Original source · versioned page text
2303-33746 DA Form1 Application details_3
10.2) Will the subdivision be staged?
Yes – provide additional details below
No
How many stages will the works
include?
What stage(s) will this development
application apply to?
11) Dividing land into parts by agreement – how many parts are being created and what is the intended use of the parts?
Intended use Residential Commercial Industrial Other, please specify:
of parts
created
Number of
parts created
12) Boundary realignment
12.1) What are the current and proposed areas for each lot comprising the premises?
Current Lot Proposed Lot
Lot on plan description Area (m2) Lot on plan description Area (m2)
12.2) What is the reason for the boundary realignment?
13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement? (attach
schedule if there are more than two easements)
Existing or proposed? Width (m) Length (m) Purpose of the Identify the land/lot(s)
easement? (e.g benefitted by the
pedestrian access) easement
Division 3 – Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
14.1) What is the nature of the operational work?
Road work Stormwater Water infrastructure
Drainage work Earthworks Sewage infrastructure
Landscaping Signage Clearing vegetation
Other – please specify: Waterway works (jetty)
14.2) Is the operational work necessary to facilitate the creation of new lots (e.g. subdivision)?
Yes – specify number of new lots:
No
14.3) What is the monetary value of the proposed operational work?(include GST, materials and labour)
Page 5
DA Form 1 – Development application details
Version 1.3—28 September 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original