Council archive · source document
REFERENCED DOCUMENT - Stormwater Management Plan - MCU12/0133
Plans and drawings: the text below has words only, no drawings.
Bligh Tanner Consulting Engineers Noosa Flexi Learning Centre Stormwater Management Plan August 2012 TN Total Outflow (ML/yr),2.08733,1.54178,0.521941,0.431928,0.641761,0.985447,0.213405,1.22261,0.66122 3,1.135 GP Total Outflow (ML/yr),0,16.9487,5.76257,4.74564,7.11847,10.8472,2.37282,0,0,12.5421 No Imported Data Source nodes USTM treatment nodes Location,Tanks,Infiltration,Infiltration,Permeable Paving ID,5,6,7,16 Node Type,RainWaterTankNode,InfiltrationSystemNodeV4,InfiltrationSystemNodeV4,MediaFiltrati onNode Lo-flow bypass rate (cum/sec),0,0,0,0 Hi-flow bypass rate (cum/sec),100,100,100,100 Inlet pond volume,0, , , Area (sqm),10,200,200,92.5 Extended detention depth (m),0.1,0.1,0.1,0 Permanent Pool Volume (cubic metres),20, , , Proportion vegetated,0, , , Equivalent Pipe Diameter (mm),150, , , Overflow weir width (m),10,50,50,20 Notional Detention Time (hrs),16.8E-3, , , Orifice Discharge Coefficient,0.6, , , Weir Coefficient,1.7,1.7,1.7,1.7 Number of CSTR Cells,2,1,1,3 Total Suspended Solids - k (m/yr),400,400,400,8000 Total Suspended Solids - C* (mg/L),12,12,12,20 Total Suspended Solids - C** (mg/L),12,12,12, Total Phosphorus - k (m/yr),300,300,300,6000 Total Phosphorus - C* (mg/L),0.13,0.09,0.09,0.13 Total Phosphorus - C** (mg/L),0.13,0.09,0.09, Total Nitrogen - k (m/yr),40,40,40,500 Total Nitrogen - C* (mg/L),1.4,1,1,1.4 Total Nitrogen - C** (mg/L),1.4,1,1, Threshold Hydraulic Loading for C** (m/yr),3500,3500,3500, Horizontal Flow Coefficient, ,3,3, Extraction for Re-use,On,Off,Off,Off Annual Re-use Demand - scaled by daily PET (ML),0, , , Annual Re-use Demand - scaled by daily PET - Rain (ML),0.384, , , Constant Daily Re-use Demand (kL),0.94, , , User-defined Annual Re-use Demand (ML),0, , , Percentage of User-defined Annual Re-use Demand Jan,8.33333333333333, , , Percentage of User-defined Annual Re-use Demand Feb,8.33333333333333, , , Percentage of User-defined Annual Re-use Demand Mar,8.33333333333333, , , Percentage of User-defined Annual Re-use Demand Apr,8.33333333333333, , , Percentage of User-defined Annual Re-use Demand May,8.33333333333333, , , Percentage of User-defined Annual Re-use Demand Jun,8.33333333333333, , , Percentage of User-defined Annual Re-use Demand Jul,8.33333333333333, , , Percentage of User-defined Annual Re-use Demand Aug,8.33333333333333, , , Percentage of User-defined Annual Re-use Demand Sep,8.33333333333333, , , Percentage of User-defined Annual Re-use Demand Oct,8.33333333333333, , , Percentage of User-defined Annual Re-use Demand Nov,8.33333333333333, , , Percentage of User-defined Annual Re-use Demand Dec,8.33333333333333, , , User-defined Re-use File, , , , Filter area (sqm), ,200,200,92.5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REFERENCED DOCUMENT - Stormwater Management Plan - MCU12/0133Related documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.