Original source · versioned page text
Proposal Plans
The original of this document is very large (12.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 7, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn MR MR MR MR CP
ROOF
FFL 127.000
sign
U 08
MEZZANINE
FFL 124.000
U 09 U 10
MAIN LEVEL BINS
FFL 121.000
fill
SECTION A
SCALE 1:200 @ A3
MR MR MR MR MR
ROOF ROOF
FFL 127.000 FFL 127.000
MEZZANINE MEZZANINE
FFL 124.000 FFL 124.000
U 05
U 06 U 07 U 08
U 05 caretaker storage
MAIN LEVEL MAIN LEVEL
FFL 121.000 DECK bio retention FFL 121.000
fill
basin
SECTION B
SCALE 1:200 @ A3
MR MR MR MR MR MR MR MR MR
ROOF ROOF
FFL 127.000 FFL 127.000
MEZZANINE MEZZANINE
FFL 124.000 FFL 124.000
pergola
U 01 U 02
U 03 U 04 U 05
caretaker
MAIN LEVEL MAIN LEVEL
FFL 121.000 planter planter DECK FFL 121.000
planter planter
SECTION C planter planter
planter
SCALE 1:200 @ A3
FG MR PW MR MR
ROOF
FFL 127.000
ROOF
FFL 127.000 EXT. FINISHES LEGEND BLK masonry blockwork. FT1 floor tile (no refers to type). MR1 metal roof - (no refers to type). SP structural post, refer engineer.
DA for Development Approval
AS aluminium screen. C carpet fire fireplace NGL natural ground line. SF structural footing, ref. eng. issue issue / amendment
AL aluminium louvres, refer sched. CS concrete slab. flue flue kit PF compliant pool fencing TIM timber cladding. 19.11.2021 LF/ AB
MEZZANINE MEZZANINE issue date drawn by
FFL 124.000 FFL 124.000
ASD aluminium sliding door. DP down pipe. GS garage slab. PW parapet wall. TD timber deck. client
Maroolingar P/L ATF Twenty20 UT
U 12 AFD aluminium framed door. DS driveway slab. HWS hot water service. PS patio slab. TF timber floor. project
aluminium framed window. fibre cement awning. handrail. photovoltaic cells. timber framed door Maroolingar Twenty20 Cooroy
COVERED EXCLUSIVE-USE AFW FCA HR PV TFD
location
MAIN LEVEL MAIN LEVEL
OUTDOOR AREA BA sun control battens, refer detail. FC fibre cement ext. cladding. LPG LPG gas bottle. RWT rain water tank. VER vergola. Lot 4, Taylor Ct. Cooroy
FFL 121.000 FFL 121.000
BAL1 balustrade-(no refers to type). FG fascia gutter. NGL NRG board SBJ silicone butt jointed glass. SECTIONS
Aboda Lee Foster • director Scott Falconer • director
SECTION D
Design p - 0424 620 247 p - 0431 267 157
Group e - [email protected] e - [email protected]
the aboda design group trust Level 2 1794 David Low Way Coolum Beach,
ABN 56 266 884 746 Q. 4573. PO box 2449 Noosa Heads Q 4567
SCALE 1:200 @ A3
t/a aboda design group • BSA License -150580097 • www.aboda.com.au
• This drawing is to be read in conjunction with engineers drawings & reports • Construction
to comply with all relevant SAA & NCC Codes & standard Bldg By-law 1975 & as amended •
Copyright for design & drawings remain the property of the authors • Verify all dimensions on
site prior to commencement of any works • These drawings are not to be used for scaling.
scale as shown @ A3 issue
drawing no.
SECTIONS WD.601 DA
SCALE 1:100 @ A3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.