Minor Change Existing Approval - MCU18 0008 01 & OPW18 0013 01 (As Published) · MCU18/0008.01
5. Turfed areas within the Vision Court road reserve must:
a. join smoothly and level with adjoining surfaces; and
b. be free of disease, pest, weeds, rock and debris.
6. Landscape works must:
a. be in accordance with Planning Scheme Policy PSP 3 Landscaping Plants and
Guidelines;
b. take all measures to prevent Fire Ants (or any stages of the fire ant life cycle) entering
the work site;
c. take all measures to prevent Myrtle Rust infection;
d. not obstruct overland flow paths and must include adequate drainage to minimise
ponding. Mulch or any floatable material must not be located in swales, overland flow
paths or around grated drains;
e. not encroach onto kerb and channel, footpaths, pedestrian or vehicular/ circulation
areas;
f. not restrict access to service meters;
g. delineate all garden to grassed area interfaces with a hard edge;
h. ensure sales signage and ancillary infrastructure is not installed within the road
reserve;
i. ensure permanent irrigation is not installed within the road reserve;
j. ensure all weeds and debris are removed from planting areas prior to planting; and
k. ensure mulch is aged, comprised of leaf and limb material of varying sizes, free of
foreign matter including anthropogenic waste, rock, soil / sediment contamination and
is applied to ensure a minimum 100mm depth once settled.
7. Soil provided for landscaping must provide for the site specific vegetation performance
objectives.
8. All landscape works must be completed prior to the commencement of use.
PRIOR TO THE COMMENCEMENT OF WORKS
Engineering
9. A condition report including photographs of the frontage of the site must be completed and
submitted to council prior to the prestart meeting and any works commencing.
10. A condition report including photographs of all fences and retaining walls bordering the site
and any buildings, structures, pathways, landscaping features etc on adjoining properties
that could potentially be impacted on by the proposed earthworks and construction works
must be completed and submitted to Council prior to the prestart meeting.
11. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any subcontractors also have the appropriate insurance and public liability
documentation. Certificates demonstrating currency of public liability insurance and works
insurance covering the works must be submitted to Council prior to the prestart meeting.
Page 5 of 13
Document Set ID: 24010585
Version: 4, Version Date: 08/08/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - MCU18 0008 01 & OPW18 0013 01 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 181 KB (small file)
- File type
No other editions are linked here.