3. Noosa Project Restoration Plan V12
Attached to the e-mail Noosa Oyster Project _ Construction and Environmental Management Plan (CEMP).
Attached to the e-mail DA Application - Noosa Oyster Project (1 of 3).
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn and further distorts any potential
natural character of the substrate.
Placing shell in cages, which
decompose by rusting over time, may
allow time for oyster shells to cement
together by natural biogenic
processes, prior to the supporting
cage structure disappearing. However,
this design is yet to be fully tested and
is possibly best suited for sub-tidal
environments where the biogenic
structures are not subject to high
current and wave energy, which may
cause movement or erosion of the
biogenic reef structures.
Not augmenting the restoration
substrate with oyster shell and seeded
oyster cultch and live oysters risks
slow ecological recovery, or possibly
low recruitment due to the variable
nature of oyster recruitment.
Substrate Substrates are designed to maximise Alternative configurations could
design stability, durability, rugosity, include larger substrate footprints of
engineering heterogeneity, prevent impediment to continuous rock, but such structures
fish passage, avoid pooling, minimise would likely affect river flow, may
wave refraction, and erosion of create barriers to fish passage,
shorelines. enhance the erosion potential and
sediment accretion potential of the
substrates to the adjacent shoreline
and shoreline upstream and
downstream of the restoration site.
Works The construction contractor will be The work methods are standard
methods responsible for all works, from material practice which are refined for each
storage and load out to construction, estuary situation. Work methods are
construction monitoring, risk adaptively refined, if required, but the
management and reporting. conservation of existing habitats is
paramount to the methods.
The contractor will operate in accordance
with the specifications in this plan, Site The use of larger deployment
Establishment and Management Plan and equipment, deployment of smaller
Construction and Environmental amounts of substrate but this is
Management Plan (CEMP) and all relevant neither economically efficient nor
permit conditions. enables the project to meet minimum
restoration targets in an effective
Substrate deployment is timed to coincide timeframe.
with periods of the highest natural oyster
55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.