Council archive · source document
07/0967 - MCU - Detached House [As Published] · 132007.967
3B-MAY-20@7 16:17 FROM:PAUL CLOUT
INTEGRATED PLANNING ACT 1997
DESIGN 87544285399 TO:54471a62
IDAS Assessmant Chackist, Version 20, 2 Apri 2007
State-controlted road matters 2, The application involves: (ick appicsbie howtos)
For more informaliun refer to Guide 3.
Uioss you a “none oft abo" t C2, C1 () development on tand contiguous to a State onitotled toad and for -
{he eppfication ifggara raferal to the Departmant| C1 (a) materiat change of use assessable.against the planning scheme;
vectra | _Clmeanfguig wa es
‘nancy, whi tn other circumstance DME wap + the total number of ots is not increased; and
bea concurrence aguncy, - « the total number of lots abutting the State-controlled road is not increased;
senate 2 tre Redan wit ase yexrto Oe Operational Work (not essociated with @ material change of use assessable against the
conruirence agency for ha application, planning schome or reconfiguring @ tot mentioned in {b) above)—
+’ associated with access to a State-controlled road; or
« for filling oF excavation: or
+ involving the redirection or intensification of site stormwater from the fand, through a
pipe with a cross-sactional area greater than B25 cm? that directs stormwater to a
State-controlted road,
71 (ii) devetopment on tand not contiguous to a State-controlled road snd -
O(a) matoriet change of use -
* assessable against the local government's planning scheme; and
* Mentioned In schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule:
LD (b) reconfiguring a fot fora Purpose mentioned in schedule 5 of the IP regulation
and excagding the thrasholds set by that schedule;
C1) operational work {not associated with @ material change of use assessable against the
planning scheme or raconfiguring @ fot mentioned in (d) above}
» assessable against the local goverment's planning schems; and
* mentioned In schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
i) None of the above
“Cloning vagatation 3. The arr‘cation involves: {fet eppfcetio bax/ag)
Far mere ioimaton rater to Guie 12 C7. material change of use -
romper ie eee | 003, (a) assessable against the planning scheme;
aa atu and W (b} on a lot containing —
tan agency thor tha) NRW is the nseessmant * Acatagory 1, 2.0 3 area shown an 8 property map of assessable vegetation; or
ananager for tno application, NRW is @ . + if there is no property map of assessable ‘vegetation for the lot - remnant vegetation;
en mana be Aeaeaon in cation {c)_ where the existing use of the land is a rural or environmental use; and
ify Kd) e (), your pono eu (d)_ where the size of the land is 2 hectares or langer - complete Part J of Farm 1
eforral to NRW fre esseasmon! tagardiasn of i -
vhather vegetation uring iar proposed or oh C reconfiguring 3 tot
(a) on alot containing a category 1, 2 or 3 area shown ona Property map of
assessable vegetation or, If there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b) where the size of the lot before the fecanfiguration is 2 hectares or larger;
(c) where 2 or more lots ara created: and .
{d)_ where the size of any lot created is 2 hectares or smaller complete Part J of Form {
Di( ii) operational work -
(2) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(0) not associated with a material change of use assessable against the planning
scheme mentioned in (I) or reconfiguring a lat mentioned in (il). completa Past J of
Form 1
wh none of the above,
“Strategic port land . 4. The application involves: °
Vor magma Infrrmation roto wu Gua 11. C1) development on strategic porl tand as defined in the Transport infrastructure Act 1994 (T
Hf YoU Tichod ())- the relevent Port Autherity in tha
asueumant manager tr th sppteaton Act) - completo Por I of Form 1
AT you tieked (7) Qubanatand Trunapan ls a CO (i) a metertal change of use thal is inconsistent wih the land use plan approved under the
eancurrence agunity for ths apntication, Tl Act for the strategic port tand - completa Part fof Form 4
an none of the above
4) Land contiguous bo a State-controfed (oad is defined in
controled road.
‘Schedute 14 of the IF Reguiation to cman land: « ff port of the tenad i wtihiny 100m of tho State-cantraed road; or that Is part of a future Stato
Pego2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0967 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.