Minor Change Existing Approval - MCU18 0008 01 & OPW18 0013 01 (As Published) · MCU18/0008.01

of 13

Text shows just the words. Original shows the document exactly as it was published.

                      Water & Sewer Connections
               9.     An underground connection to reticulated water and sewerage must be provided to the
                      development site in accordance with the standards and requirements of Northern SEQ
                      Distributor–Retailer Authority (Unitywater).
               10.    A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater)
                      must be submitted to Council that certifies an underground connection to reticulated water
                      and sewerage has been provided to the development site.
               ENVIRONMENTAL HEALTH
                      Outdoor Lighting Devices
               11.    Lighting associated with the use must be designed, sited, installed and tested to comply with
                      Table 2.1 & 2.2 of Australian Standard AS4282-1997 “Control of the obtrusive effects of
                      outdoor lighting” using a control level of 1.
                      Waste Disposal
               12.    The developer must provide waste storage and disposal facilities in accordance with
                      Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and
                      Industrial Premises”. The facilities must include an external impervious area correctly sized
                      for all refuse and recycling containers and suitably screened from public places and
                      neighbouring properties. A bin wash area is required with a cold-water tap, hose and drain
                      outlet connected to sewer, via a bucket trap. The drain outlet must be designed to prevent
                      storm water entry to the sewerage system. This can be achieved with a nib wall 50mm high
                      and up to 700mm x 700mm wide (max 0.5m²), or alternatively the waste area can be roofed,
                      or any other design approved by Council.
               13.    Refuse containers must be provided in accordance with the requirements of the
                      Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
                      Regulation 2000, for the storage and collection of refuse.
               ENGINEERING
               14.    A minimum of 14 car parking spaces and 4 motor cycle spaces must be provided on the site
                      which includes 1 disabled space. One loading bay in addition to the 14 car spaces as
                      indicated on the approved plans.
               15.    The development is approved for deliveries by a Small Ridged Vehicle (SRV – L: 6.40m, W:
                      2.33m).
               16.    Six (6) bicycle parking spaces must be provided on-site and a minimum of 1 end of trip locker
                      facility must be provided to each industrial tenancy.
               17.    All car parking areas and access driveways must be maintained exclusively for vehicle
                      parking and manoeuvring and kept in a tidy and safe condition at all times.
               18.    To ensure pedestrian safety between vehicles exiting the site and pedestrians on the
                      footpath, the driveway and any associated fencing or vegetation near the driveway must
                      comply with the minimum sight line requirements as defined in AS 2890.1, section 3.2.4.
                      Stormwater Drainage
               19.    Stormwater runoff from the development must be disposed of on-site generally in accordance
                      with the approved engineering plans and must not cause scour or damage to the subject site
                      or any adjoining property.
                      Electricity and Telecommunication Services
               20.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.




                                                                                                      Page 3 of 13
Document Set ID: 24010585
Version: 4, Version Date: 08/08/2025

Used in these records

About this file

File size
181 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval - MCU18 0008 01 & OPW18 0013 01 (As Published).pdf · 181 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.