SUPERSEDED - Council Meeting Decision - Other Change - MCU18 0102 02 [As Published] · MCU18/0102.02
Stormwater Drainage
52. The site must be provided with a stormwater drainage system connecting to a lawful
point f discharge. The works must be undertaken in accordance with an Operational
Works approval and must include in particular:
a. the works shown on drawing number 17699-SK101 Revision A prepared by TOD
Engineers and Project Managers dated 17 August 2018, with the inclusion of the
following:
i. The storage tank must have sufficient capacity to cater for the runoff from
the driveway in a 5 minute 1%AEP rain event as a minimum.
ii. The basement structures (walls, floors and surfacing) must be constructed
of materials suitable for the potential inundation and all service connections
must be located a minimum of 300mm above the potential inundation level.
Acid Sulfate Soils
53. All works must be carried out in accordance with an Acid Sulfate Soil and Groundwater
Management Plan for the development prepared by a qualified person* and referenced
in a Development Permit for Operational Works. The Acid Sulfate Soil and Groundwater
Management Plan must specifically address how lowering of the groundwater level as a
result of the works will be avoided.
*(Refer to Advisory Note)
54. All waters, including stormwater runoff, groundwater seepage and leachate from acid
sulfate soils must achieve the following quality prior to release from the site:
a. a pH range of 6.5-8.5 pH units
b. 50mg/L maximum total suspended solids concentration
c. 0.3mg/L maximum total iron concentration
d. 0.2mg/L maximum total aluminium concentration
e. no visible plume at either the point of release from the site or within a waterway
55. The basement must be designed and constructed as a water excluding structure in
accordance with Australian Standard AS3735 "Concrete Structures for Retaining
Liquids" to ensure groundwater does not enter the basement after construction is
completed.
56. All treated material must undergo verification testing at the rate of one sample per
250m3 throughout the duration of the excavation phase of the development. The
verification testing must be undertaken by a qualified person* using the SPOCAS or
Chromium Reducible Sulphur testing suite, and the results must be submitted to
Council for appraisal.
Electricity and Telecommunication Services
57. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
58. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and all
applicable legislation at the time of construction.
Page 10 of 15
Document Set ID: 22778276
Version: 6, Version Date: 24/01/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Council Meeting Decision - Other Change - MCU18 0102 02 [As Published].pdfRelated documentApplication case desk ↗
DN - Other Change - MCU18 0102 02 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 210 KB (small file)
- File type
No other editions are linked here.