Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2303-33746 DA Form1 Application details_3

of 13

Page text shows just the words. Original shows the document exactly as it was published.

   10.2) Will the subdivision be staged?
        Yes – provide additional details below
        No
   How many stages will the works
   include?
   What stage(s) will this development
   application apply to?



   11) Dividing land into parts by agreement – how many parts are being created and what is the intended use of the parts?

   Intended use          Residential                   Commercial                        Industrial                     Other, please specify:
   of parts
   created
   Number of
   parts created

   12) Boundary realignment
   12.1) What are the current and proposed areas for each lot comprising the premises?
                                    Current Lot                                                                  Proposed Lot
       Lot on plan description                         Area (m2)                          Lot on plan description                    Area (m2)


   12.2) What is the reason for the boundary realignment?



   13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement? (attach
   schedule if there are more than two easements)

    Existing or proposed?          Width (m)                       Length (m)                     Purpose of the               Identify the land/lot(s)
                                                                                                  easement? (e.g               benefitted by the
                                                                                                  pedestrian access)           easement



Division 3 – Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.


   14.1) What is the nature of the operational work?
        Road work                                          Stormwater                                         Water infrastructure
        Drainage work                                      Earthworks                                         Sewage infrastructure
        Landscaping                                        Signage                                            Clearing vegetation
        Other – please specify:                         Waterway works (jetty)
   14.2) Is the operational work necessary to facilitate the creation of new lots (e.g. subdivision)?
        Yes – specify number of new lots:
        No
   14.3) What is the monetary value of the proposed operational work?(include GST, materials and labour)


                                                                                                                                                 Page 5
                                                                                                        DA Form 1 – Development application details
                                                                                                                  Version 1.3—28 September 2020
Log in to download the original file

2303-33746 DA Form1 Application details_3.pdf · 549 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.