GENERAL COMMITTEE MEETING AGENDA                                                   13 MAY 2019


RECOMMENDATION
That Council note the report by the Coordinator Planning to the General Committee Meeting
dated 13 May 2019 regarding representations made to Development Approval No. MCU18/0165
for Multiple Housing - Type 4 Conventional situated at 25 Kauri St Cooroy and:
A.    Agree to change conditions 21 and 29 as follows:
     21.   The full length of the Kauri Street and Olivine Street frontages of the development
           site must be upgraded by providing kerb & channel, bitumen road widening,
           stormwater structures and landscaping improvements to the footpath in accordance
           with an Operational Works approval. The works must include but are not limited to
           the following:
           21.1. In regard to the Kauri Street frontage, the new kerb and channel must be
                 aligned so that it is offset 8 metres from the existing kerb and channel on the
                 western side of Kauri Street measured from the nominal face of the kerb. The
                 new works must be extended to the north of the subject site and be generally in
                 accordance with drawing number 2018068 – Dwg 04 of 24 titled External Works
                 Layout Plan dated March 2019 prepared by 360 Civil Consulting and join
                 smoothly with the existing formation.
           21.2. In regard to the Olivine Street frontage the new kerb and channel must be
                 aligned at about 12m offset from and parallel to the property boundary and
                 must extend for the full frontage of the subject site. The works shall include
                 suitable tapers extending beyond the frontage of the subject site to smoothly
                 join to the existing pavement.
           21.3. The works (Kauri Street, Olivine Street and the intersection) must include
                 suitable drainage structures and stormwater collection to ensure that runoff
                 from the road formation is collected, controlled and directed to ensure that the
                 roadway is safely trafficable and must be in compliance with the relevant
                 sections of the Queensland Urban Drainage Manual (QUDM).
           21.4. As part of the application for operational works, the developer’s civil
                 engineering consultant shall investigate and report on the possible deficiencies
                 in the existing stormwater system, to the western end of Agate Street and
                 including inspection by closed circuit television (CCTV) of the existing
                 stormwater system. The developer is required to rectify any deficient
                 stormwater pipes or structures extending from the development frontage down
                 to and including the manhole downstream of the 600x1200 box culvert which
                 crosses Kauri Street.
           21.5. The design and construction of all works shall be carried out in accordance with
                 Council’s Planning Scheme Policy PSP05 – Engineering Design Standards –
                 Roads, Drainage and Earthworks and the applicable engineering standards
                 current at the time of construction. The above condition is imposed pursuant to
                 s145 of the Planning Act 2016 being non-trunk infrastructure.
     29.   A CCTV inspection must be carried out by a Council approved CCTV contractor upon
           satisfactory completion of construction works that are to become a Council asset. The
           developer will be responsible for the full cost of CCTV inspection, including any
           additional inspection necessary following defect identification and rectification.
B.    Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.




                                                                                   Page 4 of 32
Log in to download the original file

2019-05-13 General Committee Meeting Agenda(PDF, 4MB).pdf · 3.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.