                       AGENDA


         General Committee
              Meeting


                 Monday, 13 May 2019

                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Jess Glasgow, Ingrid Jackson,
             Joe Jurisevic, Frank Pardon, Brian Stockwell, Tony Wellington



                    “Noosa Shire – different by nature”
Log in to download the original file

2019-05-13 General Committee Meeting Agenda(PDF, 4MB).pdf · 3.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 31 sections

Section 2

GENERAL COMMITTEE MEETING AGENDA                                                13 MAY 2019


TABLE OF CONTENTS

ITEM                                                                                  PAGE


ATTENDANCE & APOLOGIES                                                                     -

PRESENTATIONS                                                                              -

ITEMS REFERRED FROM PLANNING & ENVIRONMENT COMMITTEE                                      2

1      PROPOSED LOCAL LAW AMENDMENTS - ADVERTISING DEVICES
       (Planning & Environment Committee Agenda, 7 May 2019, Item 2, Page 19)
       Reason for referral – Significance of the issue

2      NOOSA SUSTAINABILITY INSTITUTE - STAGE 1 REPORT
       (Planning & Environment Committee Agenda, 7 May 2019, Item 3, Page 35)
       Reason for referral – Significance of the issue

ITEMS REFERRED FROM SERVICES & ORGANISATION COMMITTEE                                      -

REPORTS DIRECT TO GENERAL COMMITTEE                                                       3

3      MCU18 0165 REQUEST FOR NEGOTIATED DECISION NOTICE FOR MULTIPLE
       HOUSING - TYPE 4 CONVENTIONAL (17 DWELLING UNITS) AT 25 KAURI
       STREET COOROY                                                                       3

4      PLANNING & ENVIRONMENT COURT APPEAL NO 4339 OF 2018 -
       DEVELOPMENT APPROVAL FOR OPERATIONAL WORKS (SIGNAGE)
       OPW18/163 AT 140-142 EUMUNDI NOOSA ROAD, NOOSAVILLE                                 9

5      FINANCIAL PERFORMANCE REPORT - APRIL 2019                                         17

6      QUEENSLAND TREASURY CORPORATION REVIEW OF COUNCIL LIQUIDITY                       27

CLOSED SESSION                                                                       -




                                                                                Page 2 of 32

Section 3

GENERAL COMMITTEE MEETING AGENDA                                                                    13 MAY 2019


REPORTS DIRECT TO GENERAL COMMITTEE


3                        MCU18 0165 REQUEST FOR NEGOTIATED DECISION NOTICE FOR MULTIPLE
                         HOUSING - TYPE 4 CONVENTIONAL (17 DWELLING UNITS) AT 25 KAURI STREET
                         COOROY
DOCUMENT INFORM AT ION




Author                           Coordinator Planning, Patrick Murphy
                                 Environment and Sustainable Development

Index                            Application/ ECM / MCU18/0165

Attachments                      1.   Plan of Road Widening and Associated Works



         APPLICATION DETAILS

         Applicant                            Pace Planning Pty Ltd

         Development Approval                 Material Change of Use - Multiple Housing - Type 4 Conventional

         Representations Received On          23 March 2019

         Number of Submissions                Three (3) submissions were made to the original application



         PROPERTY DETAILS

         Property Address                     25 Kauri Street, Cooroy

         RP Description                       Lot 27 C 56016

         Land Area                            4741m²

         Existing Use of Land                 Vacant land



         STATUTORY DETAILS

         SEQRP Designation                    Urban Footprint

         Locality                             Cooroy and Lake Macdonald

         Zone                                 Attached Housing

         Overlays                             Nil

         Assessment Type                      Representations made to original approval




                                                                                                     Page 3 of 32

Section 4

GENERAL COMMITTEE MEETING AGENDA                                                   13 MAY 2019


RECOMMENDATION
That Council note the report by the Coordinator Planning to the General Committee Meeting
dated 13 May 2019 regarding representations made to Development Approval No. MCU18/0165
for Multiple Housing - Type 4 Conventional situated at 25 Kauri St Cooroy and:
A.    Agree to change conditions 21 and 29 as follows:
     21.   The full length of the Kauri Street and Olivine Street frontages of the development
           site must be upgraded by providing kerb & channel, bitumen road widening,
           stormwater structures and landscaping improvements to the footpath in accordance
           with an Operational Works approval. The works must include but are not limited to
           the following:
           21.1. In regard to the Kauri Street frontage, the new kerb and channel must be
                 aligned so that it is offset 8 metres from the existing kerb and channel on the
                 western side of Kauri Street measured from the nominal face of the kerb. The
                 new works must be extended to the north of the subject site and be generally in
                 accordance with drawing number 2018068 – Dwg 04 of 24 titled External Works
                 Layout Plan dated March 2019 prepared by 360 Civil Consulting and join
                 smoothly with the existing formation.
           21.2. In regard to the Olivine Street frontage the new kerb and channel must be
                 aligned at about 12m offset from and parallel to the property boundary and
                 must extend for the full frontage of the subject site. The works shall include
                 suitable tapers extending beyond the frontage of the subject site to smoothly
                 join to the existing pavement.
           21.3. The works (Kauri Street, Olivine Street and the intersection) must include
                 suitable drainage structures and stormwater collection to ensure that runoff
                 from the road formation is collected, controlled and directed to ensure that the
                 roadway is safely trafficable and must be in compliance with the relevant
                 sections of the Queensland Urban Drainage Manual (QUDM).
           21.4. As part of the application for operational works, the developer’s civil
                 engineering consultant shall investigate and report on the possible deficiencies
                 in the existing stormwater system, to the western end of Agate Street and
                 including inspection by closed circuit television (CCTV) of the existing
                 stormwater system. The developer is required to rectify any deficient
                 stormwater pipes or structures extending from the development frontage down
                 to and including the manhole downstream of the 600x1200 box culvert which
                 crosses Kauri Street.
           21.5. The design and construction of all works shall be carried out in accordance with
                 Council’s Planning Scheme Policy PSP05 – Engineering Design Standards –
                 Roads, Drainage and Earthworks and the applicable engineering standards
                 current at the time of construction. The above condition is imposed pursuant to
                 s145 of the Planning Act 2016 being non-trunk infrastructure.
     29.   A CCTV inspection must be carried out by a Council approved CCTV contractor upon
           satisfactory completion of construction works that are to become a Council asset. The
           developer will be responsible for the full cost of CCTV inspection, including any
           additional inspection necessary following defect identification and rectification.
B.    Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.




                                                                                   Page 4 of 32

Section 5

GENERAL COMMITTEE MEETING AGENDA                                                      13 MAY 2019


REPORT

1.    BACKGROUND
The application was originally considered at the General Committee Meeting on 18 February
2019 where it was resolved to approve the application for 17 multiple dwelling units. The
applicant has subsequently suspended the appeal period and made representations on 25 March
2019 to the development approval conditions. The representations are detailed below and relate
to the extent of frontage works required and stormwater CCTV inspection. At the time the
application was publicly notified, three (3) properly made submissions were received. The
submitters were primarily concerned with the impact of the development on the environment,
traffic and amenity of the area.

2.    ASSESSMENT
An assessment in relation to each of the submitted representations is provided below:
Condition 21.1
21.   The full length of the Kauri Street and Olivine Street frontages of the development site must
      be upgraded by providing kerb & channel, bitumen road widening, stormwater structures
      and landscaping improvements to the footpath in accordance with an Operational Works
      approval. The works must include but are not limited to the following:
      21.1. In regard to the Kauri Street frontage, the new kerb and channel must be
            aligned so that it is offset 8 metres from the existing kerb and channel on the
            western side of Kauri Street measured from the nominal face of the kerb. The
            new kerb and channel must be extended to the north, approximately, to the
            prolongation of the common boundary of No 21 and 19A Kauri Street and join
            smoothly with the existing kerb and channel.
Applicant’s representation
The applicant submits that the conditioned upgrades to Kauri St (road widening, kerb and
channel, stormwater and verge) in front of 21 Kauri St should not be a requirement of the 25
Kauri St development due to the works being located outside of the development site’s frontage.
The development will upgrade the Kauri St and Olivine St frontages on the development side for
the length of 25 Kauri St however the development should not be liable for upgrade works in front
of other properties. The proposed design along 25 Kauri St would be able to adequately achieve
a transition from the new kerb and channel back to the existing un-kerbed / swale drain
arrangement in front of 21 Kauri St.
The upgrade of the road in front of 21 Kauri St should remain the responsibility of any future
development at 21 Kauri St. The length of road upgrade that would be required in front of 21
Kauri St is approximately 50m which is a considerable cost impost if placed on the 25 Kauri St
development. The applicant submits that this is an unreasonable requirement to be placed on the
25 Kauri St development and hence are requesting that condition 21.1 be amended to read:
      21.1 In regard to the Kauri Street frontage, the new kerb and channel must be aligned so
           that it is offset 8 metres from the existing kerb and channel on the western side of
           Kauri Street measured from the nominal face of the kerb. The new kerb and channel
           must extend to the northern property boundary of 25 Kauri St and transition back to
           the existing road cross section profile.
Assessment
The original condition required road widening works in Kauri Street to extend north beyond the
frontage of the subject site to connect to existing kerb and channelling. A headwall and culvert
inlet are located within a swale drain to the north of the subject site within close proximity of the
existing road verge. The extent of road widening required was due to road safety concerns
associated with the location of this infrastructure. The applicant through the negotiated decision
process has now provided engineering drawings which provide for works to the headwall and
                                                                                       Page 5 of 32

Section 6

GENERAL COMMITTEE MEETING AGENDA                                                       13 MAY 2019


culvert and for road widening to extend slightly north of this area. The following image details the
extent of road widening works in Kauri Street north of the subject site (the plan is also included in
Attachment 1).




                         Figure 1: New roadworks proposed in Kauri Street
The amended drawings have been reviewed and are considered to provide a satisfactory and
safe outcome and it is not reasonable for the applicant to provide kerb and channelling for the full
extent of the adjoining property. It is recommended that condition 21 be amended to read:
21.   The full length of the Kauri Street and Olivine Street frontages of the development site must
      be upgraded by providing kerb & channel, bitumen road widening, stormwater structures
      and landscaping improvements to the footpath in accordance with an Operational Works
      approval. The works must include but are not limited to the following:
      21.1. In regard to the Kauri Street frontage, the new kerb and channel must be
            aligned so that it is offset 8 metres from the existing kerb and channel on the
            western side of Kauri Street measured from the nominal face of the kerb. The
            new works must be extended to the north of the subject site and be generally in
            accordance with drawing number 2018068 – Dwg 04 of 24 titled External Works
            Layout Plan dated March 2019 prepared by 360 Civil Consulting and join
            smoothly with the existing formation
Condition 29
29.   A CCTV inspection must be carried out by a Council approved CCTV contractor upon
      satisfactory completion of construction works. The developer will be responsible for the full
      cost of CCTV inspection, including any additional inspection necessary following defect
      identification and rectification.


                                                                                       Page 6 of 32

Section 7

GENERAL COMMITTEE MEETING AGENDA                                                          13 MAY 2019


Applicant’s representation
Council have previously only required CCTV reports on infrastructure that is to become a Council
asset. The applicant submits that the wording of the above condition could imply that
infrastructure located within the development site requires CCTV inspections. It is requested that
the condition be amended to read:
29.     A CCTV inspection must be carried out by a Council approved CCTV contractor upon
        satisfactory completion of construction works that are to become a Council asset. The
        developer will be responsible for the full cost of CCTV inspection, including any additional
        inspection necessary following defect identification and rectification.
Assessment
It is agreed that the re-wording of the condition as proposed by the applicant will provide an
outcome consistent with the intent of the condition for infrastructure to be inspected and rectified
of any defects prior to becoming a council asset. It is recommended that condition 29 be
amended to read:
29.     A CCTV inspection must be carried out by a Council approved CCTV contractor upon
        satisfactory completion of construction works that are to become a Council asset. The
        developer will be responsible for the full cost of CCTV inspection, including any additional
        inspection necessary following defect identification and rectification.

3.      CONCLUSION & REASONS FOR DECISION
It is concluded that conditions 21 and 29 can be amended. The amended conditions address
officer’s concerns with safety associated with road widening works and provide assurance that
infrastructure which is to become a council asset will not contain defects.


Departments/Sections Consulted:
      Chief Executive Officer       Community Services                      Corporate Services
      Executive Officer             Community Development                   Financial Services
      Executive Support             Community Facilities                    ICT
                                    Libraries & Galleries                   Procurement & Fleet
                                    Local Laws                              Property
                                    Waste & Environmental Health            Revenue Services

      Executive Services        x   Environment & Sustainable Development   Infrastructure Services
      Community Engagement          Building & Plumbing Services            Asset Management
      Customer Service          x   Development Assessment                  Buildings and Facilities
      Governance                    Economic Development                    Civil Operations
      People and Culture            Environmental Services                  Disaster Management
                                    Strategic Land Use Planning             Infrastructure Planning,
                                                                            Design and Delivery




                                                                                          Page 7 of 32

Section 8

GENERAL COMMITTEE MEETING AGENDA   13 MAY 2019




                                   Page 8 of 32

ATTACHMENT 1
                       DB nt               emave                                                                                                               LEGEND
                               PRI > | kaua st
    \                          BP            coca,                                                                     §                                                      PROPOSED DRIVEWAY
                        aut     &       Wika                                                                           f                                            wie nls oe ‘TSem THICK N32 (SL7Z) CONCRETE
SO        i     “tT    4  |  |  No      sav ature   CML                                                                |                                                i COnOnETE SLEEP OR SOLAR IY OTHERS)
            —                       NL   ceneb EXSTWO CULVERT. OR                                                     |                                            SerETTET On Sere tee
                          |            py SMOOTHLY To EXISTING                                                                                   :                 Tae Te      PROPOR MALE
                               |       }      tht] |                         ——-—.                                    |                      ween                  ———1—— _ baste stormwater
                     Li.   |           ‘an teen                 =        =   L    |      :                                                  “4  \                  —— 1» ——    baste warernat
                           |           '     re   Pht.    fs     eet                                                                            er                 1+ ——_ E0STING SEWER MAIN
                     Uy       |                HH                   —t                                       td                          a                         —
                     il |  |  |                 i           |   U7     us                                                                  a      \                to    Te== EXISTING TELSTRA
          sawcutensmnc |   1                    ty     pscift               |  =        U4                                          {/       %     \y     ;        ——-—_enstns contours
         INSIDE EXISTING EDGE                by      1                                                                                                  dr         TE este raoream
         OF BITUMEN        \    ill                                     |     ]          |                                      i/              fy    /
             +       Ih                       (4                oe                                          |                                      /                         ec mcsone
 sie tame                                 \   | emma «|e                     Se                                                w/b
                            |                   1 \  harrier.                      I    a                                                   Yo / /
                     4m    5              }     a"                  Pgsctia hse Mg aee IF            a                        ‘             f/
                                 isa         BZ LILLE ocr            al   nage     fancies          [eRe  a                         LG     “    a mance
                                                       a             CR OOR                                          Y               hh             reves
            DRIVEWAY cRossover || | i            |    us i       ele V x: Me “            S    “Sk Ne        EAN    y            be Pps     “Tse, waa  care
            ASPER'STOOWG |       |  M           ie               Ae    Pee Y             J         SNE             1            lp     #          FOOTPATH AS PER STD
            AS-0492 RS-050 $i      Wi           |         eaten        & stay   Ly      /  WAT     ~        NMA               i       /           OWG RS-065,
                           S\    MN We              —             oh     Sf? KR                   i >—~      ee Nt           Y    /              ¥
             \           (a:                     \_)  uo —           why           .     SG         S       XR /                             fr
                           a!                                     Mig Lee  ro?   “;     Me      ed   oF       CNS DS        GY /
                             |  }  WV          \ heel             eee   o XA              ; XY.  J     {/        £: oS    : J            /               BOUNDARY x       Ne
                                   1                              SMe      20     fui      S47    /          EY,”                                         new
                          |—— 8.00 } rhb,         |        Lea      heK     NYY          BE                  / Lyf >                                  EXISTING      “Ss     r
                          (7    i   hi                  ue          TEANS        us KAS                       4 7 2      hg                           BOUNDARY         tN    %
                          |  \  | | V1            O                   EO              ONY’      ”          “Ql /              ~praveway crossover              OS              \         rg
                          |   |  } } 1 |           +7 ae od Nek                          Fee               y  6 yy’ J           5069 BS-O5D                              \           e y    fj .
                          |        hk              |  |            EEE     ERY            lf           Oy       |  7                                                     3                  “
             PROPOSED M1 KERB . (I   i             7          |      =,   -_     \    LY            fi  4 XK                rd                                           =               Va
                    1 KERB AND |} — J              aN   ecccceent     Pr)   Ul                     Ye,         J                                      HATCHING DENOTES   -              :
             meee          |  \      Y              Hy            l\     ae            \       bb li J 6        ps stl       siti                                OE       \          e*
                           |   |                    Le                UV           Y\         YA @~                   EE                                                WA
                           |          i            oh:    __ 4        asta}   //         \  G gis              |    e     °                                                \     VY                    A
                               |     1             a                                       i    VY /                                                                           yy’                   Ms
                            \                     liR-eY                                 ff                 vv                                                             Yo,
                            \   |   \                  LL             LES           hy “Me we           ZL if                                                BOUNDARY TRUNCATION               My
                            \   |      (|                 \           KES y i           y               2                               i                    SCALE 120                      Mh    y   4
            -               }   |      if      PROPOSED BOUNDARY         NS Se       fe Jy           ra                               aR   =                                              Ah    Sy lA
                             )oo4      i      TRUNCATION - REFER DETAIL Ai x       g     ee         2                                 2    z                                            ye    Y    the
                             ;   |   i Wy             |                     aXe      Pe od                                            BR   =
                             |   |   EA    ate                       a     ty                    J                                    ae
                 STEAM AS Pr SIM                          ao        f ey   4 4 of        waromee                        EXISTING PAVEMENT Om | 300m | 00m
                             1                                          4     G      x                                                aE   a
                2.0m WIDE CONCRETE n                                   ,   Ly   of”    Sex,                                           ZE   | _ PROPOSED PAVENENT
                                 |    i                                j          /                                                   aE   &
                        |    \   |                    l/           fe ha a,              Yi  91 RS-050                                   IN  ae               NEW SEAL BASPHALT LAYER
                              )   \  |                        y fh fe                  x                              Se         eee DOW                          PAVEMENT TYPE 22
                                  ,  Y                            Y    ro,         i                                  eso       ecn er eerere ns           &
                              \   |    \                    L/h 7       J          F                                  SOS       aes YY,                           NEW SUBBASE COURSE
                             hee iN                        a   V4                LD                                                                                PAVEMENT TYPE23
         LEMME SAG GULLY PIT (2 4m —   VN                 ‘ 4p r/               Sf
                                ——-_    QQ,         Asp Fo           cenwwit omc ony oir                             EXISTING PAVEMENT CUTBACK DETAIL                        bt.             wee
                               \         Wem                   /      RL OTE                                         PUREE                                                  Se
                                           So            a,            —        .      .                                                                                               TAEISON
Sa   oe           en [ae pon arenove                                                                      nov wnsnocs rom [Proposed Unit Development [>=                =] External Works Layout Pan
                                                                                                                               posed Unit Development
 SSeS pele                              L$                            @         5                       qt [= [aseewas cow                                       |
 Ciesteomentramentenseligvest: Sl                                                                             ante Location
 ————                      eS                                                                See                       [eared EE

                                                                                                                       Page 8 of 32

Section 9

GENERAL COMMITTEE MEETING AGENDA                                                                    13 MAY 2019



4                        PLANNING & ENVIRONMENT COURT APPEAL NO 4339 OF 2018 - DEVELOPMENT
                         APPROVAL FOR OPERATIONAL WORKS (SIGNAGE) OPW18/163 AT 140-142
                         EUMUNDI NOOSA ROAD, NOOSAVILLE
DOCUMENT INFORM AT ION




Author                               Manager Development Assessment, Kerri Coyle
                                     Environment & Sustainable Development Department

Index                                ECM/ Application / OPW18/163 / Case/ Denmac Nominees Pty Ltd TTE

Attachments                          1.    Negotiated Decision Notice
                                     2.    Amended Conditions



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Manager Development Assessment to the General
Committee Meeting dated 13 May 2019 regarding Planning & Environment Court Appeal No.
4339 of 2018 and agree to settle the appeal generally in accordance with the amended
conditions set out in Attachment 2.


REPORT
A development application for signage for the Shell service station at 140-142 Eumundi Noosa
Road was approved by delegation on 4 September 2018 subject to conditions. The application
sought approval for the following signs:
                       1 x illuminated 5m high Pylon sign
                       4 x non-illuminated spreader signs measuring 1.6m x 1m each
                       1 x illuminated Shell logo measuring 1.2 x 1.2m
                       1 x Night Owl fascia sign – 4m x 0.6m
                       Illumination of the canopy with corporate colours
The approval included a number of conditions which sought to limit the extent of signage and the
number of illuminated signs. The applicant suspended the appeal period and made
representations on 11 October 2018 to the development approval conditions, 7, 10, 11 and 14.
The representations to conditions 7, 10, and 11 were not agreed to, with the representations to
condition 14 to change the illumination times of the approved signage agreed to reflect the
businesses trading hours. Attachment 1 is a copy of the Negotiated Decision Notice.
The applicant subsequently lodged an appeal against the decision seeking to delete conditions 7,
10 and 11 of the Negotiated Decision Notice. Conditions 7, 10 and 11 require the following:
7.                       The 4 spreader ‘Quality Fuels’ signs (non-illuminated) are not approved (as annotated on
                         the approved plans) and must be removed within 6 weeks from the date of this approval.
10.                      No illumination of the stripes is allowed on the canopy face.
11.                      No illumination of the ‘Shell’ fascia and Night Owl sign is allowed.



                                                                                                    Page 9 of 32

Section 10

GENERAL COMMITTEE MEETING AGENDA                                                          13 MAY 2019


In accordance with the Planning & Environment Court’s directions, mediation was attended by
Council officers and the appellant with the court registrar on 4 April 2019. At the mediation an
agreement was generally reached over the disputed signage as set out below (with some minor
details refined thereafter):
Condition 7 – Spreader Signs
      The 4 spreader quality fuel signs will be blanked out and will be white being the same
        colour as the upright posts that they are attached to so as not to stand out. The appellant
        requested that the spreader signs be permitted to remain as removing the spreader signs
        would leave penetrations in the canopy supports exposed.
Condition 10 – Illumination of Canopy stripes
      Council officers agreed to the deletion of condition 10 regarding the illumination of the
        stripes on the canopy face. The current Advertising Devices Code only regulates
        advertising devices and does not regulate branding colours or illuminated stripes on
        buildings. Therefore there is no basis for this condition to be maintained.
Condition 11 – Illumination of Signs
      Council officers agreed to allow for the illumination of one additional sign being either the
        Shell facia or the Night Owl sign. The Advertising Devices Code permits one illuminated
        sign per tenancy and therefore a total of 2 illuminated signs are permitted on site, with the
        site having 2 tenancies.
It is therefore recommended that Council resolve to settle the appeal on this basis and as set out
in the amended conditions in Attachment 2.
Finance & Risk
Council’s solicitor for the matter advises in respect to the proposed settlement that “while this is
only a relatively small matter, it appears to be a satisfactory compromise and a good result for
the Council”.

Consultation
External Consultation - Community & Stakeholder
Wakefield Sykes - Solicitor

Internal Consultation
Nil

Departments/Sections Consulted:

      Chief Executive Officer       Community Services                      Corporate Services
      Executive Officer             Community Development                   Financial Services
      Executive Support             Community Facilities                    ICT
                                    Libraries & Galleries                   Procurement & Fleet
                                    Local Laws                              Property
                                    Waste & Environmental Health            Revenue Services

      Executive Services        x   Environment & Sustainable Development   Infrastructure Services
      Community Engagement          Building & Plumbing Services            Asset Management
      Customer Service          x   Development Assessment                  Buildings and Facilities
      Governance                    Economic Development                    Civil Operations
      People and Culture            Environmental Services                  Disaster Management
                                    Strategic Land Use Planning             Infrastructure Planning,
                                                                            Design and Delivery




                                                                                         Page 10 of 32

Section 11

GENERAL COMMITTEE MEETING AGENDA     13 MAY 2019


                                   Attachment 1




                                    Page 11 of 32

GENERAL COMMITTEE MEETING AGENDA                                                                      13 MAY 2019

                                                                                                   Attachment 1

             jefe} NOOSA COUNCIL
                                                       Officer:      Lisa Pienaar
                                                       Direct Telephone: 5329 6514
                                                       Our Reference: OPW18/0163 : JELDER
                                                       Your Reference: .
             7 November 2018

             Denmac Nominees Pty Ltd TTE
             C/- Urbis Pty Ltd
             Level 7, 123 Albert Street
             BRISBANE QLD 4000
             [email protected]

             Dear Sir,
                                          Negotiated Decision Notice
                                                  Planning Act 2016
             | refer to your application and the representations you made in respect to the decision |
             1 November 2018, Council decided your representations. This negotiated decision notic:
             the decision notice approved on 3 September 2018.
             Details of the negotiated decision are as follows:
             1;   APPLICATION DETAILS

              Application No:            OPW18/0163
              Street address:            140-142 Eumundi Noosa Rd Noosaville Qld 4566

              Real property description: Lot 2 RP 173876 No related Land
              Planning Scheme:           The Noosa Plan (8 June 2018)
            2.     DECISION DETAILS
             Council on 3 September 2018, decided to issue the following type of approval:
             e     Development Permit for Operational Work - Signage
             In relation to representations, Council on 1 November 2018 decided to:
             A.   Agree to amend conditions 14.
             B.    Refuse to change Condition 7, 10 & 11 for the following reasons:
                 1.   Additional illumination from that already approved is considered excessive i
                      compatible with the visual amenity of the area (and major road network) and \
                      dominate the visual landscape as identified in the Advertising Devices Code
                      Plan.
                2.    Additional signs to those already approved will contribute to visual clutter
                      located on a major road) as identified in of the Advertising Devices Code in Nc
             3.    CURRENCY PERIOD OF APPROVAL
             The currency period for this development approval is 4 years starting the day that this de:
             approval takes effect.

              NOOSA COUNCIL
              ABN: ST 969214 121         PO Box 141              P. (07) 5329 6500 [email protected]'
                                         TEWANTIN QLD 4565       F. (07) 5329 6501 mw noosa.ald.gov qid.gov
                                                                                               Pa

                                                                                                     Page 11 of 32

Section 12

GENERAL COMMITTEE MEETING AGENDA   13 MAY 2019




                                   Page 12 of 32

GENERAL COMMITTEE MEETING AGENDA                                                                    13 MAY 2019

             4.   ASSESSMENT MANAGER CONDITIONS
             PLANNING
                  When Conditions must be Complied With
             1.   Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
                  the use commencing, and then compliance maintained at all times while the use continues.
                  Approved Plans
            2.    Development undertaken in accordance with this approval must generally comply with the
                  approved plans of development. The approved plans are listed in the following table unless
                  otherwise amended by these conditions.
                    Plan No.      Rev. | Plan/Document Name                               Date
                    11147-A800    A       Site Signage Plan, drawn Cadway Projects (as | 09/12/2016
                                          annotated by Council)
                    11147-A800    A       Site Elevations, drawn Cadway Projects (as | 09/12/2016
                                          annotated by Council)
                                  Sheet | Coles Express Noosaville QLD 5m                 26/07/2017
                                  1 of 1
                                  Rev 4
            3.    Development authorised by this approval must be undertaken generally in accordance with
                  the Approved Plans listed within this Decision Notice.
                  Nature and Extent of Approved Development
             4. _ This approval authorises the following signs as defined by the planning scheme and shown
                  on the Approved Plans:
                  a.    One freestanding, pylon sign identified as S1;
                  b.    Two fascia signs — Night Owl and Shell logo (S7).
             5. | The approved signs must not exceed the dimensions and sign areas as shown on the
                  Approved Plan (as annotated).
            6.    This approval authorises the following signs as defined by the planning scheme and shown
                  on the Approved Plans.
                  a.    The Pylon sign must maintain a setback at least 1.50 metres from the front boundary
                  b.  | amaximum height of 5 metres;
                  Cc:   a maximum sign face area as shown on the approved plans.
             7.   The 4 spreader ‘Quality Fuels’ signs (non-illuminated) are not approved (as annotated on the
                  approved plans) and must be removed within 6 weeks from the date of this approval.
             8. | The approved signs must be positioned wholly within the property boundaries of the subject
                  site, and must not be located within or across any easements.
            9.    The approved signs must not be used for the advertisement of goods and/or services not
                  sold or conducted on the site (ie. third party advertising).
                  Illumination
             10.  No illumination of the stripes is allowed on the canopy face.
             11.  No illumination of the ‘Shell’ fascia and Night Owl sign is allowed.
             12.  The approved illuminated pylon sign must not incorporate flashing lights nor involve
                  illumination by any means other than:
                  a. —_ an internal light source
                                                                                             Page 2 of 4

                                                                                                   Page 12 of 32

Section 13

GENERAL COMMITTEE MEETING AGENDA   13 MAY 2019




                                   Page 13 of 32

GENERAL COMMITTEE MEETING AGENDA                                                                      13 MAY 2019

                   b.   a down light, if externally lit.
             13.   Illumination resulting from direct, reflected or other incidental light emanating from the
                  approved signs must not exceed a luminance of 300 candelas per square metre.
             14.  Sign illumination must be switched off outside of approved services station and/or shop use
                  trading hours.
             15.  All conduits, wiring, switches or other electrical apparatus installed on an advertising device
                   must be concealed from general view.
                   Maintenance
             16.  The approved signs must be properly maintained by the owner of the property to ensure the
                  signs continue to comply with the Approved Plans and conditions of this Decision Notice.
             os    REFERRAL AGENCIES
             Not applicable.
             6.   ADVISORY NOTES
             Not applicable.
             in    PROPERTY NOTES
             Not applicable.
             8.   VARIATION APPROVAL DETAILS
             Not applicable.
            9.     FURTHER DEVELOPMENT PERMITS REQUIRED
             Not applicable.
             10.  SUBMISSIONS
             Not applicable.
             11.   RIGHTS OF APPEAL
             You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
             Planning Act 2016 is attached.
             During the appeal period, you as the applicant may suspend your appeal period and make written
             representations to Council about the conditions contained within the development approval. If
             Council agrees or agrees in part with the representations, a negotiated decision notice will be
             issued. Only one negotiated decision notice may be given.
             12.  OTHER DETAILS
             If you wish to obtain more information about the decision, electronic copies are available on line at
           [www.noosa.qid.gov.aujor at Council Offices.
             Yours faithfully,
             MN. aan
             Lisa Pienaar
             Development Planner

             Enc: Appeal Rights
            ce.    Unitywater

                                                                                               Page 3 of 4

                                                                                                    Page 13 of 32

Section 14

GENERAL COMMITTEE MEETING AGENDA   13 MAY 2019




                                   Page 14 of 32

x        ml       NOOSA                              Appeal Rights
      4      mM      COU            | C a6              PLANNING ACT 2016 & PLANNING REGULATION 2017

Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
Part 4 Appeal rights                                                               within the service period, give a copy of the notice of appeal to —
229 Appeals to tribunal or P&E Court                                                (a) the respondent for the appeal; and
(1) Schedule 1 of the Planning Act 2016 states —                                    (b), Sach'co-responident forthe appeal-and
                                         _                                          (c) foran appeal about a development application under schedule
    (@); Matters that may be:appealed to                                                1, table 1, item 1    — each principal submitter for the
         (i) either a tribunal or the P&E Court; or                                     development application; and
         (ii) only a tribunal; or                                                   (d) for and appeal about a change application under schedule 1,
         (iii) only the P&E Court; and                                                  table 1, item 2 — each principal submitter for the change
                                                                                        application; and
    (b) ‘The person-                                                                (e) each person who may elect to become a co-respondent for the
         (i) who may appeal a matter (the appellant); and                               appeal, other than an eligible submitter who is not a principal
         (ii) who is a respondent in an appeal of the matter; and                       submitter in'an‘appeel tinder: parapraph;(c) or (d);'and
         (iii) who is a co-respondent in an appeal of the matter; and               (f) for an appeal to the P&E Court — the chief executive; and
         (iv) who may elect to be a co-respondent in an appeal of the               (g) for an appeal to = aone, undee sone et = Bhy"cther
             matter,                                                                    person who the registrar considers appropriate.
(2) An appellant may start an appeal within the appeal period.                 (4) The service period is —
@) The apes! period is-                                                             it ee eee
    (a) for an appeal by a building advisory agency — 10 business                             ae          ‘                          r
         days after a decision notice for the decision is given to the              (b) otherwise—10 business days after the appeal is started.
         agency; or                                                            (5) A notice of appeal given to a person who may elect to be a co-
    (b) for an appeal against a deemed refusal — at any time after the              respondent must state’ the effect of subsection (6):
         deemed refusal happens; or                                            (6) A person elects to be a co-respondent by filing a notice of election,
    (c) for an appeal against a decision of the Minister, under chapter            ni ma      poms. within AU biisinessitiaysvanierthesmotos:of
         7, part 4, to register premises or to renew the registration of             PP!     9          Pp
         premises — 20 business days after a notice us published under         231 Other appeals
         section 269(3)(a) or (4); or                                          (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
    (d) for an appeal against an infrastructure charges notice — 20                the Supreme Court decides a decision or other matter under this
         business days after the infrastructure charges notice is given            Act is affected by jurisdictional error, the decision or matter is non-
         to the person; or                                                          appealable.
    (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
         application for which a decision notice has not been given —               matter to the extent it is affected by jurisdictional error.
         30 business days after the applicant gives the deemed                                                       c
                     :                             5                           (3) A person who, but for subsection (1) could have made an
         SpDIOVAL ngtioe to Ane esses eMent MANaGET.OF                              application under the Judicial Review Act 1991 in relation to the
    (f)  for any other appeal — 20 business days after a notice of the              decision or matter, may apply under part 4 of that Act for a
         decision for the matter, including an enforcement notice, is               statement of reasons in relation to the decision or matter.
         given to the person.                                                           .     :
                                                                               (4) In this section —
Note —                                                                              decision includes-
      ted Ree Court-Act tor, ine: courts /powsr.io extend: ie sppeat                (a) conduct engaged in for the purpose of making a decision; and
(4) Each respondent and co-respondent for an appeal may be heard                    (b) other conduct that relates to the making of a decision; and
    in the appeal.                                                                  (c) the making of a decision or failure to make a decision; and
(5) If an appeal is only about a referral agency's response, the                    (d) a purported decision; and
     ——          eo      sent apply to the tribunal or P&E Court to                 (e) adeemed refusal.
(6) To remove any doubt. It is declared that an appeal against an                        ens for a decision or matter, means the decision or
    infrastructure charges notice must not be about-
    (a) the adopted charge itself; or                                               (a) is final and conclusive; and
    () for a decision about an offset or refund-                                    (b) may not be challenged, appealed against, reviewed, quashed,
                                                                                        set aside or called into question in any other way under the
         (i) the establishment cost of trunk infrastructure identified in               Judicial Review Act 1991 or otherwise, whether by the
             aLGIP; or                                                                  Supreme Court, another court, a tribunal or another entity; and
         (ii) the cost of infrastructure decided using the method                   (c) is not subject to any declaratory, injunctive or other order of
             included in the local government's charges resolution.                     the Supreme Court, another court, a tribunal or another entity
230 N                                                                                   on any ground.
      jotice of appeal
(1) An appellant starts an appeal by lodging, with the registrar of the        282 Rules of the P&E Court
    tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
    (a) isin the approved form; and                                                 rules of the court that apply to the appeal.
    (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
            .                              .              |                        the person has not complied with the rules of the P&E Court
(2) The notice of appeal must be accompanied by the required fee.

                                                                                                                                Page 4 of 4

                                                                                                                                          Page 14 of 32

Section 15

GENERAL COMMITTEE MEETING AGENDA   13 MAY 2019




                                   Page 15 of 32

GENERAL COMMITTEE MEETING AGENDA                                                                   13 MAY 2019

                                                                                ATTACHMENT 2
             1.   ASSESSMENT MANAGER CONDITIONS
             PLANNING
                  When Conditions must be Complied With
            1.    Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
                  the use commencing, and then compliance maintained at all times while the use continues.
                  Approved Plans
            2.    Development undertaken in accordance with this approval must generally comply with the
                  approved plans of development. The approved plans are listed in the following table unless
                  otherwise amended by these conditions.
                    Plan No.      Rev. | Plan/Document Name                              Date
                    11147-A800    A       Site Signage Plan, drawn Cadway Projects (as   09/12/2016
                                          annotated by Council)
                    11147-A800    A       Site Elevations, drawn Cadway Projects (as     09/12/2016
                                          annotated by Council)
                                  Sheet | Coles Express Noosaville QLD 5m                26/07/2017
                                  1 of 1
                                  Rev 4
            3.    Development authorised by this approval must be undertaken generally in accordance with
                  the Approved Plans listed within this Decision Notice.
                  Nature and Extent of Approved Development
            4. _ This approval authorises the following signs as defined by the planning scheme and shown
                  on the Approved Plans:
                  a.    One freestanding, pylon sign identified as S1;
                  b. — Two fascia signs — Night Owl and Shell logo (S7).
             5.   The approved signs must not exceed the dimensions and sign areas as shown on the
                  Approved Plan (as annotated).
             6. — This approval authorises the following signs as defined by the planning scheme and shown
                  on the Approved Plans.
                  a.   The Pylon sign must maintain a setback at least 1.50 metres from the front boundary
                  b.    a maximum height of 5 metres;
                  Cc.   a maximum sign face area as shown on the approved plans.
             7.   The 4 spreader ‘Quality Fuels’ signs (non-illuminated) are not approved (as annotated on the
                  approved plans) and must within 6 weeks from the date of this approval be removed or be
                  blanked out and finished in the same colour as the upright white posts they are attached to
                  so as to not stand out.
            8.    The approved signs must be positioned wholly within the property boundaries of the subject
                  site, and must not be located within or across any easements.
             9.   The approved signs must not be used for the advertisement of goods and/or services not
                  sold or conducted on the site (ie. third party advertising).
                  Illumination
             10.  Deleted.

                                                                                                  Page 15 of 32

Section 16

GENERAL COMMITTEE MEETING AGENDA   13 MAY 2019




                                   Page 16 of 32

GENERAL COMMITTEE MEETING AGENDA                                                                      13 MAY 2019

             11.   No signage on site is permitted to be illuminated apart from the approved pylon sign and
                   either the ‘Shell’ fascia or the ‘Night Owl’ sign.
             12.   The approved illuminated pylon sign must not incorporate flashing lights nor involve
                   illumination by any means other than:
                   a. —_ an internal light source
                  b.    a down light, if externally lit.
             13.   Illumination resulting from direct, reflected or other incidental light emanating from the
                   approved signs must not exceed a luminance of 300 candelas per square metre.
             14.   Sign illumination must be switched off outside of approved services station and/or shop use
                   trading hours.
             15.   All conduits, wiring, switches or other electrical apparatus installed on an advertising device
                   must be concealed from general view.
                   Maintenance
             16.   The approved signs must be properly maintained by the owner of the property to ensure the
                   signs continue to comply with the Approved Plans and conditions of this Decision Notice.

                                                                                                     Page 16 of 32

Section 17

GENERAL COMMITTEE MEETING AGENDA                                                                    13 MAY 2019


5                          FINANCIAL PERFORMANCE REPORT - APRIL 2019
DOCUMENT INFORM AT ION




Author                             Manager Financial Services, Trent Grauf
                                   Corporate Services Department

Index                              ECM/ Subject/ 22.09 – Monthly Financial Performance Report

Attachments                        1.    Statement of Income and Expenditure (Profit & Loss and Capital)
                                   2.    Statement of Financial Position
                                   3.    Statement of Cash Flows


EXECUTIVE SUMMARY
Overall year to date operating financial performance as at April 2019 is positive, with operating
revenue continuing to track above budget and operating expenditure below budget. Capital
expenditure is tracking slightly below budget, with capital revenue above target. Budget figures
now incorporate all adjustments adopted as part of Budget Review 3 (BR3) during April 2019.

YTD Financial Performance Summary
                                               Budget        Actual        Variance   Variance      Status
                                                  $m            $m              $m          %
Operating Revenue                                $92.1        $93.0            $0.9      0.9%      On Track
Operating Expense                                $76.4        $75.1            $1.3      1.7%      On Track
Operating Position                               $15.7        $17.9            $2.2      14.0%


Capital Revenue                                   $5.3         $7.1            $2.3      44.5%   Above Budget
Capital Expenditure*                             $22.7        $21.5            $1.2      5.2%    Below Budget
* Reflects constructed assets and intangibles only (excludes contributed)


Financial statements including Statement of Operating Profit & Loss, Summary of Capital
Financial Performance, Statement of Financial Position (balance sheet) and Statement of Cash
Flows are included as attachments for information of Council.

Figure 1: Actual Performance Compared to Budget

               $100
                                                         YTD Budget ($m)
                         $90
                                                         YTD Actual ($m)
                         $80
                         $70
                         $60
                         $50
                         $40
                         $30
                         $20
                         $10
                          $-
                                   Operating Revenue             Operating Expenditure




                                                                                                   Page 17 of 32

Section 18

GENERAL COMMITTEE MEETING AGENDA                                                             13 MAY 2019


RECOMMENDATION
That Council note the report by the Manager Financial Services to the General Committee
Meeting dated 13 May 2019 outlining April 2019 year to date financial performance against
budget.


REPORT
Operating Revenue (YTD Benchmark 83%)
Council has received 98% ($93.0 million) of its operating revenue budget ($95.1 million).
Commentary on each revenue category is provided below.

Category        Summary                          Comments
Rates and       $66.5 million (102%) of the          Overall, rates and levies earned are slightly below
Levies          annual budget of $65.2                 YTD budget, with general rates $83k below
                million has been earned                budget and Tourism Levy $32k below budget
Fees and        $5.9 million (93%) of the $6.3       Local laws fees $68k above YTD budget (95% or
Charges         million annual budget has              $1.2 million of $1.3 million budget earned)
                been earned                          Development related fees $68k above YTD
                                                       budget (91% or $1.2 million of $1.4 million budget
                                                       earned) – offset by additional salary and
                                                       development appeal legal costs above YTD
                                                       budget
                                                     Building and plumbing application/ search fees
                                                       $50k above YTD budget (90% or $1.7 million of
                                                       $1.8 million budget earned)
                                                     Waste management temporary bin services $55k
                                                       above YTD budget (306% or $75k of $25k budget
                                                       earned)
Sale of Goods   $8.1 million (87%) of the $9.3       Eumundi Road landfill disposal charges and
and Services    million budget has been                recyclable sales $146k above YTD budget (90%
                received                               or $2.7 million of $3.0 million budget earned)
                                                     Holiday parks $60k above YTD budget (87% or
                                                       $2.7 million of $3.1 million budget earned)
                                                     Noosa Leisure Centre $46k above YTD budget
                                                       (92% or $493k of $536k budget earned)
Interest        $4.4 million (95%) of the $4.6       Investment revenue $125k above YTD budget
Received        million annual budget has              (95% or $1.5 million of $1.6 million budget earned)
                been earned                          Interest on overdue rates and charges $35k above
                                                       YTD budget (93% or $426k of $458k budget
                                                       earned)
Dividend and    On track                         Nil
Tax
Other           $2.2 million (98%) of the $2.2       Works Operations internal plant hire recoveries
Revenue         million budget has been                $360k above YTD budget (167% or $900k of
                earned                                 $540k budget earned) – offset by internal hire
                                                       charges
                                                     Waste Management internal recoveries for landfill
                                                       disposal $49k above YTD budget (329% or $66k
                                                       of $20k budget earned)
Operating       $3.8 million (90%) of the $4.2       Operating grants are in line with budget
Grants,         million budget has been                expectations at this stage.
Subsidies       received


                                                                                            Page 18 of 32

Section 19

GENERAL COMMITTEE MEETING AGENDA                                                                     13 MAY 2019


Figure 2: Operating Revenue Position by Type (Excluding Rates)

   $9.0
                                                                           YTD Budget ($m)
   $8.0
                                                                           YTD Actual ($m)
   $7.0

   $6.0

   $5.0

   $4.0

   $3.0

   $2.0

   $1.0

   $0.0




                                                                           Income
                Charges




                                                                                          Other
                                                             Goods &




                                                                                                        Grants
                               Dividend




                                                             Services
                                                             Sales of




                                                                            Rental
                                             Interest
                Fees &




                                & Tax




Operating Expenditure (YTD Benchmark 83%)

Actual operating expenditure is currently 80% ($75.1 million) of full year budget ($93.7 million).
Detailed commentary for each expenditure category is provided below.

Category              Summary                           Comments
Employee              $25.4 million (79%) of the           Under expenditure for permanent staff salaries and
Costs                 annual budget of $32.1                 wages ($2.0 million) partially offset by casual staff,
                      million has been expended              external labour hire ($865k), sick / other leave
                                                             ($455k), allowances, overtime and penalty rates
                                                             ($155k).
                                                           Staff training underspend of $45k YTD (noting that
                                                             a further $58k is committed to suppliers for future
                                                             training)
Materials and         $31.6 million (75%) of the           Waste management contract services $240k below
Services              $42.3 million annual budget            YTD budget (80% or $6.5 million of $8.1 million
                      has been expended.                     budget spent) – waste collection and landfill
                                                             operation
                                                           Waste education program $66k below YTD budget
                                                             (38% or $48k of $126k budget spent)
                                                           Fleet costs for fuel and tyres $134k below YTD
                                                             budget (63% or $416k of $660k budget spent)
                                                           Maintenance of Council buildings and amenities
                                                             $108k below YTD budget due to timing of
                                                             scheduled work (66% or $529k of $798k budget
                                                             spent)
                                                           Community Development grants $101k below
                                                             budget due to timing of grant allocations (83% or
                                                             $820k of $984k budget spent)
                                                           Parks and Gardens maintenance costs $93k below
                                                             YTD budget due to timing of mowing and arborist
                                                             works (82% or $3.5 million of $4.3 million budget
                                                             spent)


                                                                                                    Page 19 of 32

Section 20

GENERAL COMMITTEE MEETING AGENDA                                                                          13 MAY 2019


Category                    Summary                Comments
                                                    Maintenance of Council leased properties $79k
                                                      below YTD budget (70% or $1.4 million of $2.1
                                                      million budget spent) – relating to the timing of
                                                      community building refurbishment works
                                                    Public Transport Levy consultancy and initiatives
                                                      spend $66k above YTD budget (81% or $617k of
                                                      $763k budget spent)
                                                    Environment Levy grants and contributions $60k
                                                      budget due to timing of grant program (28% or
                                                      $121k of $430k budget spent)
                                                    Environmental Health costs for vector control $56k
                                                      below YTD budget (40% or $51k of $128k budget
                                                      spent)
                                                    Cemetery operations $54k below YTD budget
                                                      (55% or $97k of $177k budget spent)
                                                    Development assessment legal appeals costs
                                                      $110k above YTD budget (102% or $896k of
                                                      $878k budget spent)
Finance Costs               On track               Nil
Depreciation                On track               Nil
Other                       On track               Nil
Expenses


Figure 3: Operating Expenditure Position by Type

 $35
                                                                         YTD Budget ($m)
 $30
                                                                         YTD Actual ($m)
 $25

 $20

 $15

 $10

  $5

  $0
                                                         Finance Costs
                                       Materials




                                                                                           Depreciation
                Employees




                                                                                                           Other




Capital Revenue
YTD capital revenue of $7.6 million received comprises cash contributions from developers ($1.8
million), capital grants ($2.7 million) and contributed assets ($3.1 million). Note that the timing of
capital grant receipts are generally dependent on the timing of grant conditions and also capital
delivery performance, and that the timing of the receipt of developer contributions (both cash and
contributed) is unpredictable.



                                                                                                          Page 20 of 32

Section 21

GENERAL COMMITTEE MEETING AGENDA                                                                  13 MAY 2019


Figure 4: Capital Revenue by Type

  $3.5
                                                                YTD Budget ($m)
                                                                YTD Actual ($m)
  $3.0

  $2.5

  $2.0

  $1.5

  $1.0

  $0.5

  $0.0
                    Contributions




                                                    Subsidies




                                                                                    Contributed
                                                     Grants /




                                                                                      Assets
                       Cash




Capital Expenditure Program
Actual capital expenditure (excluding commitments) is $21.3 million (YTD budget $22.7 million).
Detailed discussion of progress in the delivery of the capital works program is provided via a
separate report by the Infrastructure Services Department.


Figure 5: Capital Program Delivery Performance

 $20.0
                                                                               YTD Budget ($m)
 $18.0
                                                                               YTD Actual ($m)
 $16.0
 $14.0
 $12.0
 $10.0
  $8.0
  $6.0
  $4.0
  $2.0
  $0.0
                                    Capital works                        Other capital




Cash Management and Investment Performance
Total cash on hand at the end of April 2019 was $72.2 million. Included in this balance are funds
held in trust and for restricted purposes (e.g. unexpended levy and grant funds) and monies
committed for funding capital projects during the year. The cash balance will progressively

                                                                                                  Page 21 of 32

Section 22

GENERAL COMMITTEE MEETING AGENDA                                                                          13 MAY 2019


reduce over the next quarter, aligning to budget forecasts by year end, as operational and capital
expenditure outstrips expected revenue.

The pie charts following present the mix of cash held at April 2019 by agency (graph on the left)
and by credit risk rating (graph on the right). All funds have been invested in accordance with the
Investment Policy and in consideration of the principles of ethical investment, preservation of
capital, return on investment and counterparty thresholds.

Figure 6: Closing Cash Held by Agency and Credit Rating


                     Bendigo                                                    A3
               Suncorp 6%                                                    (Bendigo)
                                                                           A1 6%
                  3%
              NAB                                                       (Suncorp)
              8%                                                           3%

                                                                        A1 +
      CBA                                                           (CBA + NAB +
      12%                                                             Wpac)…

                                                                                                  A1 +
                                      QTC                                                        (QTC)
                                      71%                                                         71%




The following chart monitors the year-to-date trend on total cash and the agencies invested.
During April, $4 million was drawn down from deposit with QTC and was utilised to fund
operating and capital expenditure requirements. All other investments were stable as sufficient
working cash was available to fund Council’s requirements for the month.

Figure 7: Year to Date Trend of Cash Invested by Agency

 90,000,000


 80,000,000


 70,000,000


 60,000,000


 50,000,000


 40,000,000


 30,000,000


 20,000,000


 10,000,000


         -
             May-18 Jun-18   Jul-18   Aug-18 Sep-18   Oct-18   Nov-18 Dec-18   Jan-19   Feb-19   Mar-19   Apr-19

               Bendigo TD      Westpac TD       NAB TD         Suncorp TD      CBA TD       QTC       CBA Operating




                                                                                                      Page 22 of 32

Section 23

GENERAL COMMITTEE MEETING AGENDA                                                               13 MAY 2019


Actual interest revenue for April was $164k with a weighted average yield of 2.7%, which reflects
a positive return compared to the industry benchmark (Bloomberg AusBond Bank Bill Index) of
2.0%.

Previous Council Consideration
Nil.

Finance
As above.

Risks & Opportunities
Council’s risk register includes a number of risks that could impact on ongoing financial
sustainability. Effective budget management and reporting is an important risk mitigation tool.

Consultation
External Consultation - Community & Stakeholder
Nil.

Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.

Departments/Sections Consulted:

x      Chief Executive Officer   x   Community Services                      X   Corporate Services
       Executive Officer             Director                                x   Director
       Executive Support             Community Development                   x   Financial Services
                                     Community Facilities                        ICT
                                     Libraries & Galleries                       Procurement & Fleet
                                     Local Laws                                  Property
                                     Waste & Environmental Health                Revenue Services

x      Executive Services        x   Environment & Sustainable Development   x   Infrastructure Services
       Director                      Director                                    Director
       Community Engagement          Building & Plumbing Services                Asset Management
       Customer Service              Development Assessment                      Buildings and Facilities
       Governance                    Economic Development                        Civil Operations
       People and Culture            Environmental Services                      Disaster Management
                                     Strategic Land Use Planning                 Infrastructure Planning,
                                                                                 Design and Delivery




                                                                                              Page 23 of 32

Section 24

GENERAL COMMITTEE MEETING AGENDA       13 MAY 2019


                                   Attachment 1




                                      Page 24 of 32

GENERAL COMMITTEE MEETING AGENDA                                                                                            13 MAY 2019

                                                                                                                     Attachment 1

      Noosa Council
      Statement of Income and Expenditure
      For the Year Ended 30 June 2019
      As at 30 April 2019
                                                            Current           Current
                                                             Budget           Budget           Actual         Variance         Annual
                                                                2019             YTD               YTD              YTD        Budget
                                                              ($'000)          ($'000)          ($'000)          ($'000)          %
      Profit and Loss Statement

      Revenue
          Recurrent Revenue
          Rates, levies and charges                            65,251           66,553           66,454              (98)       102%
          Fees and charges                                      6,391            5,615            5,918              303         93%
          Dividend income                                       1,600              669              669                 -        42%
          Interest received                                     4,642            4,257            4417               160         95%
          Tax equivalents                                       1,450            1,409            1,409                 -        97%
          Sale of Goods and major services                      9,316            7,786            8,085              300         87%
          Sale of contract and recoverable works                   23                -                3                3         14%
          Rental & lease income                                 1,292            1,135            1,142                7         88%
          Other income                                           924               772            1,031              259        112%
          Grants, subsidies, contributions and donations        4,235            3,886            3,824              (62)        90%
                                                               95,123           92,082           92,953              871         98%
      Expenses
          Recurrent Expenses
          Employee benefits                                    32,106           25,595           25,371             (224)        79%
          Materials and services                               42,290           32,710           31,575           (1,135)        75%
          Finance costs                                         2,309            1,909            1,900               (9)        82%
          Depreciation and amortisation                        16,864           16,054           16,067               13         95%
          Other expenses                                          154              140              172               32        112%
                                                               93,723           76,407           75,085           (1,322)        80%
      Operating Result                                          1,400           15,675           17,867            2,193

      Summary of Capital Revenue and Expenditure

      Capital Revenue
          Capital contributions and donations                   4,043            2,839            4,915            2,076        122%
          Grants, subsidies, contributions and donations        3,375            2,428            2,695              267         80%
          Other capital revenue                                     -                -                -                 -
      Total Capital Revenue                                     7,419            5,267            7,610            2,343,

      Capital Expenditure
          Contributed assets                                    2,000            2,000            3,072            1,072        154%
          Constructed assets                                   28,391           22,692           21,516           (1,175)        76%
          Other capital expenses                                    -                -              734              734
      Total Capital Expenditure                                30,391           24,692           25,322              630

                                                                                                                           Page 24 of 32

Section 25

GENERAL COMMITTEE MEETING AGENDA      13 MAY 2019



                                   Attachment 2




                                     Page 25 of 32

GENERAL COMMITTEE MEETING AGENDA                                                                                                 13 MAY 2019

                                                                                                                            Attachment 2

             Noosa Council
             Statement of Financial Position
             For the Year Ended 30 June 2019
             As at 30 April 2019
                                                                                Current                  Actual                  Actual
                                                                                 Budget                     YTD                Full Year
                                                                                    2019                   2019                    2018
                                                                                  ($'000)                ($'000)                 ($'000)
             Current Assets
                  Cash and cash equivalents                                        53,496                 72,233                  64,193
                  Trade and other receivables                                       8,795                  7,532                   6,979
                   Inventories                                                        330                    227                     225
                  Other current assets                                                490                  4,079                   4,115
                                                                                   63,111                 84,071                  75,512
                   Non Current Assets held for sale                                     -                      -                       -
             Total Current Assets                                                  63,111                 84,071                  75,512
             Non Current Assets
                  Trade and other receivables                                      54,025                 49,218                  49,218
                  Other non current Assets                                              -                      -                       -
                   Investments                                                     73,332                 60,978                  60,978
                   Investment property                                              4,405                  4,167                   4,167
                   Property, plant and equipment                                  895,127                873,549                 866,604
                   Intangible assets                                                7,027                  5,563                   5,048
             Total Non Current Assets                                           1,033,916                993,474                 986,014
             Total Assets                                                       1,097,027              1,077,545               1,061,526
             Current Liabilities
                  Trade and other payables                                          4,747                  8,213                  11,679
                   Borrowings                                                       3,621                    315                   3,969
                  Provisions                                                        4,061                  3,029                   4,648
                  Other                                                               665                    591                     697
             Total Current Liabilities                                             13,094                 12,148                  20,993
             Non Current Liabilities
                  Trade and other payables                                              -                      -                       -
                   Borrowings                                                      31,674                 32,171                  32,171
                  Provisions                                                       10,686                  9,858                   9,738
             Total Non Current Liabilities                                         42,360                 42,029                  41,909
             Total Liabilities                                                     55,454                54,177                   62,902
             Net Community Assets                                              1,041,573              1,023,368                 998,624
             Community Equity
                  Asset Revaluation Surplus                                        58,039                 41,740                  41,740
                   Retained Surplus / (Defeciency)                                      -                      -                       -
                  Shire Capital                                                   983,534                956,885                 961,335
                  Current Year Net Earnings                                             :                 24,744                  (4,450)
             Total Community Equity                                            1,041,573              1,023,368                 998,624

                                                                                                                                Page 25 of 32

Section 26

GENERAL COMMITTEE MEETING AGENDA    13 MAY 2019



                                   Attachment 3




                                   Page 26 of 32

Attachment 3

Noosa Council
Statement of Cash Flows
For the Year Ended 30 June 2019
As at 30 April 2019
                                                                         Current Budget               Actual                Actual
                                                                                    2019                 2019                 2018
                                                                                  ($'000)              ($'000)              ($'000)

Cash flows from operating activities

      Cash Flows from Operating Activities

      Receipts from Customers                                                      81,990              85,154               87,075
      Payments to Suppliers and Employees                                         (81,752)             (66,163)             (77,033)
                                                                                     238               18,991               10,042
      Receipts:
      Investment and Interest Revenue Received                                      4,641               4,417                4,701
      Rental Income                                                                 1,293               1,142                 1,301
      Non Capital Grants and Contributions                                          4,286               3,824                6,052
      Income Tax Equivalent Received                                                1,200               1,409                3,067
      Income from Equity Investments                                                1,850                 669                   30
      Payments:
      Borrowing Costs                                                                   -                    -                    -
      Interest Expense                                                               (355)               (265)                (131)

      Net Cash Inflow/(Outflow) from Operating Activities                          13,152              30,187               25,062

Cash Flows from Investing Activities

      Receipts:
      Proceeds of Sale of Property, Plant and Equipment                               (32)                   -                 154
      Grants, Subsidies, Contributions and Donations                                5,419               7,610                6,369
      Payments:
      Payments of Property, Plant and Equipment                                   (26,026)             (23,552)             (26,981)
      Payments for Intangible Assets                                               (2,365)               (916)               (1,874)

      Net Cash Inflow/(Outflow) from Investing Activities                         (23,004)             (16,858)             (22,332)

Cash Flows from Financing Activities

      Receipts:
      Proceeds from Borrowings                                                      2,475                    -                1,165
      Payments:
      Repayment of Borrowings                                                      (3,320)              (5,289)              (5,165)

      Net Cash Inflow/(Outflow) from Financing Activities                            (845)              (5,289)              (4,000)
      Net Increase/(Decrease) in Cash and Cash Equivalents held                   (10,697)              8,040                (1,270)

      Cash and Cash Equivalents at the beginning of the reporting period           64,193              64,193               65,463
      Cash and Cash Equivalents at the end of the reporting period                 53,496              72,233               64,193

                                                                                                                          Page 26 of 32

Section 27

GENERAL COMMITTEE MEETING AGENDA                                                          13 MAY 2019


6                        QUEENSLAND TREASURY CORPORATION REVIEW OF COUNCIL LIQUIDITY
DOCUMENT INFORM AT ION




Author                           Manager Financial Services, Trent Grauf
                                 Corporate Services Department

Index                            ECM/ Subject/ 22.08 – Loans & Queensland Treasury Corporation

Attachments                      Nil


EXECUTIVE SUMMARY
An independent review of Council’s financial liquidity was undertaken by Queensland Treasury
Corporation (QTC) to determine the optimal level of cash Council should hold to ensure efficient
use of funds. The review identified that Council is currently holding surplus cash at bank above
optimal levels. This surplus cash currently equates to approximately $20 million, and reduces to
approximately $10 million over the next decade.
It is proposed that $10 million of cash be utilised to reduce current debt levels, with the remaining
$10 million held at bank for future investment opportunities or emergent needs. A reduction in
debt will provide net savings to Council’s operating position in future years and generate capacity
within the operating surplus for growth.

RECOMMENDATION
That Council note the report by the Manager Financial Services to the General Committee
Meeting dated 13 May 2019 regarding liquidity review outcomes, and authorise the CEO to apply
to QTC to undertake a $10 million debt repayment by 30 June 2019.

REPORT

QTC Liquidity Review
Liquidity is a key element of effective cash flow management for Council. It involves a balance
between the requirement for sufficient funds to meet short to medium term operations and capital
project delivery, versus the opportunity cost of holding excess cash as a buffer for future
opportunities. Holding too much cash (buffer) comes at a cost as it may be better applied
elsewhere and can affect profitability. Conversely, it is important to recognise holding too little
cash can affect Council’s financial sustainability.
Given Council’s sound financial position over recent years, reflected by operating surpluses,
steady cash reserves and low debt levels, Council is now in a position where it can rely on
historical performance and forecasts to reassess its approach to liquidity. Queensland Treasury
Corporation (QTC) were engaged to undertake a liquidity review, with the scope of the review to
assess Council’s 10 year financial plan forecast, determine baseline cash requirements over the
next 10 years and identify whether there is any surplus cash (above baseline requirements) that
could be better utilised.

Assessment of Cash
Council’s total cash cycle fluctuates on a bi-annual basis by approximately $26 million. This cash
cycle increases as rates are paid in February and August and then declines as cash from rates
are used to fund operating and capital expenditure. At the last peak in February 2019, total cash
on hand was $84 million. This has steadily increased from the February 2016 peak of $81 million
(maximum of $91 million in February 2018). Council’s 10 year financial plan forecasts cash
balances to remain at a peak levels between $80 - $90 million over the next decade.



                                                                                         Page 27 of 32

Section 28

GENERAL COMMITTEE MEETING AGENDA                                                      13 MAY 2019


The QTC review segregated Council’s cash balance into four categories:

1. Short Term Surplus (Cash Cycle): Working capital from rates and other operating revenue
   used to fund operations, capital expenditure and servicing debt.
2. Cash Cover: Additional cash set aside to ensure financial sustainability of Council and the
   ability to pay outgoings in the event of unexpected circumstances. Regulatory benchmarks
   set a minimum of 3 months, with a conservative maximum of 6 months.
3. Externally Restricted: Unexpended levies, grants, developer contributions or loans.
4. Long Term Surplus: Additional cash held (in addition to the above) that is not forecast to
   fund operating or capital requirements over the next decade.

The graph below summarises Council’s forecast cash balance over the next decade separated
by the above categories.

Figure 1: Forecast Cash Balances – by Liquidity Category




The above analysis reveals that, even after allowing for cash cycles from capital and operating
programs, setting aside restricted cash and a 3 month cash cover buffer, Council currently has
surplus cash of approximately $20 million. Over the next decade, this surplus will reduce to
approximately $10 million.

Council is currently investing all cash held in accordance with the Investment Policy and in
consideration of the principles of ethical investment, preservation of capital, return on investment
and counterparty thresholds. For the 2019 year to date, Council has been achieving a return of
2.6% on average for cash invested.

Assessment of Debt

The book value of Council’s existing loan borrowings is approximately $35 million (market value
$38 million). All loans are raised through QTC at a fixed interest rate for a 20 year term. As
shown in the figure below, the majority of Council’s debt relates to borrowings transferred as part
of de-amalgamation at a fixed interest rate of 6.29%.

                                                                                     Page 28 of 32

Section 29

GENERAL COMMITTEE MEETING AGENDA                                                                               13 MAY 2019


Figure 2: Existing Loans
                                                                              Book         Expected Loan         Current Loan
               Account               Market Value            Balance
                                                                              Rate          Term (years)          Repayment
Noosa North Shore Campground                    252,432          248,185             3.47%           19.23                 8,810
Rufous Street Development                      1,825,949        1,815,447            3.31%             18.23              66,002
Noosa SC Capital Work Prog 15/16               1,227,735        1,243,852            3.04%             17.23              46,098
Shire Planning Scheme - Project                 802,694          794,201             3.12%             11.22              41,246
Shire Planning Scheme -Climate C                 98,490           97,448             3.12%             11.22               5,061
Noosa Planning Scheme 2016-17                   716,846          717,895             2.82%             10.22              39,639
Noosa SC Capital Work 14/15Waste                619,169          594,589             3.73%              8.22              40,887
Noosa SC Debt Account                      30,972,277          27,317,473            6.29%              7.22           2,280,568
Noosa SC Capital Work Prog 13/14               1,657,853        1,569,890            4.19%              7.22             122,072


As these existing loans are repaid over the next decade, a further $15 million of new borrowings
are forecast for major capital projects. As at April 2019, the interest rate for new QTC borrowings
was 2.7% for a 20 year term (or 2.3% for 10 years). The finance costs for any new loans is much
lower than that of Council’s existing loans.

Figure 3: Forecast New Loans

 $6,000,000


 $5,000,000


 $4,000,000


 $3,000,000


 $2,000,000


 $1,000,000


          $0
                     2019          2020               2021             2022       2023          2024              2025


Recommended Approach

The options for applying this surplus cash are summarised in the table below. It should be noted
that Council cannot apply cash reserves to fund operating initiatives given it would likely result in
an operating deficit and breach Council’s Financial Sustainability Policy.

Figure 4: Options for Applying Surplus Cash

Option                                    Advantage                                  Disadvantage
Continue to retain surplus cash                Buffer for emergent activities         Ineffective allocation of cash
for emergent events and major                    and projects (in addition to             if is surplus cash is not
projects / initiatives not yet                   cash cover and as an                     utilised in the future
identified                                       alternative to loans)




                                                                                                               Page 29 of 32

Section 30

GENERAL COMMITTEE MEETING AGENDA                                                            13 MAY 2019


Option                             Advantage                           Disadvantage
Early repayment of existing loan      Interest saved on loans           Interest on cash at bank
borrowings                              which is fixed at 6.29%             foregone at 2.7%
                                                                          Upfront early repayment
                                                                            adjustments of $1.36 million
                                                                            required by 30 June
                                                                            (difference between book
                                                                            and market value of loans)
Defer new borrowings and use          Marginal – borrowing rate of 2.7% currently equal to cash
cash instead                            investment yield being achieved of 2.7%

The recommended approach is a combination of the above, involving the allocation of half the
current surplus cash to fund an early repayment of $10 million of existing loan borrowings by 30
June 2019. The remaining $10 million existing surplus cash is proposed to be retained as cash,
allowing for annual reassessment of cash and borrowing needs as part of future budget
processes.

The $10 million repayment of existing borrowings involves:
 An upfront payment of $1.36 million in the 2018/19 year. The current 2018/19 operating
   surplus (BR3) forecasts an operating surplus of $1.4 million and indicates there is sufficient
   funds to accommodate this payment and still retain a surplus in line with Council’s Financial
   Sustainability Policy.
 A reduction in both finance costs and interest revenue in future years for the seven remaining
   years on the loan term will generate an additional net saving for the operating budget. For the
   2019/20 year this equates to approximately $270k.
 The net total benefit over the next 10 years is approximately $315k.

The following table and graph presents the net impact to the operating surplus each financial
year.

Figure 5: Impact to Operating Budget from a $10 million Early Loan Repayment




                                                                                           Page 30 of 32

Section 31

GENERAL COMMITTEE MEETING AGENDA                                                         13 MAY 2019




Credit Rating and Capacity to Secure Borrowings in the Future
A Credit Review was also undertaken by QTC in February 2019. The aim of the credit review
was to evaluate Council’s financial position and ongoing viability, as well as capacity for loan
borrowings. Council’s credit rating has again been rated as Sound, with a Neutral outlook. QTC
identified that the Sound rating reflects Council's robust historical and forecast financial
performance, supported by its high Council control revenue, relatively low debt balance, strong
cash position, operating surpluses and a sound debt servicing capacity.
This outcome supports Council’s requirement to undertake new loan borrowings in future years
where required.

Working Capital Facility
QTC have also identified that Council is also eligible to apply for an overdraft working capital
facility should a need arise in the future. The overdraft facility, set at competitive marginal interest
rates in line with investment rates, is an alternative financial instrument to consider for accessing
short term cash if there is any risk of using up surplus or the prescribed 3 month cash cover
during a period of unexpectedly high spend or other crisis.

An analysis undertaken by both QTC and Council staff indicates that there is presently no need
for Council to access this facility.

Previous Council Consideration
Nil.

Finance
In line with the Financial Sustainability Policy, Council will still maintain an operating surplus for
the 2018/19 year and improved surpluses in future years. All of Council’s financial sustainability
ratios will remain within the required benchmark ranges.

Risks & Opportunities
The realisation of net savings in interest from the early repayment of loans is subject to market
fluctuations in interest rates.



                                                                                        Page 31 of 32

Section 32

GENERAL COMMITTEE MEETING AGENDA                                                            13 MAY 2019


Forecast cash surpluses are also reliant on the accuracy of the long term financial plan, and in
particular the capital works program. Any significant increase in capital works spend beyond
current forecast levels will in turn consume the cash surplus. Therefore the allocation of this
surplus cash needs to be considered in line with intended frequency, size and scale of any
potential future signature capital projects (noting that capital expenditure forecasts in the 10 year
financial plan are consistent with recent levels).

Should additional cash be required in the future to fund unexpected shortfalls or major capital
projects, Council has the capacity to activate new debt instruments such as loan borrowings or a
working capital facility. The cost of debt on these facilities is lower than that of existing
borrowings.

Consultation
External Consultation - Community & Stakeholder
Queensland Treasury Corporation have been consulted extensively during this review to provide
independent advice on Council’s cash and debt requirements.

Internal Consultation
The Executive Team has reviewed and endorsed this proposal.

Departments/Sections Consulted:

X   Chief Executive Officer       Community Services                      X   Corporate Services
    Executive Officer             Director                                x   Director
    Executive Support             Community Development                   x   Financial Services
                                  Community Facilities                        ICT
                                  Libraries & Galleries                       Procurement & Fleet
                                  Local Laws                                  Property
                                  Waste & Environmental Health                Revenue Services

    Executive Services            Environment & Sustainable Development       Infrastructure Services
    Director                      Director                                    Director
    Community Engagement          Building & Plumbing Services                Asset Management
    Customer Service              Development Assessment                      Buildings and Facilities
    Governance                    Economic Development                        Civil Operations
    People and Culture            Environmental Services                      Disaster Management
                                  Strategic Land Use Planning                 Infrastructure Planning,
                                                                              Design and Delivery




                                                                                           Page 32 of 32

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.