Council archive · source document
APPENDIX A - Revised Plans · MCU16/0084
Attached to the e-mail MCU16/0084.01 - Generally in Accordance Request.
Plans and drawings: the text below has words only, no drawings.
Original PDF page 2, section 1. The text section number identifies this passage in the reader.
A B C D
10240 17100 8000
Telephone +61 7 3840 9999
610 12656 3799 4201 [email protected]
O/H 128 Robertson Street
MFC Fortitude Valley
DP Qld 4006 Australia
1232
A
O/H
LINE OF BUILDING UNDERNEATH thomsonadsett.com
ROOF OVER OUTLINE DASHED
1
© Copyright
These drawings and designs and the copyright
therof are the property of Thomson Adsett Pty
Ltd and must not be used, retained or copied
MFC
without written permission of Thomson Adsett
5630
Pty Ltd. ABN 76 105 314 654 Trading as
MFC
ThomsonAdsett. Dimensions take precedence
over scaling. Do not measure off drawings as
print sizes may vary
MFC-C DP
2 2
NOOSA ENERGY
983
COL
ST-BR
COL CENTRE
SHELL CANOPY "PECTEN "
A-210 SIGN ( SUPPLY AND INSTALL
7500
5 7500
2 BY NOM SUBCONTRACTOR)
OPD
A-301 2 140-142 EUMUNDI - NOOSA ROAD,
A-131 NOOSAVILLE, QLD 4566
MFC
LINE OF BOWSER UNDERNEATH
ST-BR
COL
3 3
MBG-A
for
3.00°
DENMAC NOMINEES PTY LTD AND
HUTCHINSON BUILDERS
MRS-D MRS-D
MFC-C
ST-BR 1.50° 1.50°
OPD
10690
39926
MFC
MRS-D
LINE OF BOWSER UNDERNEATH
3.00° 3.00°
SIZE BY HYDRAULIC
ENGINEER. REFER TO
PROVISIONAL AREA REINFORCED HYDRAULIC ENGINEERS
A-210 4 FOR SOLAR PANELS. REFER TO DRAWINGS FOR DETAILS
LINE OF BUILDING UNDERNEATH
1 ELECTRICAL ENGINEERS AND
ST-BR
17890
A-301 STRUCTURAL ENGINEERS
MBG-A
32000
DRAWINGS FOR DETAILS MRS-F MRS-F
MBG-A
MFC DP
OPD
MFC
2425 LINE OF BOWSER UNDERNEATH
O/H
2 ROOF PLAN - LOWER GROUND AWNING EG
A-131
1 : 100
4
O/H
610
4 01/03/2017 ROOF FLIP COORDINATION TA
MFC 3 08/02/2017 PROGRESS ISSUE 3 LM
2 27/01/2017 PROGRESS ISSUE 2 LM
1 20/01/2017 INTIAL ISSUE 1 LM
DP rev date details init.
C:\Users\changt\Documents\16.0122.17 NOOSA ENERGY CENTRE_CENTRAL_changt.rvt
LINE OF BUILDING
OPD
LEGEND UNDERNEATH
ROOF ACCESS POSITION drawn date
7592
7674
COL COLUMN LM 18/01/2016
MFC
MFC
DP DOWNPIPE - REFER TO HYDR'S ENG'S DETAILS LINE OF BOWSER UNDERNEATH checked date
FOR SIZE
FALL ARREST SYSTEM TO BE Checker
EG EAVES GUTTER DETAILED BY OTHERS
Refer to hydr’s eng’s details for size verified date
MBG-A BOX GUTTER - TYPE A Refer to hydr eng’s dwgs
MFC METAL FASCIA CAPPING
DP
MFC-C METAL FASCIA CAPPING - TYPE C scale
371
290
MFC
MRS-D METAL ROOF SHEETING
Lysaght Klip-lok 700 Hi- Strength Colorbond 0 1.0 2 3 5m
Surfmist.
MRS-F METAL ROOF SHEETING 610 6888 3352 2416
Lysaght Klip-lok 700 0.48 BMT Zincalume.
O/H
OPD OVERFLOW PIPE
ST-BR STEEL BRACING ROD ROOF PLAN - BUILDING AND
ROOF PLAN - BUILDING AND CANOPY CANOPY
PRELIMINARY
1 1 : 100 @A1
scale project no.
1/03/2017 10:55:59 AM
1 : 100 16.0122.17
sheet no. revision
A-131 4
original sheet size - A1 (594mm x 841mm)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
APPENDIX A - Revised Plans.pdfRelated documentApplication case desk ↗
APPENDIX A - Revised Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.