7. Mitigation measures
This section addresses the mitigation measures
developed to avoid, reduce and manage the
identified potential adverse operational and
construction visual impacts.
Mitigation measures during construction:
• All works equipment and materials would be
contained within designated boundaries of
the worksite.
• Trees outside the construction footprint
would be retained and protected during
construction in accordance with AS4970
Protection of trees on development sites
• Stockpiles, waste, and vehicle parking would
be located within the site and set back from
Tablelands Road.
Mitigation measures during operation:
• The monopole and all attachments would
be treated with a non-reflective finish
• The tower would be painted a bushland
green colour, such as Colourbond© Pale
Eucalypt, which blends into the vegetated
background.
IRIS Visual Planning + Design Page 42
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.