Log in to see the plans as drawnSmall craft + 10 m Areas within Minimum channel width of 10m in constrained Discussed
channels width buffer = 0; all river channels maintained to oyster ecosystems with MSQ
channel other areas = 4 do not impede on safe navigation.
maintained
Tidal Works + 30 m Within 250m = Minimum distance of 30m maintained between Discussed
(pontoons, jetties, distance 4; all other areas tidal works and oyster ecosystems. Reduce the with MSQ
boat ramps) maintained =2 chance of damage to the oyster ecosystems, but
also protects vessels and ensures general public
safety when using these facilities.
Moorings + 30 m Within 30 m = 0, Minimum distance of 30m maintained between Discussed
distance all other areas = official moorings and oyster ecosystems to reduce with MSQ
maintained 4 chances of damage to moored vessels oyster
ecosystems. The distance also takes into
consideration the maximum possible length of a
vessel attached to a mooring in the river.
Foreshore Access + 10 m Within exclusion Minimum distance of 10m either side of public Discussed
(beaches and distance area = 0, all foreshore access points maintained for ease of with MSQ
parks) maintained other areas = 4 vessel access to useable shorelines.
In-water urban +5m Within exclusion Minimum distance of 5m maintained between Discussed
utilities distance area = 0, all submarine cables and pipelines and oyster with
(submarine cables maintained other areas = 4 ecosystems. No anchoring of construction vessels engineers
& pipelines) or monitoring vessels within 200m of in-water
urban utilities.
In-water transport + 30 m Within exclusion Minimum distance of 30m maintained between Discussed
utilities (cross- distance area = 0, all in-water transport utilities and oyster ecosystems with MSQ
river cable barges, maintained other areas = 4 to maintain safe operation of public transport
ferry terminals, services in the river.
etc.)
Seaward extent < 30 m* Within exclusion Sites for oyster ecosystem restoration extend Discussed
from area = 0, all from the intertidal zone to a maximum distance of with MSQ
shorelines other areas = 4 30m from the associated shoreline to minimise and DAF
impacts on river users. Exceptions would be Fisheries
subject to careful assessment and the written and Boating
approval of Maritime Safety Queensland. Patrol
Water depth < 2m Within exclusion Oyster ecosystems are only established in water (Gillies et al
below area = 0, all depths less than 2m below the Mean Low Water 2018)
MLWS other areas = 4 Spring tidal line at a restoration site. This
maximised the chance of restoration success.
19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.