Minor Change Existing Approval - MCU18 0008 01 & OPW18 0013 01 (As Published) · MCU18/0008.01

of 13

Text shows just the words. Original shows the document exactly as it was published.

               18.    All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
                      who is independent of the Developer and Principal Contractor, and they must certify that all
                      works conform to the Operational Works permit. Where municipal works are involved, such
                      confirmation must be submitted for the respective hold points prior to any site inspection by
                      Council Officers.
               19.    All works must be constructed and work procedure undertaken in accordance with:
                      a.      The approved plans/documents and conditions detailed in this Decision Notice
                      b.      All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines
                      c.      The latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site
               20.    Pavement design for privately owned works must be undertaken in accordance with the
                      relevant standards. Structural integrity of the driveway and car park areas will remain the
                      responsibility of the property owner/developer and must be certified by an RPEQ.
                      Works within Road Reserve/Reinstatement
               21.    Safe pedestrian access on all streets in the vicinity of the development must be maintained
                      at all times. Should footpath/road closures be necessary to carry out construction works,
                      Council’s Engineering Officer must be notified prior to the proposed closure and all
                      requirements complied with.
               22.    All frontage works must match neatly with existing road and verge/footpath features.
                      Additional works beyond the frontage may be required to provide an acceptable transition to
                      existing road and verge/footpath profiles.
               23.    Any electrical conduits or other services proposed to be installed within existing and
                      proposed road reserves under existing sealed carriageways, concrete pathways,
                      concrete/sealed driveways or significant vegetation must be installed by boring. Trenching is
                      not permitted, unless specifically approved by Council.
                      Site Access and Driveways
               24.    Driveway crossovers must be constructed in accordance with the approved plans and in in
                      compliance with IPWEA standard drawing RS- 051 and must have levels and grades match
                      the levels and the grades of any existing or proposed concrete pathway without posing trip
                      hazard.
               25.    The following must be complied with during the construction of the required
                      crossover/driveway:
                      a.      The driveway width must not exceed 7.23m at the front boundary line.
                      b.      The driveway surfacing must consist of either an approved hot mixed asphaltic
                              concrete or patterned/plain concrete.
                      c.      Underground service conduits for water supply, electricity and any other services must
                              be provided as part of the access driveway
                      d.      Where there is an existing pedestrian path, a matching crossfall must be provided for
                              the driveway on the alignment of the path, for the full width of the path
                      e.      Have a minimum clearance of 0.5m from any Unitywater/Telstra and be located a
                              minimum of 1m clear of existing power poles, streetlights or other signage. The
                              developer is responsible for any necessary relocation of existing services to provide
                              this clearance and must contact the relevant service authorities and comply with their
                              requirements in relation to these works.
               26.    Any existing kerb & channel and concrete footpath sections requiring removal due to the new
                      works must be saw-cut and removed to allow for a smooth and neat finish with the new
                      works.


                                                                                                      Page 7 of 13
Document Set ID: 24010585
Version: 4, Version Date: 08/08/2025

Used in these records

About this file

File size
181 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval - MCU18 0008 01 & OPW18 0013 01 (As Published).pdf · 181 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.