2019-04-15 General Committee Agenda

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Page 45 of 63

yan)                                                                             Grants External    Loans      TYG    Other     General      Total
                                                                                             Funds           Reserves Reserves      es
 Noosa Heads, Park Road Boardwalk Construction |S 6820 $                                                                                     66,820,
Pathway renewalatGympieTeraceSS~—“—~sSs~sSsSSESSSC*dSCCSC*dSC‘(NC*dCCSC*dSCNWCSC*CdSS.~_—~25,000 | $25,000
 Noosa Heads Park Road Boardwalk Renewal Construction —=—=S=~—~S~SSC—CSC‘CS~‘TSC“<*;‘TS~‘(YSSC‘(‘C‘(S*rLC(CCC#déS:«1BO,678'['$ 4,130,678,
 Noosa Heads Main Beach Trunk Pathway Upgrade Link from Surf Club to Park Road (90m)———s| S| S|              SSC*dCCSCSCSC*dCS «269,057 | S$ 260,087 |
 (Corey Maple Street Raised PedestrianCrossng SS—~—“~*~*s*s~‘“‘“‘*S*S*S*S*Sé~iESC“‘(‘®CNSNNCCNNWWW.CCLSCOCd*COCC#«dCCWC#dSS’~S=«S,000 [$75,000 |
 Jacaranda Park, Tewantin-PathwayRenewal SSSCS~—sSCSsSSSESSSSCSC*dSCC‘C*‘dLTSCWN’NN NT S__88,000 | $55,000
 Wallace Park Pathway Stage5&6                 SOC—~—“—s~s~—‘“Cssss—‘“‘—sSss—C—sssssSsSSTC YT SS™S~SrS SCSC~‘dYSC‘(NC*TCCC*dTSC*SS 63,000 $63,000
PoincianaSharedPathwayStage3     SS SSCS~—“—~s*s~s~s—sC—‘—‘—ssSsSssSsSsSSCSCSSCSC*idRSC‘“‘(WN’NCdLTSCC*dSCCSCCdSSCSCSC*dSS 27,000 | $27,000
 Tewantin, Hilton Terrace CNLGGP SharedPathwaySSS™~—SsSSSSCSOTCCTS~C~S SS~CSdSCSC<CS*é‘CS;~*™YSCSCSCS~C~S                  ~*~ 220,000 | $220,000
Pathways &Boardwaks Total —ssi“‘C™SCS;*#*#*#*#*#*#*#*#*™*™*~*~*~*~*~*~*dS:«C«‘SSBB||SSSCdSCSCSC*«d*S:«ODATB |S 6,079,619
PublicAmenities SC—“~*~s*s*s‘“‘*s*s*~‘“‘“‘“S™S™S™SCOC#*dC(NNNNCNCOOC‘<CNCNCOC(’Y)N.COC*dC(CULOOC*édCLC( ‘N$NNSCWN
Peregian Beach Public Amenities RenewalConsirucon——SSSS~—tssSS'S SSC (dT SCT SSSSSSC*dSSSSSCidSSSC«d S$ ~_—‘70;,000 | $70,000
Public Amenities Total                                                                                                        gs  20,000 §   70,000
 Other Capital                                                                 $   430,500         $ 1,125,000                $ 3,375,026 $ 4,930,526
AssetManagement
Shire CCTV Drainage program SSC—~—“—~sSCYSSC*dSSCCdTC*dYCS Cd                                                                 $100,000 | $700,000 |
 ‘Technology One Asset Systems Mobilty RolloutandHardwareSSSS~“~*~*~*~*~**~~‘“‘—s~stsYSSC“‘CSC*SYTWCOC#d.COWC#‘#N’NNSCLWT...CL.__| $80,000 [$50,000
Zero Emissions priorty minorprojects—SSCSC~—“—~sSCSYSSSSSC~iSSCSCSdSSSC~sSCSSCSCSC~idSCSCSCSC*dSSSCC«, 90 $21,302
Zero Emissions Noosa Project implementation ——SSSSS™~—SsSSSC‘LSSSCSdYSCSC~*idYSC“(t;™SC~*dYSC*~‘;‘;*é*dSSC‘C;‘drS;~«C«CS T/A ['S             514,215 |
 Shire Pavement Management System Road Surface Condion Modeling —SSSSC«d|SSSCSC*~é‘RSC‘“‘(‘N#’CS*CLWWCCCCL. |S «40,000 $                     40,000,
 Tewantin Administration Building AirHandiing Unitreplaceme——SSSS~=~—sS~SSSSSCS™SC*~‘“‘YSC“‘YCOCiYSt~‘“C~*drSSC“‘C;‘iSCOCC«C*d'S'SC'~‘ SCS
 AssetManagementTotal —sC—<“‘s*‘“‘*s*s‘“‘“‘*‘*‘;*é‘~*dSSC‘ ESSSOOCCdCTTUTTCdSCCC*dSS 785A | $728,517
 (Council Fleet and Plant Replacement Progam                    SCS~<“—~*~S~S SOOO] || S| SCS 9,825,241 | $1,840,241 |
Fleet-PiantReplacementTotal        ss ss—~<“*‘*s*s‘“‘~*S*S*S*S*~*~™~SSC‘iSCOC(tisSSSC*CdSC(;‘“‘C’:#CSS «#825201 $ 1,840,207
 InformationTechnologyss—‘“‘“‘CS™*S*™*™*™*™~™C™C~*rSC‘“‘(RSNNCWC‘‘C#N’NNSCNC’CNNSCUNNN’. ‘ss                                        COC
 Technology One Cl Anywhere Systems Implementation - Property and Rating, ProcuretoPay | =| SST SSCTSSSCSCSSCSC*~«diCSSC«BSTA |S A78OTT
ICT Hardware -Network Switch Replacement SSC—~—“—SsSSCSYTSSSC~dSC~C~idTSCSSSC~dSSSSC*d CS                                   «* $370,000 | $370,000 |
Information TechnologyTotl = ss—“~*~*s‘“‘*S*~*~‘“‘“~;*é*sSC‘“‘(CSSNCC*CSC“‘(#NNSLSCOC(‘(NNNC*SSCOC*C*C‘C‘CLSC#C#dSS «8484374.                848,377
 PlanningSchemesS—s—“—SsSsSC‘“s~‘“‘*‘“‘“‘“‘S*S™SSCC*iTLCOC*‘“SNT.'TOTCdLC( (NNN CN                                  —id(YS             rd
 Noosa River Bathymetty Suey SSC—~—“—SCSCSCSCSYSSCSCSSSC*dSC‘C*dCSS':«CCOD| | SC*dS CRS (5G
 Shire Project Team Resources forNew Planning Scheme             SSs~*~—“~*~*~*s*sésdSC“‘(S’NSC#CSCSC*#dS| «06,000 —S—=‘<LS(ssSC*dLSCSSSCSC*dS~_—«76,O00
Shire Planning Scheme Consuttancy——SSS~—“—SsSsSSSSSSSC*«dSCSCSCSC~*«dCSC4HOOD| || SCS 214,000,
 [Shire Planning Scheme Climate Change Adaptation ———SSCSC~“~*~*~*~*~*~*~*~*~dS«CTBBOO|—SC«S «80,000               | SS«'S        98,676 |$ 979,824 |
 NoosaRiverHydraulioModel—SOC~—“—sSCSCSSSSCSSCSC‘iRNNNNYNNN dT                                                     dC*dS          84,910 $34,970 |
Shire Project Team Materials & Services SSOS~“—~sS*S*~*S**S*sC“C—sS~—~“CSsSSsSYTSC“‘C;SNW YL.         SOOO       SC~*dYSC‘“‘SNC#CN;SCWOCCCdSS’~«28,000"
Stormwater Backflow Climate Change Vulnerabiliy Assessment               SSCS                             TCS               «*(S  40,000 $40,000 |
PlanningScheme Total ——CSCCdCCS;:—=«*ASSOO| «| $4,925,000|                                                          |      i$     24,103 | $1,516,997
 Grand Total                                                                   $ 3,375,316         $ 2,475,000 $ 14,300       $ 22,526,042 $28,390,657
                                                                                                                                    Page 45 of 63
Log in to download the original file

2019-04-15 General Committee Agenda(PDF, 7MB).pdf · 7.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.