONTRACTOR'S RPEQ GEOTECHNICAL ENGINEER IS TO CONFIRM THAT ANY CONSTRUCTED CUT/FILL BATTERS AND RETAINING STRUCTURES
                                                                                                                                                                                                                                                                         ON THE SITE HAVE ACHIEVED ADEQUATE STABILITY WITH A LONG-TERM FACTOR OF SAFETY AGAINST GEOTECHNICAL FAILURES TO THEIR
                                                                                                                                                                                                                                                                         SATISFACTION.
                                                                                                                                                                                                                                                                   27.   EARTHWORKS LEVELS SHOWN ARE NOMINALLY 200MM BELOW FINISHED DESIGN SURFACE LEVELS INCLUSIVE OF TOPSOIL LAYER.
                                                                                                                                                                                                                                                                         CONTRACTOR TO CONFIRM FINISHED SURFACE LEVLS BASED ON STRUCTURAL ENGINEERING DRAWINGS FOR BUILDING SLAB THICKNESSES
                                                                                                                                                                                                                                                                         AND HYDRAULIC DRAWINGS FOR SUB-FLOOR DRAINAGE TO CONFIRM EARTHWORKS SURFACE LEVEL.
                                                                                                                                                                                         m                                                                         28.   ANY PRELOADING REQUIRED IS TO OCCUR IN ACCORDANCE WITH THE GEOTECHNICAL ENGINEERS REQUIREMENTS. CONTRACTOR TO ALLOW

                                                                                                                               7m                           6m                        .5
                                                                                             7m
                                                                                                                                                                                                                                                                         FOR THE IMPORT AND REMOVAL OF ALL NECESSARY MATERIAL TO UNDERTAKE THE PRELOADING OPERATIONS.
                                                           3m                              .                                  .                            .                       -0
                                                    0.                                                                                                   0                                                                                                         29.   REFER ARCHITECTURAL DRAWINGS FOR BUILDING SETOUT.
                                                                                                                           -0
                      31




                                                                                         -1                                                             -
                      B




                                                   -




                                                                                                                                                                                                                                           CH42.8
                                CH0.0




                                                                                                                                                                                                                                                                          DEPTH LEGEND

                                                                                                                                                                                                                                                                                -3.8 to -3.6
                                                                                                                                                                                                                                                                                -3.6 to -3.4
                                                                                                                                                                                                                                                                                -3.4 to -3.2
                                                                                                                                                                                                                                                                                -3.2 to -3.0
                                                                                                                                                                                                                                                                                -3.0 to -2.8
                                                                                                                                                                                                                                                                                -2.8 to -2.6
                                                                                                                                                                                                                                                                                -2.6 to -2.4
                                                                                                                                                                                                                                                                                -2.4 to -2.2
                                                                                                                                                                                                                                                                                -2.2 to -2.0
                                                                                                                                                      CH0.0                                                                                                                     -2.0 to -1.8
                                                                                               CH0.0                                                                                                                                                                            -1.8 to -1.6
                                                                                                                                                                                                                                                                                -1.6 to -1.4
                                                                                                                                                                                                                                                                                -1.4 to -1.2
                                                                                                                                          31
                                                                                                                                          D
                                                                                         31




                                                                                                                                                                                                                                                                                -1.2 to -1.0
                                                                                         C




                                                                                                                                                                                                                                                                                -1.0 to -0.8
                                                                                                                                                                                                                                                                                -0.8 to -0.6
                                                                                                                                                                                                                                                                                -0.6 to -0.4
                                                                                                                                                                                                                                                                                -0.4 to -0.2
                                                                                                                                                                                                                                                                                -0.2 to -0.0
                                                                                                                                                                                                                                                                                0.0 to 0.2
                                                                                                                                                                                                                                                                                0.2 to 0.4
                                                                                                                                                                                                                                                                                0.4 to 0.6
                                                                                                                                                                                                                                                                                0.6 to 0.8
                                                                                                                                                                                                                                                                                0.8 to 1.0



                                                                                                                              SCALE:                                                                 CLIENT:                                        APPROVED BY:                               PROJECT NAME:

                                                                                                                                                                                                                                                                                               RESIDENTIAL UNITS AT 37 BOTTLEBRUSH AVE
                                                                                                                                                                    1:100                                                                                                                      TITLE:                                               STATUS:

                                                                                                                                                                                                                                                                                               BULK EARTHWORKS PLAN                                 MCU / OP WORKS
         © ABN 89 647 469 707            C        29/11/22      RFI UPDATE                          BRP    JB        BRP
                                                                                                                                       SCALE 1:1000
                                                                                                                                                                                                      BOTTLEBRUSH PROPERTY PTY LTD                            BEN PARRY
                                         B        10/10/22      RFI UPDATE                          BRP    MVP       BRP                  10                          50                      100M
            37 MARY ST                                                                                                                                                                                                                                        RPEQ: 28084
                                         A        12/05/22      MCU / OPW ISSUE                     BRP    BRP       NW
        NOOSAVILLE, QLD 4566                                                                                                                                                                                                                                  CPEng NER                        DRAWING NUMBER:                                      PROJECT NUMBER:                                      REV:
           +61 7 5211 1003              REV        DATE                  DESCRIPTION               DWN     CHK       APP                                                                                                                                                                                                                                                                        SHEET
                                                                                                                                                                                                                                                             DATE: 29/11/22                                                                                                                      SIZE:
       RECORCONSULTING.COM                                                   REVISIONS                                                                                                                                                                                                         C30                                                   20220051                                    A1 C

Used in these records

About this file

File size
5.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

RFI - Engineering Plans.pdf · 5.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.