Original source · versioned page text
MCU18.0166 - Response to Information Request
Attached to the e-mail MCU18/0166 - Response to Information Request.
The original of this document is very large (15.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Figure 3: Cross section of viewpoint 1a
It is noted that Figure 7.12 was incorrectly labelled as Figure 7.11 in the development application. A Google
Earth image orientated towards the facility from Arthys Road is provided in Figure 4.
Indicative location of proposed facility
Figure 4: View west from Arthys Road, adjacent to driveway of 215 Arthys Road.
IRIS Consulting concluded in their desktop analysis that the monopole may be glimpsed from several rural
properties in locally elevated locations. Views to the proposal site area when viewed from Arthys Road are
obstructed by roadside vegetation. Similarly, views of the proposal site from properties located west of
Arthys Road will be obstructed by vegetation located along intervening ridgelines and by vegetation located
immediately east of the facility. It is anticipated that the visual impact of the proposed facility when viewed
Arthys Road will be minor adverse. Further information is provided within Section 6.6.5 of the VIAR.
3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.