2019-04-15 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Page 43 of 63
yan Grants External Woy 1a) Levy Other General Total
Funds Reserves Reserves REEL
Peregian Beach SLS Building RoofReplacement | $176,200] $ 176,200
Bicentenial Hall Extension Fire Pump Works SSOS~S~—SCSCSSSSC*dSCSCC*dSCSSSCSC~*dSCSCSCSC*dSCSS CS 100,000] $100,000
[Community Facilities Minor Works OSO—OOCOCCCCSYSSS™~SSTCdTSCC~dSSSSC*dS «dS 297,500 | $297,500 |
CommunityFacilities Total s—“‘“S*S™S™S™S™C™C™C™C™C™C™C*dSCOCSC‘“‘(SNSNCNC(NSYNN A $4,047,622 | $1,047,622 |
Corporate Buildings
‘Tewantin Administration Building -RoofReplacement —SSSCS~SCSCSSSSSSSCSC~*dSCSCSCSC~*iRSC‘“‘(SC*dSCSC*#dSC(TCNCCS 770,000 [$770,000
Tewantin Admin Building Automatic Transfer Switch SSC~—“—~s*~s~—‘—s—sé‘iYSC“‘(SCd|SSTTTCYSTTTC*dYSC~‘“‘YSSCSC*«dCS~—=«S97,087 | $47,037
Noosaville Depot-KitchenRenewal SS SC—~—“~s*s*s‘“*S*sé*dSC“‘(‘CSNNCCLSNC#dCCOC#(#(#CNNTCC#dCCCCS 30,000 | $30,000
FTewantin Admin Buiding-Securty Upgrade S—SSCSC‘YSSSSC~iYSTCdrSCSCSC™~idYSSSC*dYSCS «dS 75,000 | $75,000
Corporate Buildings Total —C—“‘~*‘“—s*s*‘“‘S™S™S™S™S™SOOOOCOC“‘HNNC((NNNYNNNNN NNN || $892,087 | $892,087,
GravelRoad Network
[Shire Gravel Resheeting-AnnualProgram SS SSSCSC~—CSCSCSC—CSSS = | SdSCCdSSSSSC*dYCSSSC«d' 290,000 $290,000
Hinterland Gravel Road Upgrade (DonnelysRoad)SSC~—~—SCSS SSC C|STCdSTTSC™C~wdSC“‘CSC*LC#«d”éSS:«~«C786,075:'[ $736,075
GravelRoads Extension Progam SSOS~SSSTTTCCTC‘dCS SS CdSSSSdYSSSCSCSC—C iY 920,000 $120,000
Gravel Road Network Total $1,146,015 | $1,146,015
HolidayParks OCC CdTC—CiYSS
[Noosaville Noosa River Holiday Park Large Amenities Renewal SSSS~—sSCS~sS~SSCSCdSSSCdYCSSCSC™~dSC‘“‘(S#*‘L |S 675,500 675,500
[Noosaville Noosa River Holiday Park SmallAmenities Renewal SSC~—~iS | TTCCSSC*dSS «108,987 | $104,087,
Noosa North Shore Beachfront Campground Redevelopment SSS~—“—sS*SsSSCSCSCS*C~*‘iRSC‘“‘(#N’NCSCSS:~«CTONSOD—C*~‘“‘;R;SCS;*CS™*~C*~dC'S~SC~S«dC'S~—~100, 000
Noosaville Noosa River Holiday Park Road Reseal and V Drain Foreshore Works SST SSCS «dS 149,000) $149,000
HolidayParksTotalss—“—*~s*s*s*s‘“‘—*s*s*~‘“‘“‘*~*~<“‘<~‘~s*~‘s*‘“s*s~sSC“‘ ETC*S*LCOC*‘#CS«SNOOWOOOC‘“(LSCSC“‘(‘CSC#CSS «#£S2@,887 | S$ @1,028,887_
Parks &Playgroundss—“—s*~‘“‘—*s‘“‘“‘“‘“SOC*sC(C*SCULUCUdLULTLTLUdTTTTCUdC
[Noosaville Gympie Terrace Park FumitureRenewal —SSC~—“—~S*S*S*SsS*SsSCSsSCSsYSSSSSSSC*dSSCTCdYSCCCSC~*sdSCSC*~*‘dLCSC(‘SN’CS. 80,000 | $ 80,000
Pomona Jo Bazzo Park BBQ and AssociatedPathwaysSSSC~“—~S*~*~—~—CsSsSCSCSsSSSSCSSCSC~*dSC‘“‘C;*dSOC‘“‘(S’WC‘LTWWNWCCSLC.._ |S 30,000 [$30,000
Pomona Stan Topper Park -BasketballCourtRenewal SSC~—“—~*S*~*sSS*SsSSSCTCSTC*dSCSC‘“‘“LSC#CSS’~SC=«S8,000 | $ 38,000
BotanicGardenShadeHouseSC—“~*~*s*~“‘“‘*S*S*S*S*S*S*~“‘—~‘~wSC“‘CC*LC*#dCOCNC(#*NCOC(#CNS(C#dCS:~S=«#22,6 64'S 22,664
[Cooroy Hinterland Priority Playground-Construction ———SSC~—~sSCS~SCSsYSCSCSCSCSCSC~*dSC‘“‘(C™SC#*déS;G4280,OOO|———C*«dLC‘(CS#;#*‘CS «~#£909,83:(§ 310,317)
Peregian Beach Town Square Upgrade Planning @Design ——SSSSSSOSC~—SSSSYTSCSCS™~C~‘“RSSC‘“‘(S*zYSCCTC*dYSTSCSC*dSCSCSCSC*dCS'~~=«25 00D |S 28,000
Headland Park PlaygroundRenewal SS SSC~—“—~*S*s*s*sSsSCSsSCSESC CSCTCdSCTC*dSCSCSC~‘“RTC*C#C#dS‘S-~~=C«WOOOO'|'$ 60,000 |
WavecrestPark Shade SailRenewal —SSCS~—~—C—CSCSCSCSSSCSSC*dSCTCdSCCCSC~*dYSCSC*‘dSC(‘SNCC'S. 48,000 $43,000
[Noosa Heads Pinaroo Park Swing &SoftfallRenewal SSSCS~—sSCSYSSSSSC*dSCCSCSC*dSC“‘(NCCLCWTTC.CL._ |S 19,000 [$719,000
[Sunrise Beach Orient Park North Swing & SoffallRenewal—SCS—~—“—~sS*~SsSCSSCdSSCdTSCdSCdSCSC*dSS «19,000 $ 19,000
‘Sunrise Beach Comet Park Swing & SoffallRenewal SC~—“—s*S*S*S*S*sSsSsSCsESSSSSCdSSCCSC*dSC‘“‘(N’NCCSTCCC‘C’NCNC#CSS’ ~S_~«C94;000 | $79,000 |
[Cooran Pioneer Park Upgrade SOC—~—SSSOSOSOCOTCC™~—C|S—~Sr——SS—~sdSSCSC~iYSCSSC«*dS 88,599] S| 193,509
Parks &Playgrounds Total —s—s—“‘*~*‘“‘*S*™*™*™:™CCSSC‘CTCSC#*SLCO#CS44250,000(—~*‘CY*C“‘COCNCC(CO#SCSS«S«C«S93,420/ $ 856,580
Public TransportinfrastructuresCi‘“‘S*™*S*™*rTSC*C*“‘“(SWC*@LWN$N’NCWC’SCNCNSCN($N TOOTS UDC
[Shire Bus Shelter Disabled Compliant Program: Year5SSCSC~<“—~s~*~S~S~S~S HOW ~——C*~«SYC“‘#SN”’NN’ |_—*i(|_~—S~S~=*«dC S| ~_—(268,000/§ 518,000
Public Transport infrastructure Total, = SC—<“‘“~*S*~*~*~*dS:C«CBOWO]C“(s|CSSCSSC*SSC*C*‘dCS:~«=«6B,OOO|$ 518,000,
Sealed Roads Network:
WeybaRoadCorridorimprovementsSs—~—<“—~*~s—s—s—s—‘—‘“‘“‘—‘~‘—‘“‘“‘“‘“‘“‘zdSCC~*d(SC*dSCtC*C‘“‘CS*LOC*C*C*dSCOWSC«dSS_—_*477,349, [$177,349
[Peregian Beach, David Low Way GuardralRenewalSSC~—“—~*~*~*sss*sSsSsSCCdSSCTCdSCCSC~idYCSC(‘(#$NSCLNNCN CS 45,042 [$45,042
[Sunshine Beach Resurfacing Preparation Works SSCS—~—“—~S*S*SsSsYSC“SCSSCdCSCC*dSCCSCSC*d* S| ~_=*185,400/ $185,400 |
Page 43 of 63See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.