Council archive · source document
08/0215 - Hydraulic drawings for stormwater, erosion & sediment control [As Published] · 142008.215
Provide temporary
swoles and cut off
droins os construction
progresses so as to
ensure the runoff is
Gaotentile fabric,
Bidum U34 or simior.
SEDIMENT. TRAP
SEDIMENT AND EROSION CONTROL MANAGEMENT PLAN:
« caective:
‘To minimiea aroaion on ata and eneure sedienerd lp not washed dowm to the receiving waterways dus to cormtrucson
om
© UEGLATION:
[Envranenent Prossction Act 1904
Enwroreertal Preancton Water Policy 1957
‘The Wnegraind Phanring Aca 1997
+ teenamn,
Caer tnt se rit
Seperate tate arcana sree eae
wrhe beaten of drat pate auch 60 gorten are trench, 04 of mara, catch draina ane petmeter bank. Al cf
‘tase maaqures shall arms fu runciT ls dractad w the vecimentaden benin Outing conan.
he wacta are! wend dearn of maiartais and goods in parlcer concrete end camer shal be operated, oot ry
aed iogosed of
‘ipatatianon ed maintenance cf fhe sedirverd contr lences 68 arvund the perrvoter as shan in pan,
‘oor of fercam, mincoage od belne 09 well og Ihe sedrruniaion Devin efiar mach rail ewart
Sconiet fhe ermal pet ard he minkrézatin of eedirant ranetar ip he street in partccter cont of concrem
0d eortenordng vetictan
‘rr nuprrvina cthar maerbere of ell ord ned by exeroe
‘*enaura enough Baar cofiecton daviowe ara provided forthe colacton of daly Ber much au carm, Dott, pare,
mreesires to ere the runcit in rected te secimantaion bain t a Snae,
+ xeTON
te case of major rie events a Selowing afin plan shad be kilwad and reeporaibty lockordafer by th
CONTRACTOR:
SDONT WAIT UNIT, IT 1S TOO LATE
bbe on of during tha rekiel period and mond the crain pute. Recirect where required,
“check the fences afer every ruined and repiece th fences whare requted, Chack and replace all bertert,
F42 Fobric to ASI30
Geotextite fabric
Pests of steal pickets
driven 6O0mm inte ground
1QOmin verticol overtop of fobsic
Undisturbed oreo
Fon érection Da soe aceevon
=> : ——
oo! [00- So0} —
‘Ue oS
one
°
oo Of
0° 0 Po
oP o So
leo of
fo»
ow dieeion | Shaye
me at foro’ ine ye Frection
\ [300-600mm dio) Flom Srect
“ - Flow direction
Row diction \ 7 2
Crushed of gronnuier moterio!,
Groding to Toble 4 of OT
Geolextie Fabric
ond Fa? ~
Specificotian MRS1 1.03
50m _mox
wv
‘Sedimentation
rep
8
Segimentztion
rap
_*
“.
WAL Ys
J fe
= : ~ ~
“ a s A 2 a 3 ¢ ~|?
“A » St z Prior tothe gommencment of any construction activites the folowing measures >
* S shall be Irgrporated: a “ A o|=
As a ¢ é >
a © Provide education of site personnel \ q
* Setup action plans as a procaution in case of disturbances occuring
especially after an unexpected strong rainfall event Prodde temporony |
«Provide regular inspection and maintenance of ail structures including the sediment tence NS
temporary structures. parenater long aS
eter daiok
Boy Temporary Pure out sumo
AN .
“ A
s
&
s
3} v 1 5 .
say 2
eo lai 118 / > >
> 125° 7122 KERB 8 120 118. :
ST 710 1.08 GUTT 1.06 1.04
Fix to top of atake with
shodecloth fastener or
Ue to steet picket
S0xS0 HW stoke or steel
picket 1200min tong
Concrete mosonry
blocks (150 series)
GENERAL NOTES
These Drasings are diagrammatic only ond sholl be read in conjunetion sith ol refevoot
Architectural ond other consulents srowings ond specifications ond other written
STORMWATER DRAINAGE
Underground pipewore snoll be 100 dia PVC class SW min grode 1:100 U.N.0,
Oo=npipes shal be 100 Oio PVC clors SW.
light duty
Covers '& Framer a be ‘Fasten’ or equal approved,
GRATINGS
Gratings tor storm water to be "foston, Getic” or opproved eauol.
Dut monutocturers recommendations for toading condition
"grata ta be Uonaverve. bor.
Poor waste grates in public oress ta ba chrome plated beoss
in’ private oreos mey be PYC.
Notes tediment controt:
1, General
Terrearory drainage control Flow should ba charted sraund the work site, where
AM Grainy 10 ba stalled ond
it Sediment Trop
ba diverted oway trom entry/exit
idered at of times, incorpote tratfic control devices to the satisfaction of the superintendent.
7, Sotety imavea must be considered ot of times, incorporate traffic contro! devices la the sotisfoction of tha Superintendent,
LEGEND
Existing storm woter Een
Storm Wolar Drainage soa
dai Drain t
Down Fipe ee
en Eccentric enlarger WO
Floor Woste su
sully Sq
a GP1 Guy Pit Talo
Trench grote tronsversa bor
Franch grote longitudinal bar
i v/9 Underground
Sediment Fence u/s Under slob
Via.0, Unless noted otherwise
Sediment borrier
dl Description Date.
Inlet with grate
lsu Rates Date
Fox Dereuprent oosorel
fa Constructed
Sediment
metari
2mm wire netting
x
19 ll sites
concrete masonry blocks
{150 series)
: Reinhold Koenning mitsust RPEG No 7023
PO Box 1176
Buddino OLO 4875
amail: [email protected]
wew.conhyd.com
PH; 54a6 8648
Fx: 5444 8224
CUENT :
K. & V. BRACKEN
ARCHITECT =
ANDREW MCKELLAR DESIGN
PROVECT; ~PROPOSED DUPLEX
181 GYMPIE TERRACE
NOOSAVILLE
DRAWING TITLE:
Finered woter
Field intet with grote
SEDIMENT & EROSION
CONTROL PLAN
OPERATIONAL WORKS
LZ?
mp
te [13- 9-07
wnvna] 3 oF 3
[RPD:~ Lot 1 on RP69B68
1763-0-2} j
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0215 - Hydraulic drawings for stormwater, erosion & sediment control [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.