Original source · versioned page text
Attachment C - Amended Engineering Plans
The original of this document is very large (17.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 21, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn |
|
//
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
| |
|
WATER RETICULATION NOTES ENVIRONMENTAL CONDITIONS
|
| |
|
|
|
|
|
|
|
//
|
|
|
|
|
|
|
|
|
|
|
| | | | |
|
| | | | | | | | |
|
|
| | | | | | | | | | |
|
|
| |
| || || || || ||
|
//
|
|
D
|
|
BIO BASIN
|
|
|
|
|
//
|
|
|
|
VEGETATION PROTECTION
|
1. RETICULATION MAINS ARE TO BE LAID AT 1.50m OFF PROPERTY
|
|
//
|
|
|
|
|
|
|
//
ALIGNMENT UNLESS OTHERWISE DIRECTED BY SHIRE ENGINEER. A. TREES LOCATED ALONG THE FOOTPATH SHOULD BE, WHERE
//
D
2. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT POSSIBLE TRANSPLANTED PRIOR TO CONSTRUCTION, OR
//
D
//
SOUTH EAST QUEENSLAND WATER SUPPLY CODE SPECIFICATIONS AND REPLACED IF DESTROYED.
//
//
STANDARDS. B. WHEN WORKING WITHIN 4m OF TREES, RUBBER OR HARDWOOD
//
//
3. UNLESS SPECIFIED OTHERWISE ALL MATERIALS AND WORK SHALL GIRDLES SHOULD BE CONSTRUCTED WITH 1.8m BATTENS
D
//
CLOSELY SPACED AND ARRANGED VERTICALLY FROM GROUND
//
COMPLY WITH THE RELEVANT AUSTRALIAN STANDARDS.
//
4. ADOPT LIP OF KERB OR SHOULDER OF ROAD AS PERMANENT LEVEL. LEVEL. GIRDLES MUST BE STRAPPED TO TREES PRIOR TO
//
5. COVER ON MAINS FROM PERMANENT LEVEL TO BE AS FOLLOWS: - CONSTRUCTION AND REMAIN UNTIL COMPLETION.
//
D
//
D
C. WHERE POSSIBLE, TREE ROOTS SHOULD BE TUNNELLED UNDER,
//
//
NOMINAL DIAMETER RATHER THAN SEVERED. IF ROOTS ARE SEVERED THE DAMAGED
//
LOCATION
//
≤150 ≥200 AREA SHOULD BE TREATED WITH A SUITABLE FUNGICIDE.
D
//
>
NON-ROADWAYS 600 1000 CONTACT COUNCIL ARBORIST FOR FURTHER ADVICE.
//
>
//
>
>
SEALED ROADWAYS 600 1000
//
>
>
>
//
> >
>
> D >
SOIL
D
>
MAJOR ROADWAYS/
>
>
//
| |
> > >
| |
> S150 > S150 S150 S150 S150 S150 S150 S150 S150
| |
S150 S150 S150
750 1000
> S150
S150 S150 S150 > S150
| |
S150
A. TOPSOIL AND SUBSOIL SHOULD BE STOCKPILED SEPARATELY.
//
S150 >
| |
EMBANKMENTS
||
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
D | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
//
> > > > >
B. CARE SHOULD BE TAKEN TO PREVENT SEDIMENT FROM ENTERING
//
RM// RM// RM RME/UG RME/UG RME/UG RME/UG RME/UG RME/UG RM RM RM RM RM RM RM RM
E/UG RM
E/UG RM
E/UG RM
E/UG
FREEWAYS 1200 1200
// // //
E/UG
// // // // //
E/UG// E/UG E/UG E/UG E/UG E/UG E/UG E/UG E/UG
T W T FH T W T W W100 T
W T
W
T W100 W
T
W
T
W100 W
T T
W W100 W T
W W100 W W W100 W W W100W W W W W W THE STORMWATER SYSTEM. THIS MAY INVOLVE PLACING
E/UG
T T T T
E/OH E/OH E/OH E/OH E/OH E/OH E/OH E/OH E/OH
T T T T T T T
6. CONDUITS TO BE INSTALLED IN ACCORDANCE WITH THE STANDARD APPROPRIATE SEDIMENT CONTROLS AROUND STOCKPILES.
E/UG
E/OH E/OH E/OH E/OH E/OH E/OH E/OH E/OH E/OH E/OH E/OH
DRAWINGS.
7. A WATER METER SUPPLIED AT THE DEVELOPER'S COST, IS TO BE REHABILITATION
D
INSTALLED AT THE SERVICE POINT OF EACH LOT IN ACCORDANCE WITH A. PREDISTURBANCE SOIL PROFILES AND COMPACTION LEVELS See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.