Bligh Tanner Consulting Engineers                                                               Page 15
Noosa Flexi Learning Centre Stormwater Management Plan
August 2012



impervious has been conservatively adopted at 20% (the actual ground level impervious
area, including the full area of the carpark, is about 10%).

Table 7 Rational method estimates of peak flows
                             Predeveloped                                  Developed
Area                         0.8 ha                                        0.8 ha
Frequency factor (Fy)        1.2                                           1.2
Fraction Impervious (Fi)     0%                                            20%*
C10                          0.53                                          0.74
Time of concentration                           10 minutes                 10 minutes
I (mm/hr)                                       250                        250
Peak Flows
Q2 (m3/s)                                          0.1                     0.2
Q10 (m3/s)                                         0.2                     0.3
Q100 (m3/s)                                        0.4                     0.5
*
                           0.60

                                  Predevelopment
                           0.50
                                  Post-development
   Peak discharge (m³/s)




                           0.40


                           0.30


                           0.20


                           0.10


                             -
                                      2                      10                    100
                                              Average Recurrence Interval (yrs)

Figure 6 Comparison of pre and post developed peak flows (without mitigation). The
increase in peak flow for the Q100 is about 140 litres per second.

The increase in the Q100 flow as a result of the development, in absolute terms, is about 140
litres per second.

The detention size, in accordance with initial sizing method outlined in chapter 5.05 of
QUDM, has been estimated at 1 m³ (being the average of QUDM equations 5.01, 5.02, 5.03
and 5.04).

This flood detention is particularly small and could be considered immaterial particularly in
light of
    • the limited infrastructure between the site and the receiving environment (being
         raised classrooms and sporting facilities)
    • the small increase in peak flow is unlikely to have a significant impact on the erosivity
         of flows in Burgess Creek given it has a far larger catchment

Nonetheless the small volume will be easily provided for as follows (in order of preference):
   • in the infiltration depressions beneath the buildings

Used in these records

About this file

File size
1.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

REFERENCED DOCUMENT - Stormwater Management Plan - MCU12_0133.pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.