Council archive · source document
APPENDIX A - Revised Plans · MCU16/0084
Attached to the e-mail MCU16/0084.01 - Generally in Accordance Request.
Plans and drawings: the text below has words only, no drawings.
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
E D C B A
10040 8000 17100 10240
EVSE LLC'S 3704 AUTOCOIL LEVEL 2 380 380
ELECTRIC CHARGE STATION. REFER TO 10 2400 10 2400 10 2400 10
MANUFACTURERS SPECIFICATIONS FOR Telephone +61 7 3840 9999
[email protected]
128 Robertson Street
Fortitude Valley
LT_42 PT_04 PT_02 PT_03 Qld 4006 Australia
thomsonadsett.com
850
S-03 MRS-D © Copyright
COL EG
MFC
3.00°
ROOF These drawings and designs and the copyright
therof are the property of Thomson Adsett Pty
FOR DETAILS ON BOWSERS MFC 14850 Ltd and must not be used, retained or copied
PLEASE REFER TO DRAWING '4 without written permission of Thomson Adsett
TOLL GATE CANOPY - PLAN AND LT_23 DP Pty Ltd. ABN 76 105 314 654 Trading as
ThomsonAdsett. Dimensions take precedence
DETAILS' REVISION C over scaling. Do not measure off drawings as
4350
LT_53 print sizes may vary
BOLL PT_07
BOLL-A
GROUND FLOOR
MFC-C
10500 NOOSA ENERGY
CENTRE
COL
5650
140-142 EUMUNDI - NOOSA ROAD,
NOOSAVILLE, QLD 4566
PARKING LEVEL
2 BUILDING AND CANOPY NORTH ELEVATION 4850
A-102
1 : 100 for
LEGEND
DENMAC NOMINEES PTY LTD AND
BOLL BOLLARD HUTCHINSON BUILDERS
4 3 2 1 BOLL-A BOLLARD - TYPE A
COL COLUMN
17890 7500 5630 DP DOWNPIPE - REFER TO HYDR'S ENG'S DETAILS
353 FOR SIZE
300 10 2400 10 2400 10 2400 10 2400 10 2400 10 2400 10 2400 10 2400 10 2400 10 2400 10 2400 10 2400 10 2117 300 EG EAVES GUTTER
Refer to hydr’s eng’s details for size
?
LT_23 FIBRE CEMENT 9mm SHEETING ON 40mm
TOPHATS
S-03 LT_42 ALPOLIC - WHITE ON 35mm FURRING CHANNEL
PT_03 PT_04 PT_02 LT_42 LT_53 ALUMINIUM COMPOSITE PANEL ON 40mm
FURRING CHANNELS
MFC METAL FASCIA CAPPING
850
MFC-C METAL FASCIA CAPPING - TYPE C
ROOF MRS-D METAL ROOF SHEETING
FOR DETAILS ON BOWSERS 14850 Lysaght Klip-lok 700 Hi- Strength Colorbond
PLEASE REFER TO DRAWING '4 Surfmist.
TOLL GATE CANOPY - PLAN AND
DETAILS' REVISION C
4900
GROUND FLOOR
10500
1 CANOPY EAST ELEVATION
A-102
1 : 100
5 01/03/2017 ROOF FLIP COORDINATION TA
1 2 3 4 4
3
21/02/2017
08/02/2017
ELEVATION PRELIM ISSUE
PROGRESS ISSUE 3
TA
LM
2 27/01/2017 PROGRESS ISSUE 2 LM
5630 7500 17890 1 20/01/2017 INTIAL ISSUE 1 LM
rev date details init.
C:\Users\changt\Documents\16.0122.17 NOOSA ENERGY CENTRE_CENTRAL_changt.rvt
363
300 2117 10 2400 10 2400 10 2400 10 2400 10 2400 10 2400 10 2400 10 2400 10 2400 10 2400 10 2400 10 2390 10 300
drawn date
LM 18/01/2016
checked date
PT_04 PT_03 PT_02 LT_42 Checker
verified date
850
ROOF scale
14850
0 1.0 2 3 5m
FOR DETAILS ON BOWSERS
PLEASE REFER TO DRAWING '4
4900
TOLL GATE CANOPY - PLAN AND
DETAILS' REVISION C
COMPLETE ELEVATIONS -
GROUND FLOOR
SHEET 2
PRELIMINARY
10500
scale project no.
1/03/2017 10:56:53 AM
3 CANOPY SOUTH ELEVATION 1 : 100 16.0122.17
A-102
1 : 100 sheet no. revision
A-202 5
original sheet size - A1 (594mm x 841mm)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
APPENDIX A - Revised Plans.pdfRelated documentApplication case desk ↗
APPENDIX A - Revised Plans.pdfRelated documentApplication case desk ↗
About this file