Original source · versioned page text
Appendix 4 - Engineering Report (00012423)
Attached to the e-mail MCU15/0053 Application - 30-32 Doonella Street Tewantin (3 email of of 3) - Engineering Report.
Unit Development 30-32 Doonella Street, Tewantin T the road level at this location is approximately RL 4.0, so the drain invert is approximately RL 3.0. This is low enough to enable a basement car park at RL 4.6 (as shown on building concept plan) to be drained by a gravity stormwater system to this pit. Note that we recommend that survey be undertaken to confirm the above drainage and pavement levels. Please refer to the attached marked up aerial photo showing the above details. 4. STORMWATER MANAGEMENT Please refer to the attached report from Aquaintel which provides preliminary sizing of bioretention areas and detention volumes. Prepared by Doug Reynolds RPEQ 9072 Tod Consulting Pty Ltd 9 June 2015 J/N 13672 June 2015 Rev C Page 2 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix 4 - Engineering Report (00012423).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.