Delegated Report - Code - Planning MCU22 0199 · MCU22/0199

of 14

Text shows just the words. Original shows the document exactly as it was published.

                      Bushfire Management
               12.    An accessible dam, swimming pool or water tank (in addition to day to day water supply) with
                      an onsite water volume of not less than 5,000 litres must be available for firefighting
                      purposes, located within reasonable proximity to building.
               13.    A water supply outlet pipe 50 millimetres in diameter and fitted with a standard fire brigade
                      fitting must be connected to the water supply (other than where the water supply is in a
                      swimming pool or dam).
                      ENGINEERING
                      Site Access and Driveways
               14.    A sealed access driveway must be provided from Cooroy Belli Creek Road to all parking and
                      manoeuvring areas of the development. The access driveway must be located and
                      constructed to not adversely affect the existing conditions of the local road network. The
                      works must be undertaken in accordance with an Operational Works approval, be generally
                      in accordance with SCG Consulting’s Driveway Re-Aligning Plan (33002-DR1.1) dated April
                      2023 and be constructed using compacted gravel and seal as described on RS-056.
                      Stormwater Drainage
               15.    Stormwater runoff from the development must be disposed of on-site without causing scour
                      or damage to the subject site or any adjoining property.
                      Easements
               16.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               17.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               18.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Geotechnical Stability
               19.    All works must be carried out in accordance with the recommendations contained in section
                      7 of Core Consultants’ Geotechnical Investigation & Stability Assessment (J001783-001-R-
                      Rev1).
                      Earthworks and Retaining Walls
               20.    All earthworks and associated batters for the new dwelling must be undertaken generally in
                      accordance with SCG Consulting Engineers Plan No 33002-C2.1 dated February 2022 and
                      the recommendations contained in the Geotechnical Investigation & Stability Assessment –
                      Report No J001783-001-R-Rev 1 prepared by Core Consultants.
                      Damage to Services and Assets
               21.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.



                                                                                                     Page 12 of 14

Document Set ID: 22360332
Version: 6, Version Date: 19/05/2023

Used in these records

About this file

File size
3.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning MCU22 0199.pdf · 3.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.