Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2019-04-15 General Committee Agenda

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Page 43 of 63

yan                                                                              Grants External     Woy 1a)  Levy   Other     General       Total
                                                                                             Funds            Reserves Reserves     REEL
Peregian Beach SLS Building RoofReplacement | $176,200] $                                                                                    176,200
 Bicentenial Hall Extension Fire Pump Works SSOS~S~—SCSCSSSSC*dSCSCC*dSCSSSCSC~*dSCSCSCSC*dSCSS CS 100,000] $100,000
 [Community Facilities Minor Works OSO—OOCOCCCCSYSSS™~SSTCdTSCC~dSSSSC*dS «dS 297,500 | $297,500 |
CommunityFacilities Total s—“‘“S*S™S™S™S™C™C™C™C™C™C™C*dSCOCSC‘“‘(SNSNCNC(NSYNN A                                             $4,047,622 | $1,047,622 |
Corporate Buildings
 ‘Tewantin Administration Building -RoofReplacement —SSSCS~SCSCSSSSSSSCSC~*dSCSCSCSC~*iRSC‘“‘(SC*dSCSC*#dSC(TCNCCS 770,000 [$770,000
 Tewantin Admin Building Automatic Transfer Switch              SSC~—“—~s*~s~—‘—s—sé‘iYSC“‘(SCd|SSTTTCYSTTTC*dYSC~‘“‘YSSCSC*«dCS~—=«S97,087 | $47,037
 Noosaville Depot-KitchenRenewal   SS SC—~—“~s*s*s‘“*S*sé*dSC“‘(‘CSNNCCLSNC#dCCOC#(#(#CNNTCC#dCCCCS 30,000 | $30,000
 FTewantin Admin Buiding-Securty Upgrade S—SSCSC‘YSSSSC~iYSTCdrSCSCSC™~idYSSSC*dYSCS «dS                                          75,000 | $75,000
Corporate Buildings Total —C—“‘~*‘“—s*s*‘“‘S™S™S™S™S™SOOOOCOC“‘HNNC((NNNYNNNNN NNN                         || $892,087 | $892,087,
 GravelRoad Network
 [Shire Gravel Resheeting-AnnualProgram SS              SSSCSC~—CSCSCSC—CSSS = | SdSCCdSSSSSC*dYCSSSC«d'                         290,000 $290,000
 Hinterland Gravel Road Upgrade (DonnelysRoad)SSC~—~—SCSS SSC                           C|STCdSTTSC™C~wdSC“‘CSC*LC#«d”éSS:«~«C786,075:'[ $736,075
 GravelRoads Extension Progam                 SSOS~SSSTTTCCTC‘dCS SS CdSSSSdYSSSCSCSC—C                             iY            920,000 $120,000
 Gravel Road Network Total                                                                                                    $1,146,015 | $1,146,015
 HolidayParks                                         OCC                                     CdTC—CiYSS
[Noosaville Noosa River Holiday Park Large Amenities Renewal SSSS~—sSCS~sS~SSCSCdSSSCdYCSSCSC™~dSC‘“‘(S#*‘L |S 675,500                       675,500
 [Noosaville Noosa River Holiday Park SmallAmenities Renewal          SSC~—~iS          |       TTCCSSC*dSS «108,987 | $104,087,
 Noosa North Shore Beachfront Campground Redevelopment           SSS~—“—sS*SsSSCSCSCS*C~*‘iRSC‘“‘(#N’NCSCSS:~«CTONSOD—C*~‘“‘;R;SCS;*CS™*~C*~dC'S~SC~S«dC'S~—~100, 000
 Noosaville Noosa River Holiday Park Road Reseal and V Drain Foreshore Works   SST                            SSCS          «dS   149,000) $149,000
 HolidayParksTotalss—“—*~s*s*s*s‘“‘—*s*s*~‘“‘“‘*~*~<“‘<~‘~s*~‘s*‘“s*s~sSC“‘ ETC*S*LCOC*‘#CS«SNOOWOOOC‘“(LSCSC“‘(‘CSC#CSS «#£S2@,887 | S$ @1,028,887_
 Parks &Playgroundss—“—s*~‘“‘—*s‘“‘“‘“‘“SOC*sC(C*SCULUCUdLULTLTLUdTTTTCUdC
[Noosaville Gympie Terrace Park FumitureRenewal —SSC~—“—~S*S*S*SsS*SsSCSsSCSsYSSSSSSSC*dSSCTCdYSCCCSC~*sdSCSC*~*‘dLCSC(‘SN’CS. 80,000 | $     80,000
 Pomona Jo Bazzo Park BBQ and AssociatedPathwaysSSSC~“—~S*~*~—~—CsSsSCSCSsSSSSCSSCSC~*dSC‘“‘C;*dSOC‘“‘(S’WC‘LTWWNWCCSLC.._ |S      30,000 [$30,000
 Pomona Stan Topper Park -BasketballCourtRenewal                SSC~—“—~*S*~*sSS*SsSSSCTCSTC*dSCSC‘“‘“LSC#CSS’~SC=«S8,000 | $                 38,000
 BotanicGardenShadeHouseSC—“~*~*s*~“‘“‘*S*S*S*S*S*S*~“‘—~‘~wSC“‘CC*LC*#dCOCNC(#*NCOC(#CNS(C#dCS:~S=«#22,6 64'S                                22,664
 [Cooroy Hinterland Priority Playground-Construction ———SSC~—~sSCS~SCSsYSCSCSCSCSCSC~*dSC‘“‘(C™SC#*déS;G4280,OOO|———C*«dLC‘(CS#;#*‘CS «~#£909,83:(§ 310,317)
 Peregian Beach Town Square Upgrade Planning @Design ——SSSSSSOSC~—SSSSYTSCSCS™~C~‘“RSSC‘“‘(S*zYSCCTC*dYSTSCSC*dSCSCSCSC*dCS'~~=«25 00D |S     28,000
 Headland Park PlaygroundRenewal   SS                 SSC~—“—~*S*s*s*sSsSCSsSCSESC CSCTCdSCTC*dSCSCSC~‘“RTC*C#C#dS‘S-~~=C«WOOOO'|'$ 60,000 |
WavecrestPark Shade SailRenewal —SSCS~—~—C—CSCSCSCSSSCSSC*dSCTCdSCCCSC~*dYSCSC*‘dSC(‘SNCC'S. 48,000 $43,000
 [Noosa Heads Pinaroo Park Swing &SoftfallRenewal     SSSCS~—sSCSYSSSSSC*dSCCSCSC*dSC“‘(NCCLCWTTC.CL._ |S                         19,000 [$719,000
 [Sunrise Beach Orient Park North Swing & SoffallRenewal—SCS—~—“—~sS*~SsSCSSCdSSCdTSCdSCdSCSC*dSS «19,000 $                                   19,000
 ‘Sunrise Beach Comet Park Swing & SoffallRenewal          SC~—“—s*S*S*S*S*sSsSsSCsESSSSSCdSSCCSC*dSC‘“‘(N’NCCSTCCC‘C’NCNC#CSS’ ~S_~«C94;000 | $79,000 |
 [Cooran Pioneer Park Upgrade SOC—~—SSSOSOSOCOTCC™~—C|S—~Sr——SS—~sdSSCSC~iYSCSSC«*dS 88,599] S|                                              193,509
Parks &Playgrounds Total —s—s—“‘*~*‘“‘*S*™*™*™:™CCSSC‘CTCSC#*SLCO#CS44250,000(—~*‘CY*C“‘COCNCC(CO#SCSS«S«C«S93,420/ $                        856,580
 Public TransportinfrastructuresCi‘“‘S*™*S*™*rTSC*C*“‘“(SWC*@LWN$N’NCWC’SCNCNSCN($N TOOTS UDC
[Shire Bus Shelter Disabled Compliant Program: Year5SSCSC~<“—~s~*~S~S~S~S HOW               ~——C*~«SYC“‘#SN”’NN’ |_—*i(|_~—S~S~=*«dC S| ~_—(268,000/§ 518,000
Public Transport infrastructure Total, = SC—<“‘“~*S*~*~*~*dS:C«CBOWO]C“(s|CSSCSSC*SSC*C*‘dCS:~«=«6B,OOO|$ 518,000,
Sealed Roads Network:
 WeybaRoadCorridorimprovementsSs—~—<“—~*~s—s—s—s—‘—‘“‘“‘—‘~‘—‘“‘“‘“‘“‘“‘zdSCC~*d(SC*dSCtC*C‘“‘CS*LOC*C*C*dSCOWSC«dSS_—_*477,349, [$177,349
[Peregian Beach, David Low Way GuardralRenewalSSC~—“—~*~*~*sss*sSsSsSCCdSSCTCdSCCSC~idYCSC(‘(#$NSCLNNCN CS                        45,042 [$45,042
[Sunshine Beach Resurfacing Preparation Works SSCS—~—“—~S*S*SsSsYSC“SCSSCdCSCC*dSCCSCSC*d* S| ~_=*185,400/ $185,400 |
                                                                                                                                      Page 43 of 63
Log in to download the original file

2019-04-15 General Committee Agenda(PDF, 7MB).pdf · 7.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.