Minor Change Existing Approval - MCU18 0008 01 & OPW18 0013 01 (As Published) · MCU18/0008.01
18. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
who is independent of the Developer and Principal Contractor, and they must certify that all
works conform to the Operational Works permit. Where municipal works are involved, such
confirmation must be submitted for the respective hold points prior to any site inspection by
Council Officers.
19. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans/documents and conditions detailed in this Decision Notice
b. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines
c. The latest version of the Healthy Waterways document “Water Sensitive Urban Design
Technical Design Guidelines for South East Queensland” for all water quality devices
to be constructed on site
20. Pavement design for privately owned works must be undertaken in accordance with the
relevant standards. Structural integrity of the driveway and car park areas will remain the
responsibility of the property owner/developer and must be certified by an RPEQ.
Works within Road Reserve/Reinstatement
21. Safe pedestrian access on all streets in the vicinity of the development must be maintained
at all times. Should footpath/road closures be necessary to carry out construction works,
Council’s Engineering Officer must be notified prior to the proposed closure and all
requirements complied with.
22. All frontage works must match neatly with existing road and verge/footpath features.
Additional works beyond the frontage may be required to provide an acceptable transition to
existing road and verge/footpath profiles.
23. Any electrical conduits or other services proposed to be installed within existing and
proposed road reserves under existing sealed carriageways, concrete pathways,
concrete/sealed driveways or significant vegetation must be installed by boring. Trenching is
not permitted, unless specifically approved by Council.
Site Access and Driveways
24. Driveway crossovers must be constructed in accordance with the approved plans and in in
compliance with IPWEA standard drawing RS- 051 and must have levels and grades match
the levels and the grades of any existing or proposed concrete pathway without posing trip
hazard.
25. The following must be complied with during the construction of the required
crossover/driveway:
a. The driveway width must not exceed 7.23m at the front boundary line.
b. The driveway surfacing must consist of either an approved hot mixed asphaltic
concrete or patterned/plain concrete.
c. Underground service conduits for water supply, electricity and any other services must
be provided as part of the access driveway
d. Where there is an existing pedestrian path, a matching crossfall must be provided for
the driveway on the alignment of the path, for the full width of the path
e. Have a minimum clearance of 0.5m from any Unitywater/Telstra and be located a
minimum of 1m clear of existing power poles, streetlights or other signage. The
developer is responsible for any necessary relocation of existing services to provide
this clearance and must contact the relevant service authorities and comply with their
requirements in relation to these works.
26. Any existing kerb & channel and concrete footpath sections requiring removal due to the new
works must be saw-cut and removed to allow for a smooth and neat finish with the new
works.
Page 7 of 13
Document Set ID: 24010585
Version: 4, Version Date: 08/08/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - MCU18 0008 01 & OPW18 0013 01 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 181 KB (small file)
- File type
No other editions are linked here.