Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Info response

of 2

Page text shows just the words. Original shows the document exactly as it was published.

21 February 2022


Noosa Council
[email protected]


RE:    Response to Further Information Request RAL21/0033 – 60 Glenridge Dr
       Cooroibah Qld 4565


Council issued an information request on 21 January 2022. The applicant provides the
following additional information in response to the items:

Items 1 – 20 (Ecology, Bushfire and Restoration)

Please find attached response from Conor Neville and Josh Lee responding to the relevant
matters associated with ecology, bushfire and restoration.

   21. Provide additional detail regarding:
       21.1. The available sight lines/distances at the proposed intersection with
       Glenridge Drive and demonstrate that the sight lines/distances are in
       accordance with PSP6
       21.2. The vehicle access to Lots 3-7
       21.3. The access driveway to lots 3 & 5

Please find attached the Engineering Report provided by TOD Consulting Engineers. The
report addresses sight lines associated with the access.

   22. Provide additional detail on the impacts (depth, velocity, safety) of 100%
       blockage of the stormwater culverts on the proposed new road
   23. Include additional comments regarding the probable maximum flood (PMF)
       and the impacts on the safety of residents (within the site and on adjoining
       properties) and road users.

Peak Urban describes that in the 100% blocked scenario, the depth of flow exceeds the
0.2m criteria on the upstream lane (with depths up to 0.25m noted), however, is less than
0.2m on the downstream lane. Flow velocity is up to 1.75m/s. Approximately 80m of the
road has a hazard greater than the 0.3m2/s criteria (with hazard up to 0.5m2/s
noted). Assessment of the PMF is presently being undertaken with further modelling to
be provided at the end of the week.

   24. Provide additional comment in regard to the recommended minimum floor
       levels and the potential impacts of the PMF.
   25. Provide additional detail to demonstrate that the development (access and
       all lots) achieves compliance with The Flood Hazard Overlay Code –
       Performance Outcome PO4.

Assessment of the PMF is presently being undertaken, however, if access out of the
development is compromised in the PMF event, appropriate flood refuge will be provided
within the development (likely in conjunction with the Cul-de-Sac).
Log in to download the original file

Info response.pdf · 544 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.