Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2019-05-07 Planning & Environment Committee Agenda

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                                                                                 7 MAY 2019


BRANCH ACTIVITIES                        RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                          THE NEXT QUARTER
Sustainable Fisheries Direction Paper       Reported back to Council on                 Providing feedback and input to           Present option paper to Council.
                                              successful tender arrangements.               consultants to finalise the options       Discuss     Council      position  on
                                            Interim report and presentation to            paper.                                      commercial fishing to provide
                                              Councillors on 20 February 2019.            Prepare to present options paper to         feedback into State Fisheries
                                                                                            Council.                                    Reform consultation processes.
Implementation of the ZEN Organisation      Tewantin building lighting retrofit         Noosa landfill emission reduction         Modelling of costs/benefits of landfill
Strategy                                      90% complete                                  strategies                                  emission reduction strategies
                                            Presentation to Council of the ZEN          Community       emission   reduction      Scope the revised ZEN strategy
                                              Organisational Strategy Update                opportunities                               following the finalisation of the
                                            Commencement of Tewantin roof &             Working with waste on behaviour             Environment Strategy for Council
                                              90kW solar system installation                change initiative                           consideration later in the year.
                                            Investigation of opportunities to           Relocation of 10kW solar system           Collation & review of electricity and
                                              improve landfill gas extraction at the        from Tewantin building to Pomona            consumption of solar data for first
                                              Noosa landfill                                Depot                                       year since installation.
                                            Noosa River Holiday Park & Butter           NAC Pool LED retrofit
                                              Factory procurement process                 Offset opportunities
                                            Completion of LED upgrade at the
                                                                                          ZEN     Organisational    strategy
                                              Noosa Leisure Centre
                                                                                            review
                                            NAC LED Pool light retrofit -
                                              engineering inspections complete
                                            Procurement and evaluation process
                                              for the Noosa Library underway
                                            Community ZEN events
Private Land Conservation Partnerships      Natural Areas staff have been               All contractual requirements for          Review the role of the Community
- Land for Wildlife and Voluntary             temporarily filling the Community             Voluntary Conservation Agreements           Partnerships Conservation Officer
Conservation Agreements.                      Partnerships role managing the                for the 2018/19 financial year have         role, once 2019/20 budget finalised,
                                              Land for Wildlife and Voluntary               been completed, or contractors              with a view to recruiting.
                                              Conservation Agreement programs.              organised with purchase orders            Prioritise properties that have
                                            A new regional coordination model,            raised.                                     expressed an interest in establishing
                                              moving away from a partnership with         We are now up-to date with Land for         VCA’s, through the Environment
                                              Healthy Land & Water is now in                Wildlife visits, having signed up 8         Levy Working Group.
                                              place with Council collaborating with         new properties in the past 2 months.
                                              10 other SEQ Councils and directly
                                              funding a regional coordination role,
                                              currently hosted by Sunshine Coast
                                              Regional Council in an interim
                                              arrangement.




                                                                                                                                                             Page 55 of 63
Log in to download the original file

2019-05-07 Planning & Environment Committee Agenda(PDF, 3MB).pdf · 2.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.