13. As a general rule, a site is determined to have achieved effective short-term stabilisation if
at the time of the plan sealing inspection:
a. Methods of stabilisation are:
• appropriate for slopes and slope lengths; and
• are consistent with best practice environmental management practices such as
in the Manual for Erosion and Sediment Control or the IECA Manual; and
b. Stormwater runoff from the site is not currently, and is not likely to result in visible
evidence of sedimentation or erosion, or lead to water contamination.
If at the time of request for plan sealing, the method of short-term stabilisation has not
achieved a level of stability that Council's Officers believe will have a high probability
of achieving long term stability (i.e. until house construction has occurred on all lots),
Council Officers may take the following matters into consideration in determining
whether the site is capable of achieving medium to long-term stability:
• evidence that the site has been effectively stabilised in the short term;
• evidence that soil has been adequately ameliorated;
• evidence that seed of annual and perennial grass species has been applied at
an adequate rate; and
• that grass seed has germinated at a density that is likely to achieve an effective
grass cover.
For example, while hydromulch can provide an immediate and effective stabilising
cover to soils, the protective cover can be relatively short-lived if vegetation fails to
establish before the thin layer of mulch decomposes. So if hydromulch is selected as
the method of temporary short term stabilisation, Council Officers will seek to confirm
that perennial as well as annual grasses are well established at the time of plan sealing
to reduce the risk of instability of the site in the medium to long term. As a general rule,
hydromulch will only be accepted as a “patch” fix and should comprise no more than
20% of the exposed site area due to the high risk of failure. Due to the requirement to
progressively stabilise exposed areas, it is not envisioned that this will present any
difficulties for an appropriately managed and compliant site.
Building and Construction Industry (Portable Long Service Leave) Levy
14. Where it is required, the QLeave levy should be paid prior to arranging the prestart meeting.
The details that the Levy has been paid must be submitted to Council prior to the prestart.
QLeave contact: 1800 803 481 (free call) or (07) 3212 6855.
7. PROPERTY NOTES
Not applicable.
8. VARIATION APPROVAL DETAILS
Not applicable.
9. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Building Works All Building Works
10. SUBMISSIONS
Not appliable.
Page 11 of 13
Document Set ID: 24010585
Version: 4, Version Date: 08/08/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - MCU18 0008 01 & OPW18 0013 01 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 181 KB (small file)
- File type
No other editions are linked here.