Original source · versioned page text
A6107-22-L9-D01 [G] Drainage Layout
D 10
W
SP195871
E
S m
E
T
W
95 t N
P1 D
ALL WORKS TO BE CARRIED OUT IN STRICT
13
87 ACCORDANCE WITH APPROVED SETTLERS
1 MH D COVE NOOSA RESIDENTIAL HIGH DENSITY
W
W
T ENVIRONMENTAL MANAGEMENT PLAN (EMP1)
MH E S
W DATED 21 JULY 2005 BY WBM OCEANICS.
D
S E
E
S
W
NOTE:
14
S
S D PROPOSED 900x900 GRATED
S
E
PROPOSED STORMWATER PIT Em PIT WITH CLASS 'B' BOLT - REFER TO HYDRAULIC CONSULTANT'S
SP1 t S DETAILS FOR ALL DOWNPIPE &
13
S DOWN GRATE
WITH FOX GPT 'BPT600' LOCATION 958 P STORMWATER CONNECTIONS
TO DISCHARGE TO PIT 1/2. REFER 71 MH Ø52 (PLUMBING & DRAINAGE APPROVAL).
11
TO HYDRAULIC CONSULTANTS MH
2 EM 5 - ALL NEW BUILDING ROOFS TO BE PIPED
E
DETAILS PIP DRGEN TO RAINWATER HARVESTING TANKS
10
10 E C EXISTING HEADWALL
Y FOR EVENTS UP TO 100 YEAR ARI VIA
12
PROPOSED STORMWATER PIT SEALED PIPED NETWORK
WITH FOX GPT 'BPT600' LOCATION - RWH TANK OVERFLOW TO BE PIPED TO
X
TO DISCHARGE TO PIT 1/2. REFER SOUTH RIPs VIA SEALED PIPE NETWORK
8
TO HYDRAULIC CONSULTANTS FOR EVENTS UP TO 100 YEAR ARI
DETAILS - ALL UPPER LEVEL STORMWATER TO BE
15
X
OUT COLLECTED IN A "FOX BPT600" GROSS
9
1 1 10 POLLUTANT TRAP PRIOR TO
2 PROPOSED OUTLET VIA PRECAST CONNECTION TO R.I.P.'S. BASEMENT &
4
X
RC HEADWALL. LOCATED ADJACENT CARPARK DRAINAGE SUMP & PUMP
PROPOSED STRIP DRAIN TO EXISTING HEADWALL. CLEAR AREA & DETAILS TO HYDRAULIC CONSULTANT'S
CONNECT TO PIT 1/1 . REFER PROVIDE 10m2 200 DIA ROCK SCOUR SPECIFICATIONS.
14
X
HYDRAULIC CONSULTANTS PROTECTION OVER A14 GEOFABRIC. - ALL HARDSTAND AREAS MUST ONLY
100 DRAWINGS FOR DETAILS
ALL ROOFWATER TO BE SIZED
FOR Q100 EVENT AND 605 DISCHARGE TO RIPs AND MUST NOT
13
DISCHARGE TO RAINWATER
SP305332 DISCHARGE TO 80kL RAINWATER
X
00
SP195871 HARVESTING TANK
Ø3
11
13
HARVESTING TANK VIA SEALED
PIPE NETWORK PARALLEL STORMWATER LINE 4
00
Ø3
10
X
1
1
12
7
2
2
X
Ø2
25
8
0 0
Ø3
12
X
L9 (SOUTH)
UP
9
4437m²
IPE
X
2
YP
9
NC
1
GE
SP195871 LEGEND
X
ER
EM
75 PROPOSED STORMWATER DRAINAGE
25
12 Ø3
Ø5
X
22 A
11
PROPOSED EMERGENCY
|
PROPOSED 80kL RAINWATER
65
| |
| |
| | HARVESTING TANK. TANK OVERFLOW STORMWATER DRAINAGE
RP mt
12
10
| |
OVERFLOW PIPE TO CONNECT
EX
| |
SEALED ROOFWATER PIPE NETWORK
20
00
| |
TO RIP VIA SEALED PIPE
14.0
Ø3
|
|
| | NETWORK PROPOSED VEGETATED SWALE
2
7
| |
| |
X
|
| | 13
3 4
1
|
| 12
PROPOSED OVERLAND FLOW PATH
8
Ø3
14
X
75
13
X PARALLEL STORMWATER LINE 4
PROPOSED BASEMENT WALL
10
9
X
14
X
150 ROCK & BIDIM BETWEEN | | | | | | | | | | | | | |
PROPOSED TOP OF BATTER
X T1
PROPOSED EMERGENCY WALL AND EXISTING PATHWAY. PROPOSED TOE OF BATTER
X 3 > > >
PIPE TO OUTLET FROM RIP. REFER DETAIL D02
X
PROPOSED SWALE
X 606
0
> >
FLO NC ROUT IDE
Ø30
3 FINISHED SURFACE CONTOUR
W Y (> ED
X
IR 00)
OV ER T G m W
5
SP195871
9.0
OUT
> > 4
X
WE Q1
1
RL
EM MEN ED 3
4 EXISTING SURFACE CONTOUR
m
00
X 4
11
12
> > 10
1.0
Ø|3
HABITAT PROTECTION FENCE TO BE ERECTED
CE POS
1
||
10
OUT EXISTING ELECTRICAL RETICULATION
PRIOR TO COMMENCEMENT OF CLEARING WORKS VEGETATED SWALE X > > E
ER GE
||
X6
O
1 PR
PROVIDE SIGNAGE AT 50m SPACINGS " ECOLOGICAL EXISTING TELSTRA RETICULATION
||
X > > > Ø375
T
||
RESTORATION AREA - NO ACCESS
E > > > | | | | | | | | | | | | | D EXISTING STORMWATER DRAINAGE
|
| |
X | |
|
X
| | |
7
|
9 8 W EXISTING WATER RETICULATION
CO SP195871 X X X X X X X
N S EXISTING SEWER RETICULATION
ARE SERV
m
BUND RL9.25MIN
A (P ATIO
1.0
OS
CW N
P) PROPOSED RAPID INFILTRATION
PITS 5 OFF @ 1800dia x 1.8m DEEP.
REFER DETAIL. SL8.75 0 4 8 12 16 20m
SCALE 1:200 A1, 1:400 A3
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
PBL PROJECT: DRAWING TITLE:
Brah 101 pty ltd t/a Alta Projects
Drawn: PBL
A.B.N. 91 611 354 511 DRAINAGE LAYOUT
FOR APPROVAL Date: JUNE 2021 26 Memorial Avenue, Cotton Tree PROPOSED RESIDENTIAL DEVELOPMENT LOT 9
PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
G
F
29/08/2024
17/02/2023
REVISED ISSUE FOR APPROVAL, EMERGENCY PIPE ADDED
REVISED TANK OUTLET PIPE LOCATION
PBL
PBL
S.H.
SKH Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607 at SERENITY CLOSE, NOOSA DRAWING No:
A6107/22/L9/D01 G 1 of 1
E 16/12/2022 CONSTRUCTION ISSUE PBL S.H. STEVEN HARRISON
Email: [email protected]
D
A
07/12/2022
20/06/2022
CONSTRUCTION ISSUE
ISSUE FOR APPROVAL
PBL
PBL
S.H.
S.H.
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for CAPE BOUVARD DEVELOPMENTS
REV DATE DESCRIPTION BY CHKD RPEQ - 4784 A1 SHEET SIZE CouncilX-LANDSCAPE
FILENAME : a6107-22-L9-D01.dwg - DATE : 29/8/24 - 2:37pm - XREF's: X-BASE; X-ARCH LOWER GROUND; X-ARCH UPPER GROUND; X-ARCH STG4B LANDSCAPE; X-ARCH STG4B LANDSCAPE LEVELS; X-ARCH STG4B LEVEL1; X-SURVEY; X-LANDSCAPE LOWER; X-ARCH STG4B BASEMENT; Ref: UPPER; H-Approved-SH; H-Checked-SH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original