Skip to the record
Accept no substitutions.

Council archive · source document

RFI - Appendix C Traffic Engineering Report · MCU22/0038

of 18

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Information Required
8.      Provide amended plans demonstrating compliance with Clause 5.3 HEADROOM of
        AS/NZS 2890.1:2004.
Issue
From the provided documentation it is not clear that a B99 vehicle will be able to turn around
at the proposed Turn Around Bay located on the NE corner of Basement 02 using a maximum
3 point turn manoeuvre.
Information Required
9.      Provide travel paths for a B99 vehicle, demonstrating how it will turn around at the
        proposed Turn Around Bay located on the NE corner of Basement 02, without having to
        use more than a 3 point turn to do so.
3.      DUE DATE FOR RESPONSE TO INFORMATION REQUEST

The due date for providing the requested information is 19 July 2022. Email your response to
[email protected]. Please advise Council of your response to this information request
in accordance with section 13 of the Development Assessment Rules.
If you do not provide a response before the due date, it will be taken as if you have decided
not to respond to the information request and Council will continue with the assessment of
your application.
4.      OTHER DETAILS

You can follow the progress of this application online at www.noosa.qld.gov.au. The “Online
Services” page can be accessed via "Quick Links" on the left hand side of the screen.
Should you have any further queries in relation to the above, please do not hesitate to contact
me on the number above.




                                                                                       Page 4 of 5

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

RFI - Appendix C Traffic Engineering Report.pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.