Original source · versioned page text
Attachment C - Amended Engineering Plans
Original PDF page 3, section 3. The text section number identifies this passage in the reader.
\
\
RM
\
\
\
\
\
\
\
\
\
\
\
\
(A) DURING CONSTRUCTION
\
\
\
\
\
\
\
\
\
\
\
\
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
INSTALL CUT-OFF DRAINS AND CHECK DAMS AS PRIOR TO STRIPPING
\
\
\
RM
\
(i) DAILY DURING DRY WEATHER
\
\
\
\
\
\
\
\
D
\
D
\
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
D
\
\
\
\
\
\
\
\
\
\
\
\
\
\
IDENTIFIED. OF TOPSOIL AND D D
(ii) PRIOR TO PREDICTED STORM EVENTS
RM
BULK EARTHWORKS
E/OH
(iii) TWICE DAILY DURING PROLONGED RAIN
RM
RM RM RM RM RM RM RM RM RM
S150 S150 S150 S150 S150 S150 S150 S150 S150
(iv) DURING AND AFTER MAJOR STORM EVENTS
T
S150 S150 S150
HOLD POINT SUPERVISING ENGINEER S150
X X X X X X X X X X (B) DURING DEFECTS LIABILITY PERIOD
RM
TO SIGN OFF
X
(i) WEEKLY DURING DRY WEATHER
RM
(ii) PRIOR TO PREDICTED STORM EVENTS
T
INSTALLATION OF EROSION AND SEDIMENT CONTROL
X
(iii) TWICE WEEKLY DURING PROLONGED RAIN
RM
MEASURES SUCH AS INLET PROTECTION, CHECK
(iv) DURING AND AFTER MAJOR STORM EVENTS
X
DAMS, WINDROWS ETC AS IDENTIFIED ON THE ESC
RM
E/UG
E/UG
E/UG
E/UG
DRAWINGS AND AS DIRECTED ON SITE BY THE
RM
E/UG
3. THE CONTRACTOR IS TO CONSTRUCT AN ENTRY/EXIT SEDIMENT TRAP
X
SUPERVISING ENGINEER. STORE STORE STORE STORE STORE STORE STORE STORE STORE STORE STORE STORE
AS DETAILED PRIOR TO THE COMMENCEMENT OF ANY EARTHWORKS.
RM
NOTE: EROSION AND SEDIMENT CONTROL MEASURES ARE TO REMAIN IN
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment C - Amended Engineering Plans.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.