Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2019-04-15 General Committee Agenda

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Page 37 of 63

Noosa Shire Council                                                                      ATTACHMENT 1
       2018/19 Budget Review 3 - Operating Submissions
       For the period ending 30 June
       Function             Details                                                               ati        Expense
       AdditionalRevenueorSavings
      Asset Management    [Salary cost savings from stafftime allocated to capital projects              =   «40,000
     Seenesene            outconesn201)                               eee
                           outcomes in 2018)
      Financial Services  Interest revenue from investments above budget expectations             177,512)
      —                   Lean borrowing costsavings                                                      = RAO
_                         impact of Accounting Standards change for recognition of pre-paid rates = 1,307,750)
                            er ontinied propayment fr 201980
                           over continued prepayment for 2019/20
                        improvement pect       nn       rerne BUSTS erelng      mine assets               aes
                           improvement project
                   _tetteStraag            OTE Sens en eerie                                                ae
                           assets to 2019/20
       —__Rewens GaaryPontPogesion)
                           Reviews (Salary Point Progression)
     Libraries and Galleries [Salary cost savings from stafftime allocated to capital projects |=              0,000.
     Waste Management     Royalty income from gas emissions above budget expectations              18,1384,
                         Sales oftecovered plastic batts from the introduction of Container Refund Scheme | 180,000,
       —__etpetatons MASS For ne Nossanls Vanaiove wetine ange
                           expectations
                         Waste disposal charges at Eumundi Rd Landfil higher than budget expectations | 40,000,
     Series               2020
      Services             to 2019/20
      People and Culture  ‘Saving in labour costs identified from WHS position vacancies       SSS = ~—«20,000
      Civil Operations    Savings from mothballing ofquanry                                SSC = 810,000
       ____umserafprojects tng underaten by Count satraher han eternal sonract
                           number of projects being undertaken by Council staff rather than external contract
     Ceignandoehey                                                                ee |e
       Design and Delivery
            Pes            aayedtmngotiporatewons
                           delayed timing of upgrade works
      ‘Commercial Properties [Reduced lease revenue due to vacancies at Sunrise Beach Shops       *140,000,
      Revenue Services    Interest charges on overdue rates and levies above target budget expectations ——|—=«58,000,
      Building and Plumbing Building and Plumbing Compliance revenue above budget expectations    300,000,
      LocalLaws          (Local Laws Revenue for infingements above budget expectations =| 200,000,
      Cemeteries ___—_(Cemeteries internment burial fees above budget expectations =| (50.000,
      Chief Executive Office [Salary cost savings from vacancy in Executive Officer position   |=             70,000
      Additional Revenue orSavingsTotal —ss—~—<—~sSsSCS «986093. = 3,297,432.
      Emergent Request(unfunded)
      Asset Management    [Development of Shoreline Erosion Management Plan (SEMP)                            (810,000
     TheJ                 Further reduction to lease revenue forrenttoNoosaFM                  =    3085)
       a keremggee                                  comin rerntemen ||
                           and construction materials received at Noosaville Landfill. Product will be available
                           for sale in 2019/20
     Seton        eee mete
                           during 2018/19
   seamen heNoons verano |                                                                                      Oe
                           the Noosa River Plan
                          Commencement of a fiying-fox management subsidy scheme                         |    «10,199
                          Regional coordination ofLandForWidife                                               88
     Engagement                             nee ener Seton ne em
       Engagement
     Governance __Addltional labour costs incurred to cover staff on long term leave absence                   <8, 000
      People and Culture  Additional labour costs incurred to cover staff on ong term eave absence || ~C«74,000

                                                                                                  Page 37 of 63
Log in to download the original file

2019-04-15 General Committee Agenda(PDF, 7MB).pdf · 7.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.