2021-01-18 GC - Item 3 - Attachment 2 - Phase 7 Project Summary Coastal Hazards Adaptation Plan

of 98

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                         General Committee Agenda
                                   18 January 2021
                             Attachment 2 to Item 3




Noosa Shire Council Coastal
Hazard Adaptation Plan: Project
Summary
Date: December 2020
Log in to download the original file

2021-01-18 GC - Item 3 - Attachment 2 - Phase 7 Project Summary Coastal Hazards Adaptation Plan(PDF, 7MB).pdf · 7.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of sections 2 to 62 (of 98)

Section 2

Document Control Sheet
                                                          Document:                   R.B22613.005.02.Phase 7.docx
   BMT Commercial Australia Pty Ltd
   Level 8, 200 Creek Street                              Title:                      Noosa Shire Council Coastal Hazard
   Brisbane Qld 4000                                                                  Adaptation Plan: Project Summary
   Australia
   PO Box 203, Spring Hill 4004                           Project Manager:            Lisa McKinnon

   Tel: +61 7 3831 6744                                   Author:                     Lisa McKinnon
   Fax: + 61 7 3832 3627
                                                          Client:                     Noosa Shire Council
   ABN 54 010 830 421
                                                          Client Contact:             Grant Hinner
   www.bmt.org
                                                          Client Reference:

   Synopsis:

REVISION/CHECKING HISTORY
   Revision Number              Date                       Checked by                                   Issued by
   0                            24 June 2020               KOJ                                          LCM
   1                            4 August 2020
   2                            11 August 2020

DISTRIBUTION
   Destination                                                                        Revision
                                            0         1        2        3         4        5        6         7        8        9       10
   Noosa Shire Council                  Word       PDF       PDF
   BMT File                             Word       PDF       PDF
   BMT Library                                     PDF       PDF


Copyright and non-disclosure notice
The contents and layout of this report are subject to copyright owned by BMT Commercial Australia Pty Ltd (BMT CA) save to the extent
that copyright has been legally assigned by us to another party or is used by BMT CA under licence. To the extent that we own the
copyright in this report, it may not be copied or used without our prior written agreement for any purpose other than the purpose
indicated in this report.
The methodology (if any) contained in this report is provided to you in confidence and must not be disclosed or copied to third parties
without the prior written agreement of BMT CA. Disclosure of that information may constitute an actionable breach of confidence or may
otherwise prejudice our commercial interests. Any third party who obtains access to this report by any means will, in any event, be
subject to the Third Party Disclaimer set out below.
Third Party Disclaimer
Any disclosure of this report to a third party is subject to this disclaimer. The report was prepared by BMT CA at the instruction of, and
for use by, our client named on this Document Control Sheet. It does not in any way constitute advice to any third party who is able to
access it by any means. BMT CA excludes to the fullest extent lawfully permitted all liability whatsoever for any loss or damage
howsoever arising from reliance on the contents of this report.
Commercial terms
BMT requests the ability to discuss and negotiate in good faith the terms and conditions of the proposed terms of engagement, to
facilitate successful project outcomes, to adequately protect both parties and to accord with normal contracting practice for
engagements of this type.

Section 3

 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                         i
 Executive Summary




Executive Summary
To help the Noosa Shire adapt to potential effects of climate change over time, Noosa Council is responding
to potential climate change risks by undertaking a multi-year project to develop a Climate Change Adaptation
Plan (CCAP) to build adaptive capacity within Council and across the community.

The coastal hazards component of the CCAP will be informed by the development of a Coastal Hazards
Adaptation Plan (CHAP). The CHAP is funded by a grant agreement with the Local Government Association
of Queensland (LGAQ), under the Queensland Department of Environment and Science (DES) QCoast2100
initiative.

This report provides a summary of the outcomes of Phases 2-7, for which BMT have responsibility.

Work on the CHAP commenced in April 2017, and has progressed over that time in stages, with input from
community consultation and Council staff at critical points as technical studies were progressed.

The methodology for each phase has closely followed the guidance provided within the MS & G which sets
out minimum standards to be achieved by each Council. A separate technical report has been produced and
approved by Council and LGAQ at the end of each phase.

Noosa faces impacts from a range of coastal hazards, particularly towards the latter half of the century. In
some locations hazards are being experienced in such a way as to already represent a material risk. A risk
assessment identified that without mitigation, increased coastal erosion is likely for the open coast region,
having a high impact particularly on privately-owned assets, as well as Council coastal infrastructure (e.g.
roads and recreational areas) and the beaches themselves. Areas along the Noosa River (Noosa Heads,
Tewantin, and in particular Noosaville and Noosa North Shore) will be increasingly at risk due to inundation
associated with rising sea levels. In this instance, the greatest level of exposure and impacts are expected to
be felt by Council infrastructure (e.g. stormwater networks, open space, roads), some private property, as well
as indirect consequences for adjacent retail and commercial operations.

The feedback received during public consultation throughout the project thus far has been for Council to focus
on less intrusive solutions to minimising these potential risks such as nature-based solutions (i.e. beach
management and dune augmentation) on the open coast, rather than hard (less reversible) interventions such
as seawalls. This was borne out by both the options assessment (Phase 6) and more detailed Cost-Benefit
Analysis (Phase 7), particularly for the open coast areas which favoured ‘lighter touch’ options. For areas
subject to inundation hazards, in built-up areas with significant public assets, levees and infrastructure
upgrades are preferred over the long term. The study also found that planning controls may also be used to
support nature-based solutions, and thus could be included in a suite of complementary measures that are
consistent with the feedback received.

A summary of the recommended coastal hazard mitigation measures for consideration in the Coastal Hazards
Adaptation Plan is provided below.

Section 4

Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                 ii
Executive Summary




Locality               Recommended Adaptation Options              Recommended Adaptation Hierarchy
                                                                   Approach
Peregian to            Active dune and habitat management          Accommodate (short term)
Sunshine Beaches       Manual creek mouth management               Planned transition (long term)
                       Community infrastructure management
                       Land buy back
                       Relocate important infrastructure
                       Beach nourishment
                       Dune augmentation
Noosa Heads            Design of hazard resilient infrastructure   Accommodate
                       Tide flaps and valves on stormwater
                       pipe network
                       Active dune and habitat management
                       Dune augmentation
                       Improve sand shifter efficiency
Teewah                 Active dune and habitat management          Accommodate
                       Acquisition of properties affected by
                       coastal erosion in 2070, and conversion
                       of affected properties to public open
                       spaces
                       Beach nourishment
                       Dune augmentation
Noosaville             Design of hazard resilient infrastructure   Accommodate
                       Tide flaps and valves on stormwater
                       pipe network
                       Raising road levels
                       Levees
Tewantin               Design of hazard resilient infrastructure   Prepare/Accommodate
                       Tide flaps and valves on stormwater
                       pipe network
Noosa North Shore      Design of hazard resilient infrastructure   Avoid/Prepare
                       Reduce intensity of future development
Lake Cootharaba        Design of hazard resilient infrastructure   Prepare
                       Relocate important infrastructure
                       Land management to support habitat
                       migration

Section 5

Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary   iii
Contents




Contents
Executive Summary                                                           i
1    Introduction                                                       1
     1.1   Noosa Council Climate Change Adaptation Plan                 1
     1.2   QCoast2100 Program                                           1
2    Methodology                                                        3
     2.1   Consultation                                                 3
           2.1.1     Risk Workshops, 2017                               3
           2.1.2     Community Pop Ups and Questionnaires, 2017         3
           2.1.3     Adaptation Workshop, 2018                          3
     2.2   Technical studies                                            4
           2.2.1     Phase 2: Scoping                                   4
           2.2.2     Phase 3: Hazard Mapping                            4
           2.2.2.1   Storm Tide                                         5
           2.2.2.2   Erosion Prone Areas                                5
           2.2.2.3   Permanent Sea Level Rise                           6
           2.2.3     Phase 4: Asset Prioritisation                      7
           2.2.4     Phase 5: Risk Assessment                           8
           2.2.5     Phase 6: Options Assessment                      13
           2.2.6     Phase 7: Socioeconomic Appraisal                 14
           2.2.6.1   Eastern Beaches                                  16
           2.2.6.2   Noosaville                                       16
3    Findings                                                         17
     3.1   Phase 2: Scoping                                           17
           3.1.1     Setting the Scope                                17
           3.1.1.1   Sea Level Rise                                   17
           3.1.1.2   Storm Tide Hazard                                17
           3.1.1.3   Erosion Prone Areas                              17
           3.1.2     Preliminary Risk Screening                       17
           3.1.3     Gap Analysis                                     18
     3.2   Phase 3: Hazard Mapping                                    18
           3.2.1     Erosion Hazard Areas                             18
           3.2.2     Permanent Sea Level Rise                         19
     3.3   Phase 4: Asset Prioritisation                              19
     3.4   Phase 5: Risk Assessment                                   19

Section 6

 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                          iv
 Contents




             3.4.1     Open Coast                                                              19
             3.4.2     Noosa Heads                                                             20
             3.4.3     Noosaville                                                              21
             3.4.4     Tewantin                                                                23
             3.4.5     Noosa North Shore                                                       23
             3.4.6     Lake Weyba and Surrounds                                                24
             3.4.7     Lake Cooribah, Lake Cootharaba and Surrounds                            24
             3.4.8     Summary                                                                 24
      3.5    Phase 6: Options Assessment                                                       26
             3.5.1     Eastern Beaches (Peregian to Sunshine Beach)                            26
             3.5.2     Teewah                                                                  27
             3.5.3     Noosa Heads (Erosion)                                                   27
             3.5.4     Noosa Heads (Inundation)                                                27
             3.5.5     Noosaville                                                              28
             3.5.6     Tewantin                                                                28
             3.5.7     Noosa North Shore                                                       28
             3.5.8     Lake Cootharaba                                                         29
             3.5.9     Summary                                                                 29
      3.6    Phase 7: Socio-economic Appraisal                                                 30
             3.6.1     Open Coast Locations                                                    30
             3.6.2     Noosaville                                                              31
4     Conclusions and Recommendations                                                         32
      4.1    Additional considerations                                                         33
Appendix A           Hazard Mapping                                                           A-1
Appendix B           Detailed Risk Assessment                                                 B-1

List of Figures
Figure 1-1      QCoast2100 Phases                                                               2
Figure 2-1      Hierarchy of preferred coastal management responses for areas vulnerable to
                coastal hazards (Noosa Environment Strategy 2019)                              13
Figure 2-2      Conceptual CBA Model for open beaches                                          15
Figure 2-3      Conceptual Model for Noosaville CBA                                            16
Figure 3-1      Open Beaches Net Present Value (Source: Aither Economics, 2020)                31

Section 7

 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                          v
 Contents




List of Tables
Table 2-1      Summary of CHAP Storm Tide Hazard Mapping Approach                              5
Table 2-2      Permanent inundation due to Sea Level Rise mapping assumptions                  7
Table 2-3      Hazard Scenarios assessed                                                       8
Table 2-4      Likelihood Criteria                                                             9
Table 2-5      Consequence Criteria                                                           10
Table 2-6      Risk Categories                                                                13
Table 2-7      Risk Tolerance Scale                                                           13
Table 2-8      MCA Assessment Criteria                                                        14
Table 3-1      Summary of High and Very High assets at risk from present and future coastal
               hazards                                                                        24
Table 3-2      Summary of Preferred Adaptation Options                                        29
Table 3-3      Present Value Results, Noosaville (Source: Aither Economics, 2020)             31

Section 8

Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                       1
Introduction




1       Introduction
1.1     Noosa Council Climate Change Adaptation Plan
        To help the Noosa Shire adapt to potential effects of climate change over time, Noosa Council is
        responding to potential climate change risks by undertaking a multi-year project to develop a Climate
        Change Adaptation Plan (CCAP) to build adaptive capacity within Council and across the community.

        The core objectives for the CCAP are to:

        • Improve Noosa Council and the community’s understanding of current & future risks from coastal
          hazards and how they might change through time as a result of climate change;

        • Consult with the community clearly and sensitively throughout key stages of the project so the
          community understands the implications and contributes to the decision making;

        • Identify what actions are required to avoid, reduce or adapt to these risks to people, property,
          assets and the environment;

        • Provide mapping & visual products and deliverables that are useful for a range of purposes across
          Council departments and functions and within the community (e.g. planning scheme, asset
          management, community awareness, disaster management and financial planning); and

        • Provide direction for a coordinated approach for Council and the community to adapt to climate
          change and coastal hazards.

        The coastal hazards component of the CCAP will be informed by the development of a Coastal
        Hazards Adaptation Plan (CHAP). The CHAP is funded by a grant agreement with the Local
        Government Association of Queensland (LGAQ), under the Queensland Department of Environment
        and Science (DES) QCoast2100 initiative.

1.2     QCoast2100 Program
        The QCoast2100 program is governed by a Board comprising members from the LGAQ, DES and
        Department of State Development, Manufacturing, Infrastructure and Planning (DSDMIP). The
        program has been designed to assist Queensland coastal local governments with funding and
        technical support to progress the preparation of plans and strategies to address climate change
        related coastal hazard risks. The program is intended to guide decision-making across key areas of
        local government planning and operations, including:

        • Corporate and operational planning and financial planning;

        • Land use planning and development assessment;

        • Infrastructure planning and management including roads, stormwater and foreshores;

        • Asset management and planning including nature conservation, recreation, cultural heritage
          values and other public amenities;

        • Community planning; and

        • Emergency management.

Section 9

Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                    2
Introduction




        The QCoast2100 Minimum Standards & Guidelines (MS&G) provide guidance to local government
        wishing to prepare a CHAP. The guidelines set minimum requirements that are to be included in a
        CHAP as well as providing information on leading practices to facilitate continuous improvement.
        The minimum standards set a benchmark for undertaking such studies in Queensland so that coastal
        hazard adaptation decision-making is approached in a consistent and systematic manner. The
        MS&G are structured to address the key phases of a CHAP which are illustrated in Figure 1-1.




                                        Figure 1-1   QCoast2100 Phases


        BMT have been engaged to complete Phases 2-7 of the QCoast2100 phases with their partners Ethos
        Urban (planners) and Aither (economists). Noosa Council are responsible for the completion of
        Phases 1 and 8, as well as leading inputs for Phase 4. This report provides a summary of the
        outcomes of Phases 2-7, for which BMT have responsibility.

Section 10

 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                     3
 Methodology




2        Methodology
         Work on the CHAP commenced in April 2017, and has progressed over that time in stages, with
         input from community consultation and Council staff at critical points as technical studies were
         progressed.

         The methodology for each phase has closely followed the guidance provided within the MS & G
         which sets out minimum standards to be achieved by each Council. A separate technical report has
         been produced and approved by Council and LGAQ at the end of each phase.

2.1      Consultation
2.1.1    Risk Workshops, 2017
         Consultation both internally and externally has informed the development of the CHAP at various
         stages.

         An initial risk workshop was held in September 2017, and was attended by council officers from a
         wide variety of council departments as well as a number of key stakeholders which included:

         • Noosa Residents & Ratepayers Association

         • Noosa District Landcare

         • Noosa Chamber of Commerce

         • Unitywater

         • Tourism Noosa.

         Attendees were asked to rate the risk to a number of community and council assets, based on the
         hazard mapping and risk criteria. This workshop helped to develop assessment criteria and also gain
         a feeling for Council and community members tolerance for coastal hazards, as well as mitigation
         options.

2.1.2    Community Pop Ups and Questionnaires, 2017
         It was also determined following the September 2017 workshop that some broader community
         consultation was required to ensure that community asset values had been captured and their
         tolerance for different risks was understood. A questionnaire regarding these issues was developed
         and community responses and their tolerance for impacts/loss of service were incorporated into risk
         scoring (see consequence criteria in (Table 2-5). These were captured by staff at a number of ‘pop
         ups’ at coastal locations e.g. Sunshine Beach, Noosaville. The community were also able to view
         hazard maps.

2.1.3    Adaptation Workshop, 2018
         A Community Adaptation Options Workshop was held in December 2018 to inform the preparation
         of the risk management and adaptation planning process to better plan and manage coastal risks
         by:

Section 11

 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                     4
 Methodology




         • Capturing critical input from community members, including valued asset identification, risk
           assessment, options analysis and adaptation pathway development;

         • Identifying the current level of community awareness of possible adaptation responses, including
           understanding the range of options and the implications and effectiveness associated with each;
            and

         • Recognising the community’s values and priorities with regard to adaptation and resilience;
           potential gaps in responses to climate change risks in current Council planning; and new
            pathways for creating a resilient Noosa not previously considered.

         Key outcomes from the workshop relating to adaptation options were:

         • There was generally community acceptance of Council’s preference to use ecosystem-based
           options, such as soft landscaping or sand nourishment.

         • Beach nourishment and sand dune protection needs to be a priority. Pedestrian and vehicle
           access must also be appropriately managed to reduce erosion rates of dunes.

         • Public assets and road infrastructure represent crucial access points for some residents and must
           be upgraded and maintained.

         • More information needs to be provided to the community regarding beach erosion rates and sea
           level rise (SLR) data.

         • Some understanding that commercial business may need to relocate/ retreat if the stability of the
           area becomes uncertain.

         • General level of acceptance for the inundation hazards. Participants are aware of existing
           inundation/flooding and accepted that the extent of these impacts would increase/worsen.

         In addition to the options discussed with and flagged by community stakeholders, additional options
         were sourced from published literature such as the coastal hazard adaptation options Compendium
         (Griffith University Centre for Coastal Management and GHD, 2012) and professional experience.

2.2      Technical studies
2.2.1    Phase 2: Scoping
         An initial scoping assessment was undertaken to review existing information relevant to the Noosa
         CHAP and identify the necessary studies to address key knowledge gaps, identify any further studies
         required to support the CHAP and establish a basis for future risk assessment. The State defined
         hazard areas were then used as the basis for a preliminary risk screening assessment of property
         potentially exposed to coastal hazards by the year 2100.

2.2.2    Phase 3: Hazard Mapping
         Detailed maps of each coastal hazard for the Noosa region were developed, taking into account
         predicted climate change for the present-day, 2040, 2070 and 2100 planning horizons i.e. erosion
         prone areas, areas subject to temporary storm tide inundation and areas subject to permanent sea
         level rise.

Section 12

Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                           5
Methodology




2.2.2.1 Storm Tide
        Storm tide hazard areas were developed using a combination of existing information and inundation
        modelling tools (Aurecon 2013; WMA Water 2017a; WMA Water 2017b), as identified in Table 2-1.
        For land adjacent to the lower Noosa River both inundation depth and velocity hazard information
        were determined.

                    Table 2-1     Summary of CHAP Storm Tide Hazard Mapping Approach

         Mapping product            Present-day             2040               2070                2100
         Open coast storm            Developed           Developed           Developed           Developed
         tide inundation            using present-    using present-      using present-         using 2100
                                   day open coast     day open coast      day open coast         open coast
                                   levels reported     levels + 0.2 m      levels + 0.5 m     levels reported
                                     by Aurecon         SLR reported        SLR reported         by Aurecon
                                     (2013) and          by Aurecon          by Aurecon        (2013) (which
                                       bathtub           (2013) and          (2013) and        included 0.8m
                                       mapping             bathtub             bathtub            SLR) and
                                                          mapping             mapping              bathtub
                                                                                                  mapping
         Lower Noosa River          Previously           Developed          Developed           Previously
         catchment storm tide      completed by        using existing     using existing       completed by
         inundation               Aurecon (2013)      TUFLOW model       TUFLOW model         Aurecon (2013)
                                                       + 0.2 m SLR        + 0.5 m SLR         (which included
                                                         boundary           boundary            0.8m SLR)
                                                          condition          condition
                                                        adjustments        adjustments
         Coincident Noosa           Previously          Previously          Previously          Previously
         River flooding and        completed by        completed by        completed by        completed by
         storm tide conditions     (WMA Water,         (WMA Water,         (WMA Water,         (WMA Water,
                                     2017a)              2017b)              2017b)              2017a)

2.2.2.2 Erosion Prone Areas
        The State Erosion Prone Area plans have been developed by the Queensland Government to assist
        development assessment and to inform the preparation of planning instruments, such as planning
        schemes and regional plans under the Planning Act 2016.

        Erosion Prone Areas (EPA) have been declared for all coastal local government areas in
        Queensland.

        The EPAs apply to land subject to inundation by the Highest Astronomical Tide (HAT) by the year
        2100 or at risk from sea erosion. On land adjacent to tidal water the EPA is defined by whichever of
        the following methods gives the greatest width:

        (1)   40 m buffer from the present-day HAT contour

        (2)   Calculated erosion distance

        (3)   Permanent inundation due to SLR in 2100 (defined by present-day HAT plus 0.8 m).

        The EPAs determined by the State define a hazard extent at a single specified planning horizon (the
        year 2100) and probability (representative 100-year ARI). The State-defined erosion prone areas are
        therefore useful for ‘first-pass risk screening’ however do not provide sufficient information regarding

Section 13

    Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                          6
    Methodology




              likelihood and consequence to undertake a more detailed risk assessment in accordance AS/NZS
              ISO 31000:2009, the SPP or other State guideline documents (such as the QCoast2100 Minimum
              Standards and Guidelines). A detailed remapping of erosion prone areas was undertaken by BMT,
              in accordance with the Queensland Government Coastal Hazard Technical Guide (DEHP, 2013).

              The potential coastal erosion hazard throughout the study area arises from a combination of:

              • The physical processes that are causing (or threatening to cause) erosion;

              • The assets and values potentially affected by the erosion; and

              • The timeframe over which the threat may act upon the assets and values.

              In order to assess the erosion hazard for the open coast beaches throughout the Noosa region, it is
              necessary to understand which areas are presently within the short-term storm erosion zone and
              areas that may become threatened in the future.

              The erosion vulnerability zone should include the following components, consistent with the
              Queensland Government Coastal Hazard Technical Guide (DEHP, 2013):

              • Short term storm erosion;

              • Continuation of the long-term historical shoreline position trend (if this can be identified);

              • Cyclic morphological change observed at river and creek mouths (not a significant issue at this
                location due to training of the southern shoreline of Noosa River); and

              • Additional future effects of climate change induced sea level rise.

2.2.2.3 Permanent Sea Level Rise
              The State EPA mapping defines permanent tidal inundation due to sea level rise (SLR) at 2100 as:

              • Present-day Highest Astronomical Tide (HAT) plus 0.8 m SLR.

              The hazard area is then obtained by extrapolating the water level across land. Areas adjacent to tidal
              waters where the ground elevation falls below the threshold water level are deemed to be within the
              hazard area.

              The SLR hazard information provided by the State is useful for ‘first-pass risk screening’ only and
              does not provide sufficient information regarding likelihood and consequence to undertake a more
              detailed risk assessment. To address this issue, SLR hazard mapping including depth classification
              was developed for the Noosa CHAP planning horizons. The adopted approach generally follows the
              State definition, whereby a threshold water level (mAHD) is defined by consideration of HAT plus an
              appropriate SLR allowance. The water level mapping assumptions are summarised in Table 2-2.
              These thresholds for different locations throughout the study area consider Maritime Safety
              Queensland published tidal planes (MSQ 2017) along the open coast and within the lower Noosa
              River. Linear interpolation 1 of the water level between the sites has been adopted with the Munna
              Point and Tewantin levels extending into Lake Cooroibah/Cootharaba and Lake Weyba respectively.




1
    Hydralogic, Future Tidal Inundation Mapping for Noosa River, 2018

Section 14

 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                        7
 Methodology




                Table 2-2     Permanent inundation due to Sea Level Rise mapping assumptions

           Planning            SLR            Noosa               Lake    Tewantin       Lake Cootharaba
           Horizon          allowance       Heads HAT            Weyba   HAT (mAHD)        HAT (mAHD)
                                (m)          (mAHD)               HAT
                                                                (mAHD)
          Present-day            0             1.16              0.5         0.91                0.2
              2040              0.2            1.36              0.7         1.11                0.4
              2070              0.5            1.66              1.0         1.41                0.7
              2100              0.8            1.96              1.3         1.71                1.0

2.2.3    Phase 4: Asset Prioritisation
         In phase 4 of the CHAP, Noosa Shire Council have sought to:

         • Identify and map assets – both tangible and intangible within the defined coastal hazard area;

         • Identify and understand potential impacts to interdependent infrastructure systems;

         • Estimate the underlying value – both economic and non-economic – of affected assets; and

         • Prioritise assets for analysis as part of subsequent CHAP phases.

         All identified assets were prioritised according to:

         • Difficulty to replace an asset

         • The cost of replacing an asset

         • The value the community places on an asset

         • The scarcity of an asset across the Shire

         • The remaining design life of an asset i.e. a shorter design life may create opportunities for asset
           replacement or responding to a changing risk profile easier

         • The ability of an asset to withstand a hazard

         • The criticality of an asset i.e. is an essential service in an emergency

         • Biodiversity value

         • The role the asset plays in Noosa’s economy i.e. fiscal contribution

         • The aesthetic value of an asset.

         Any assets that received a score greater than 4 (on a scale of 0-5) were identified as key assets and
         have been included in the risk assessment. Asset types that are not considered ‘key assets’ on an
         individual basis, but are when grouped (e.g. a given neighbourhood of private dwellings) have also
         been included.

Section 15

 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                                8
 Methodology




2.2.4    Phase 5: Risk Assessment
         A risk management approach was applied to assessing coastal hazards and future management, as
         required by the QCoast2100 Guidelines. The Australian Standard for identifying and managing risks is
         outlined in ASNZS ISO 31000:2018 Standard Risk Management Principles and Guidelines. The use
         of a risk-based approach to managing coastal hazards is a requirement of most state guidelines in
         Australia and accords with current international best practice for natural resource management.
         Council staff, key stakeholders and community members were involved in determining appropriate
         risk assessment criteria and scoring identified risks.

         Risk criteria and assessment frameworks were based on Noosa’s current risk assessment
         framework, with input from stakeholders sought during a number of engagement activities.

         The scenarios in Table 2-3 were assessed as part of the risk assessment.

         Table 2-4 to 2-4 describe the risk criteria adopted for the Noosa CHAP.

         Asset risks that were considered High or Very High are considered Intolerable and subject to further
         assessment.

                                        Table 2-3     Hazard Scenarios assessed

          Hazard                               Planning Horizon/Event
          Erosion                              Present Day
                                               2040
                                               2070
                                               2100
          Storm tide inundation                Present Day (1 in 20yr, 1 in 100yr and 1 in 500yr Annual
                                               Recurrence Intervals*)
                                               2040 (1 in 20yr, 1 in 100yr and 1 in 500yr Annual
                                               Recurrence Intervals)
                                               2070 (1 in 20yr, 1 in 100yr and 1 in 500yr Annual
                                               Recurrence Intervals)
                                               2100 (1 in 20yr, 1 in 100yr and 1 in 500yr Annual
                                               Recurrence Intervals)
          Permanent Sea Level Rise             2040
                                               2070
                                               2100
         * Annual Recurrence Interval is a way of explaining how frequent an event is, by comparing how often the event
         has occurred in the past - once in every 20 years, once in every 100 years or once in every 500 years. A 1 in
         500yrs event is considered very rare.

Section 16

Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                          9
Methodology




                                        Table 2-4     Likelihood Criteria

         Likelihood                Description
         Almost Certain            There is a high possibility the event will occur as there is a history
                                   of frequent occurrence. The event is expected to occur in most
                                   circumstances
         Likely                    It is likely the event will occur as there is a history of intermittent
                                   occurrence. The event has occurred several times or more in the
                                   past.
         Possible                  The event has occurred at least once in the past and may occur
                                   again.
         Unlikely                  There is a low possibility that the event will occur, however, there
                                   is a history of infrequent and isolated occurrence.
         Rare                      It is highly unlikely that event will occur, except in
                                   extreme/exceptional circumstances, which have not been
                                   recorded historically.

Section 17

Noosa Shire Council Coastal Hazard Adaptation Plan: Project                                                                                                          10
Summary
Methodology

                                                            Table 2-5        Consequence Criteria

 Consequence     Community                                                     Environment                            Council
                 Social                        Economic                                                               Financial              Other
 Catastrophic    Widespread permanent          Cost to repair damage to        Significant environmental impact       One-off loss to        Extensive impact on assets
                 impact to broader             properties equal (or            with long term effects. Examples       Council operating      requiring a significant
                 community’s services          almost equal) to the            include:                               budget of >$2M, or     replacement or
                 wellbeing (including to       aggregate of all impacted       • Serious environmental harm           >5% recurrent          reconstruction effort. Total
                 private owned critical        properties’ value, with             (irreversible, high impact,        reduction in branch    loss of capability.
                 infrastructure), or culture   widespread repair needed            widespread, cases > $50,000        budget.
                 (e.g. >50% of                 to damaged properties               damage).                                                  One or more major
                 community affected), or       across the Noosa region,
                                                                               • Immediate containment                                       industries’ viability (e.g.
                 popular activity/use          resulting in significant
                                                                                   required, extensive cleanup,                              tourism, agriculture,
                 disrupted permanently         impairment of Noosa
                                                                                   extensive or ongoing                                      education, construction,
                 e.g. foreshore parkland       economy.
                                                                                   remediation needed.                                       manufacturing, retail or
                 closed
                                                                               • Major impact to a protected                                 fishing) within Noosa region
                                               Costs to repair damage to           species or habitat greatly                                threatened.
                                               non-Council owned critical          contributing to or causing
                                               infrastructure (excluding           localised extinction risk in the                          A large number of
                                               private properties)                 Noosa area, requiring long                                complaints resulting in
                                               prohibitive leading to non-         term recovery efforts (>40%                               negative attention from the
                                               replacement, and/or                 loss of an ecosystem type,                                public.
                                               disruption resulting in             >40% loss of a species,
                                               significant impairment of           locally)
                                               Noosa economy.
 Major           Major permanent or            Major repairs needed to         Significant medium to long term        Recurrent reduction    Major impact on assets
                 widespread medium             damaged properties              impact on natural or built             in Council operating   requiring a programmed
                 term (somewhat                within a section of the         environment.                           budget of $0.5M to     repair/replacement
                 reversible) disruption to     community, with cost to         Examples include:                      $1M or $1m to $2M      response.
                 community’s services          repair damage to                                                       one off loss or 3-
                 (including to private         properties greater than         •   Material environmental harm        5% of recurrent
                                                                                   (significant effect and extent,                           A major industry or whole
                 owned critical                50% of the aggregate                                                   reduction in branch
                                                                                   causes $20,001 to $50,000                                 sector of Noosa economy
                 infrastructure),              property value.                                                        budget.
                                                                                   damage).                                                  put at risk
                 wellbeing, or culture
                 (e.g. up to 50% of                                            •   Immediate containment                                     Potential for a large number
                                               Damage costs to non-                required, large clean up,                                 of complaints resulting in
                 community affected or
                                               Council owned critical              significant remediation                                   negative attention from the
                 popular activity/use
                                               infrastructure (excluding           required.                                                 public.

Section 18

Noosa Shire Council Coastal Hazard Adaptation Plan: Project                                                                                                      11
Summary
Methodology

 Consequence     Community                                                  Environment                           Council
                 Social                       Economic                                                            Financial              Other
                 disrupted for up to a        private properties) greater   •   Serious impact to a protected
                 year.                        than 50% of full                  species or habitat
                                              replacement value.                significantly contributing to
                                                                                local shire extinction
                                                                                pressures, requiring medium
                                                                                to long term recovery efforts
                                                                                (5-40% loss of an ecosystem
                                                                                type, 5-40% loss of a
                                                                                species, locally).
 Moderate        Minor long term or major     Some repairs needed to a      Medium term effects on                Recurrent reduction    Some impacts on assets
                 short term (mostly           number of properties, with    environment from single               in Council operating   damaged with programmed
                 reversible) disruption to    cost to repair damage to      incident. Examples include:           budget of $250k to     response, isolated loss of
                 community’s services         properties between 20-        • Material environmental harm         $500k or one off       capability.
                 (including to private        50% of the aggregate              (significant effect and extent,   loss of up to $1M or
                 owned critical               property value                    causes $5,001 - $20,000           1-2% recurrent
                                                                                                                                         Group of businesses in one
                 infrastructure),                                               damage.                           reduction in branch
                                                                                                                                         sector or locally within the
                 wellbeing, or culture                                                                            budget.
                                              Damage costs to non-          • Immediate containment                                      Noosa region put at risk.
                 (e.g. up to 25% of
                                              Council owned critical            required, medium cleanup,
                 community affected or
                                              infrastructure (excluding         some remediation required.
                 regularly used                                                                                                          Potential for a number of
                                              private properties) 25-       • Impact to a protected species
                 activity/use disrupted for                                                                                              complaints resulting in
                                              50% of full replacement           or habitat, requiring short
                 between 3-6 months e.g.                                                                                                 negative attention from the
                                              value.                            term recovery efforts (in the
                 sandy beach takes 3-6                                                                                                   public.
                 months to recover)                                             immediate area). (<5% loss
                                                                                of an ecosystem type, <5%
                                                                                loss of a species, locally).



 Minor           Small to medium term         Minor repairs needed to a     Short term effect on built or         Recurrent reduction    Minor impact on assets
                 (reversible) disruption to   small number of               natural environment easily            in Council operating   managed with minimal
                 community’s services         properties, with cost to      remedied. Examples include:           budget of $100K to     efforts. Some restrictions
                 (including to private        repair damage to              • Minor short-term impact,            $250K or one of        apply.
                 owned critical               properties less than 2% of       almost no effect, potentially      loss of up to $500k
                 infrastructure),             the aggregate property           cumulative if not cleaned up,      or 1-2% recurrent
                                                                                                                                         Inconvenience to a group of
                 wellbeing, finances or       value.                           reversible.                                               businesses within one
                 culture (e.g. up to 10%

Section 19

Noosa Shire Council Coastal Hazard Adaptation Plan: Project                                                                                                12
Summary
Methodology

 Consequence     Community                                               Environment                       Council
                 Social                      Economic                                                      Financial              Other
                 of community affected or                                •   Environmental nuisance.       reduction in branch    sector or locally within the
                 activity/use experiences    Damage costs to non-        •   Containment required, minor   budget                 Noosa region.
                 minor disruption for a      Council owned critical          cleanup, no remediation
                 few weeks.                  infrastructure (excluding       required.                                            Potential for a limited
                                             private properties) less    •   Minor impacts on protected                           number of complaints
                                             than 25% of full                species or habitat, no                               resulting in negative
                                             replacement value.              recovery efforts required.                           attention from the public.
 Insignificant   Very small short term       Minimal or no repairs       Minimal very short term,          Recurrent reduction    Minimal or no impact to
                 disruption to               needed to a very small      temporary effects on habitat or   in Council operating   assets, which can be dealt
                 community’s services        number of properties with   species with recovery assured.    budget of <$100k       with through routine
                 (including to private       minimal repair costs.                                         or one of loss of      maintenance.
                 owned critical                                                                            less than $250K or     Minimal or no impact to a
                 infrastructure),                                                                          <1% recurrent          single business within the
                                             Damage costs to non-
                 wellbeing, finances or                                                                    reduction in branch    Noosa region.
                                             Council owned critical
                 culture (e.g. up to 5% of                                                                 budget
                                             infrastructure (excluding
                 community affected or
                                             private properties) less                                                             Zero or a few complaints
                 activity/use experiences
                                             than 5% of full asset                                                                resulting in negative
                 minor disruption for a
                                             replacement value.                                                                   attention from the public.
                 few weeks.

Section 20

 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                         13
 Methodology




                                           Table 2-6     Risk Categories

        LIKELIHOOD         CONSEQUENCE
                           Insignificant   Minor          Moderate          Major                Catastrophic
        Almost Certain     Low             Medium         High              Very High            Very High
        Likely             Low             Medium         High              High                 Very High
        Possible           Low             Medium         Medium            High                 Very High
        Unlikely           Low             Low            Medium            High                 Very High
        Rare               Low             Low            Low               Medium               High



                                       Table 2-7       Risk Tolerance Scale

        Risk Level                  Action Required                                Tolerance
        High/Very High              Immediate Action required to eliminate         Intolerable
                                    or plan to reduce the risk, or accept the
                                    risk.
        Medium                      Reduce the risk over time, or further          Tolerable
                                    investigate the risk.
        Low                         Accept the risk; manageable through            Acceptable
                                    existing processes or coastal hazard
                                    management actions.

2.2.5    Phase 6: Options Assessment
         There are numerous adaptation options that may be considered for mitigating risks from coastal
         hazards in the Noosa area. The adaptation option hierarchy adopted for the CHAP generally aligns
         with that adopted for the Noosa Environment Strategy (2019), which is shown in Figure 2-1.


                                                            Measures are implemented to ensure a 'no
                                                                 worsening' of risks as a result of
                       AVOID                                development, infrastructure works or other
                                                                           decisions.

                                                             Improve coastal hazard preparedness and
                   PREPARE                                   information sharing to enhance community
                                                                    safety, health and wellbeing.


                 ACCOMMODATE                                Mitigate risks to an acceptable level through
                                                                     careful design and location.



           PLANNED TRANSITION                                    Reposition built structures away from
                                                                    hazard areas where feasible.

          Figure 2-1    Hierarchy of preferred coastal management responses for areas vulnerable to
                               coastal hazards (Noosa Environment Strategy 2019)

Section 21

 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                         14
 Methodology




         The QCoast2100 Guidelines require Councils to develop criteria for ranking, or prioritising adaptation
         options. For the Noosa CHAP, a Multi-criteria Analysis (MCA) process was applied to potential
         adaptation mitigation options for locations where risks were assessed as High to Very High in the
         Phase 5 risk assessment. Identified options were chosen from a long list of available coastal hazard
         mitigation options, similar to the Coastal Hazard Adaptation Options: A Compendium for Queensland
         Coastal Councils (Griffith University, 2012), as recommended in the MS & G Guidelines.

         The MCA criteria and their weightings are shown in Table 2-8.

                                       Table 2-8     MCA Assessment Criteria

           Criteria          Criteria Description                                                       Weighting
                             Order of magnitude monetary costs to build/implement an
           Cost              adaptation option (further detailed studies to confirm costs would           20%
                             be required), either by Council or private land owners
                             Whether an adaptation option will have adverse impacts on
           Environmental
                             environmental values e.g. Matters of State Environmental                     20%
           Impact
                             Significance
                             Whether an adaptation option will have adverse impacts on other
           Social Impact     social values or is likely to have community support e.g. access,            15%
                             amenity, property values
           Reversible/       Whether an option is able to be ‘reversed’ or adapted to cater for
                                                                                                          10%
           adaptable         future needs
                             Whether an option is technically feasible (i.e. is effective in
                             mitigating the risk and is implementable)
                             Whether an option is able to be readily approved (i.e. is
           Effectiveness                                                                                  35%
                             consistent with current planning policy or legislative requirements)
                             Whether an option provides a long-term solution to the coastal
                             hazard risk, or is suitable for use as an interim option

         A “traffic light” system was used to group the options for further consideration as follows:

         • “GO”: an option is considered suitable with no other adverse impacts, and requires no further
            development (i.e. studies, design etc). These could also be defined as “No Regrets” options.

         • “SLOW”: an option may be suitable, but should be subject to further detailed assessment at
           specific locations i.e. Cost Benefit Analysis.

         • “STOP”: an option is not considered suitable at a location and may not be considered for further
           detailed analysis.

         The weighting applied was determined by Council officers; no sensitivity analysis was undertaken.

2.2.6    Phase 7: Socioeconomic Appraisal
         A Cost-Benefit Analysis (CBA) was performed by Aither on two regions within the Noosa region; the
         open coast and Noosaville. The aim of this socio-economic analysis was to assist council in
         understanding the merit of different coastal hazard mitigation options, particularly those that have
         significant ongoing implications in terms of economic or community impact (usually those options
         identified as requiring further assessment in the previous Phase (i.e. “slow” options).

Section 22

Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                       15
Methodology




        CBA is the most common form of economic evaluation used to inform the merit of a proposed
        investment, whether for public or private projects. It incorporates the value that people place on all
        financial, social and environmental outcomes. The analysis undertaken for this project followed the
        approach set out in the Queensland Governments Project Assessment Framework (PAF)
        (Queensland Treasury, 2015).

        The key decision-metric output of CBA is the Net Present Value (NPV), which measures the present
        value of net benefits. It is calculated as the present value of all benefits minus the present value of
        all capital and recurrent costs within the appraisal period for the project. Figure 2-2 shows the
        conceptual model used for the open beaches and Figure 2-3 shows the Noosaville Model.




                             Figure 2-2    Conceptual CBA Model for open beaches

Section 23

Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                      16
Methodology




                               Figure 2-3    Conceptual Model for Noosaville CBA

2.2.6.1 Eastern Beaches
        A total of seven different mitigation options were explored:

        • Option 1 (Base case): no adaptation actions undertaken

        • Option 2: Dune revegetation and management

        • Option 3: Dune revegetation, augmentation and management

        • Option 4: Construction of seawalls in high risk locations

        • Option 5: Acquisition of properties affected by coastal erosion in 2070, and conversion of affected
          properties to public open spaces

        • Option 6: Option 5 with a 15-year leaseback of properties prior to conversion to public open
           spaces

        • Option 7: Changes to planning regulations to prevent development seaward of the 2070 coastal
          erosion line.

        The socio-economic analysis investigated the effects of coastal erosion between 2020 and 2100.

2.2.6.2 Noosaville
        • The CBA for Noosaville investigated mitigation options for rising sea levels between 2020 and
          2100. Two options were explored: Option 1: Protect - Levees and stormwater infrastructure
           modifications (i.e. installing tide gates to prevent egress into the stormwater network)

        • Option 2: Accommodate - Road raising.

Section 24

 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                    17
 Findings




3        Findings
3.1      Phase 2: Scoping
3.1.1    Setting the Scope
         An assessment of the previous work relevant to the Noosa CHAP was undertaken to set the scope
         for subsequent phases. As a result of this scoping study, the following key parameters were set:

3.1.1.1 Sea Level Rise
         The Noosa CHAP adopted the following sea level rise allowances (relatively mean sea level in 1990):

         • 2040: 0.2 m

         • 2070: 0.5 m

         • 2100: 0.8 m.

         These allowances were based on consideration of the following key studies:

         • IPCC suggest global mean increases to sea level of approximately 0.3 m by 2050 and 0.8 m by
           2100.

         • DOE, CSIRO & BOM suggest regional mean increases to sea level of approximately 0.14 m by
           2030 and 0.65 m by 2090.

         • Analysis of east coast Australia tide gauge data suggests 3 mm/year increase in mean sea level
           (CSIRO/ARE CRC, 2012; Wainwright and Lord, 2014).

         • State planning policy and guidelines recommend 0.8 m by 2100.

3.1.1.2 Storm Tide Hazard
         The Noosa CHAP adopted present-day design water levels reported by Aurecon (2013) which
         incorporate results and recommendations of the NDRP Storm Tide Hazard Interpolation Study (GHD,
         2014). This information will be used in conjunction with sea level rise allowances summarised above.

3.1.1.3 Erosion Prone Areas
         The erosion prone areas determined by the State did not provide sufficient information regarding
         likelihood and consequence to undertake a more detailed risk assessment required by the CHAP. It
         was determined that a further erosion assessment would be required.

3.1.2    Preliminary Risk Screening
         The preliminary risk screening identified the following:

         • Total lots within the State declared Erosion Prone Area = 2,154

         • Total lots within the State Storm Tide Medium Hazard Area = 2,421

         • Total lots within the State Storm Tide High Hazard Area = 213.

Section 25

 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                    18
 Findings




3.1.3    Gap Analysis
         The scoping study identified that two pieces of further technical work would be required to support
         the CHAP. These were:

         • Development of storm tide hazard mapping for the CHAP planning horizons (present-day, 2040,
           2070 and 2100); and

         • Coastal erosion prone area assessment and mapping for the CHAP planning horizons.

3.2      Phase 3: Hazard Mapping
         Hazard maps for the Noosa Council boundary are provided in Appendix A. The key findings of the
         coastal hazard assessment were:

         • Permanent inundation due to sea-level rise: the area subject to tidal inundation due to sea-level
           rise is considered moderate in extent (i.e. relative to stormtide) across the study area and is
            primarily constrained to areas of land adjacent to the Noosa River.

         • Storm tide: due to the topography of the study area, the vast majority of locations subject to
            inundation during the design storm tide event are located adjacent to the Noosa River.
            Comparatively, only a small area of land in open coast areas would be exposed to storm tide
            inundation.

         • Erosion: the alongshore variation is primarily due to differences in the height and volume of the
           coastal barrier and the nearshore slope. The short term erosion component and the natural
            shoreline response to sea-level rise account for approximately 30% and 35% of the defined 2100
            erosion prone area, respectively.

         A comparison was conducted of the modelled hazard extents for planning horizon 2100 for 1% AEP
         storm tide and 1% AEP rainfall event, with both incorporating a projected relative sea-level rise
         component of 0.8m. The comparison revealed that within the Noosa River estuary 1% AEP
         catchment flooding is likely to be more severe than inundation during a 1% AEP storm tide event.

3.2.1    Erosion Hazard Areas
         In line with the methodology described in Section 5, the extent of the erosion hazard areas were
         mapped for open coast sections of the shoreline i.e. eastern beaches and Noosa Main Beach.

         It should be noted that the calculated erosion distances do not account for local erosion controls,
         such as the engineered coastal protection structures or erosion resistant bedrock slopes. Properly
         designed and maintained seawalls are expected to limit the landward extent of the erosion. The
         design standard of the Noosa Main Beach seawall, concealed within the sand dune, remains
         uncertain. It has been assumed the existing structure may not withstand a design storm event but
         would be sufficient to limit long term recession and the shoreline response to sea level rise. This
         assumption has been incorporated to the coastal hazard mapping that was produced for Noosa Main
         Beach.

Section 26

 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                      19
 Findings




3.2.2    Permanent Sea Level Rise
         The projected extent of inundation due to SLR is considered moderate across the Noosa region,
         primarily exposing land adjacent to the lower Noosa River. Based on current forecasts, and in the
         absence of an adaptation response, material impacts would be realised by 2070 and significantly
         escalate by 2100.

3.3      Phase 4: Asset Prioritisation
         A range of private and public assets within identified hazard areas were assessed according to the
         prioritisation criteria. Those prioritised for further assessment include:

         • Beaches

         • Foreshore parklands and associated infrastructure

         • Stormwater, wastewater, energy and water supply assets

         • Emergency services assets e.g. rural fire brigade, ambulance, coastguard depots

         • Transport infrastructure e.g. roads, bikeways etc.

         • Marinas, boat ramps, jetties etc.

         • Tourism facilities e.g. surf life-saving clubs, accommodation facilities

         • Environmental assets (e.g. national parks, environmental reserves)

         • Commercial properties/businesses

         • Residential properties      (multi-residential and     detached    dwellings), aggregated to   the
           neighbourhood level.

3.4      Phase 5: Risk Assessment
         A risk assessment was performed on the priority assets identified in the Phase 4 report within each
         Noosa locality. The risks described below (and summarised in Table 3-1) assume that there are no
         risk mitigation measures applied (beyond those already in place e.g. sand nourishment at Main
         Beach).

3.4.1    Open Coast
         The primary coastal hazard faced by Noosa’s open coast zone is erosion risk; based on a single
         occurrence of the modelled design storm event (100 ARI). This event has been given a likelihood
         rating of ‘unlikely’. A 100 ARI storm event would be expected to occur, on average, once every 100
         years, but could occur more or less frequently than once every 100 years and could occur during any
         given year.

         The open coast includes Peregian, Marcus, Castaways, Sunrise, Sunshine and Teewah Beaches
         which provide a mix of multi-residential tourism and residential properties as well as local service
         centres. These beaches are a drawcard for both visitors and locals for recreational purposes. The
         open coast is relatively natural in appearance, with few coastal protection measures at present.
         Existing erosion controls include maintaining vegetated dunes and the application of building coastal

Section 27

 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                        20
 Findings




         lines for some properties within the declared Erosion Prone Area. However the beach and significant
         portions of the dunal foreshore are at risk from significant erosion in the present day for most areas,
         with the remainder exposed by the year 2040.

         Although there is a low likelihood of an erosion event occurring (i.e. could occur in 1 in 100 years),
         should that erosion event occur, it would potentially impact private properties as early as 2040, with
         a small number of properties (22) at Sunshine Beach have been rated as being at least High risk as
         a result of erosion. By 2070, approximately 72 properties will be at High to Very High risk at Sunshine
         and Sunrise beaches. By 2100, approximately 109 properties will be at High to Very High risk at
         Sunshine and Sunrise Beaches. No private properties south of Sunrise Beach have been assigned
         a High or Very High risk, with the highest being a Medium risk by 2100 for those assets south of
         Peregian Park. Properties at Teewah are not expected to be at High risk from erosion until 2100,
         with approximately 24 lots impacted (approximately 18 full lots).

         Coastal access infrastructure (i.e. foreshore parklands, car parks, beach access stairs/pathways,
         toilet blocks) within Peregian and Sunshine Beaches are assessed as being at High Risk from
         erosion by 2070. This is based on both the loss of community access and facilities as well as the
         potential cost to Council to maintain or replace this infrastructure. Impacts to other critical
         infrastructure such as water and sewage, energy and lighting networks is rated as High to Very High
         at a number of locations, between 2070 and 2100 due to the cost to replace if impacted as well as
         the disruption to the community. Impacts to the Peregian Beach Surf Life Saving Club are also ranked
         as a Very High risk by 2100, based on the potential loss of a community service and the cost to
         repair should erosion cause damage to this facility. Potential impacts to the surrounding Peregian
         Park are also rated as High by 2070 and Very High by 2100 because of the cost to replace existing
         infrastructure should it be damaged from erosion e.g. playground, skate park etc. Similarly, Sunshine
         Beach Surf Life Saving Club and the adjacent park is also rated as being at a Very High risk to
         erosion by 2070.

         As the major east coast access road, any loss of road access along David Low Way is of a significant
         consequence for the community who utilise it to access their properties. Although there is a low
         likelihood of an erosion event occurring, should it occur there is a potential for loss of access near
         Burgess Creek, isolating homes in the Castaways residential area during an erosion event. This risk
         is rated as Very High by 2040.

         The Noosa North Shore campground – a Council-owned asset – is also rated as a High risk by 2070.

         The full risk assessment results for the open coast area is included in Appendix B.

3.4.2    Noosa Heads
         Noosa Heads is the tourism hub of the shire and encompasses Noosa’s most well-known attractions
         including Main Beach, Hastings Street retail centre, a high number of tourist accommodation
         buildings and access to the Noosa National Park. Noosa Heads is subject to potential coastal
         hazards of erosion, storm tide inundation and permanent sea level rise.

         Noosa Heads is a highly modified environment, with the first protective seawall being constructed
         along Main Beach in 1954 and subsequently upgraded on a number of occasions to protect Hastings
         Street properties from erosion. A training wall constructed in the late 1970’s at the mouth of the river

Section 28

 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                         21
 Findings




         was used to formalise Noosa Woods and assist in protecting Noosa Sound from direct wave impacts.
         A rock groyne was constructed in 1983 midway along the beach and sand nourishment occurs
         episodically, mainly using sand ‘recycled’ from the western end of Main Beach (Noosa Woods) via
         the permanent sand shifter, which was commissioned around 2012.

         Despite these measures, the risk level for Noosa Main Beach (and the existing seawall) is already
         assessed as High, and the frequency and magnitude of erosion events will likely increase over time
         with sea level rise. There is also a High risk posed to the sand shifter in its current position by 2040,
         which is considered critical infrastructure for Council to maintain sand on Main Beach. Whilst the
         main building is structurally expected to withstand such an event, it is likely to be inoperable for up
         to six months depending on level of damage to ancillary components and any accessibility
         constraints.

         Similarly, the risk level to properties in Hastings Street from erosion (most properties on the foreshore
         side of Hasting Street) is already Very High and will remain so without the application of further
         mitigation measures.

         Permanent sea level rise is estimated to pose a High risk to Noosa Drive (the sole vehicular access
         to Hastings Street and the main visitor gateway to Noosa National Park) by 2100. This risk is high
         largely because of the potential loss of access to Hastings Street and the high likelihood of the impact
         occurring. Permanent sea level rise also poses a Very High risk to the southern section of the Noosa
         Spit Recreational Reserve (also known as Dog Beach); this is ranked highly because of the increased
         potential for breakthrough to Noosa Sound. Erosion may also have a High impact on infrastructure
         within the southern end of the reserve such as dune vegetation, car park areas and public amenities.

3.4.3    Noosaville
         Noosaville offers a mix of tourist accommodation and residential properties, with a high use retail
         centre along Gympie Terrace. The foreshore parklands bordering the Noosa River are popular with
         both tourists and locals and offers a range of recreational facilities including walking/running, biking,
         playgrounds, tennis courts etc. A large number of jetties and pontoons (including the Noosa Yacht
         Club) have been built along the River to moor vessels, as well as offer water sports, and these are a
         fundamental contributor to the lifestyle offered by this area. The waterways in and around Noosaville
         also contain a number of Conservation Parks (i.e. Keyser Island, Weyba Creek Conservation Parks)
         which have high environmental value.

         The primary hazards for Noosaville are permanent tidal inundation and storm tide inundation, as
         there are varying forms of riverwalls along the Noosa River that provide some protection from
         streambank erosion. The Noosa Shire Planning Scheme also sets floor levels for buildings that are
         within the flood hazard area, providing a level of protection to properties from storm tide inundation
         or permanent sea level rise. Therefore, immediate impacts are largely limited to risks associated with
         inundation of critical underground infrastructure and the road and pedestrian network – that is,
         service provision and accessibility. Longer term risks may stem from impacts associated with a
         gradual decline in the amenity and liveability (real or perceived) of some neighbourhoods and public
         areas (e.g. foreshore parks).

         Storm tide inundation is expected to become a High or Very High risk at a number of locations or
         assets by 2070 or 2100. These locations include:

Section 29

Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                      22
Findings




        • Foreshore parklands and associated boating infrastructure by 2100 for 20 and 100 ARI events

        • The Noosa River Holiday Park (Munna Point) by 2100 for the 100 ARI event

        • Approximately 35 lots in the area bounded by Russell St to Weyba Rd, Gympie Terrace to Noosa
           Parade by 2100 (based on a 1 in 100yr ARI)

        • Approximately 80 lots (including approximately 40 dwellings) in the area bounded by Robert
          Street to Eumundi-Noosa Road by 2100 (based on a 1 in 100yr ARI)

        • Approximately 49 dwellings at the western end of Noosaville (in the area bounded by Hilton
          Esplanade, Earl Street, Noosa River and Hilton Terrace by 2100 (based on a 1 in 100yr ARI)

        • Approximately 30 lots impacted by 2100 in the area bound by Lake Weyba Drive and Noosa
          National Park based on a 100 ARI scenario

        • Significant areas of critical infrastructure (largely associated with inundation of underground
           services, particularly the stormwater and sewer networks) are exposed under most ARI scenarios;
           this poses a potential significant cost for Council to maintain operational infrastructure

        • The Noosa Australian Football Club in Weyba Road is at a High risk level by 2070 (playing fields
          only) due to permanent inundation and the 100 ARI stormtide event, with exposure extending to
           road access and parking areas by 2100.

        Permanent sea level rise will also pose a High to Very High risk at a number of locations between
        2070 and 2100. This includes:

        • Very High risk for Foreshore Parklands by 2070

        • High risk for the Noosa Yacht Club and other jetties/boat ramps along the riverfront by 2070

        • The Noosa River Holiday Park

        • Approximately 30 lots (including approximately 15 dwellings) in central Noosaville (the area
          bounded by Weyba Rd to Thomas Street, Gympie Terrace to Mary Street) by 2100

        • Approximately 16 lots (including approximately 11 dwellings and some shop fronts) in northern
          Noosaville (area bound by Thomas St to Robert St, Gympie Terrace to Gibson Road)

        • Approximately 70 lots (including approximately 50 dwellings) in the area bounded by Robert
           Street to Eumundi-Noosa Road by 2100

        • Approximately 19 lots (including approximately 17 dwellings) in the area around the Bowls Club
          (to Ernest St, Hilton Terrace) exposed by 2100

        • Approximately 55 dwellings at the western end of Noosaville (in the area bounded by Hilton
          Esplanade, Earl Street, Noosa River and Hilton Terrace) by 2100

        • The Noosa Homemaker Centre by 2100 (access roads, property fringe/carpark only)

        • Significant areas of critical infrastructure

Section 30

 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                          23
 Findings




         • Road and pedestrian networks used by the community to access private and commercial
           properties, as well as foreshore areas and recreational facilities, are affected heavily across
            Noosaville by 2100

         • Conservation Parks (and the habitats they support) including Keyser Island, Weyba Creek by
            2070

         • The retirement village in Lake Weyba Drive by 2100 (road access and property fringe only)

         • The Noosa Australian Football Club (playing fields and parking areas) by 2070.

3.4.4    Tewantin
         Tewantin is a major service centre for the Noosa region, and accommodates a large residential
         population. Fronting the Noosa River, the foreshore parklands provide recreational facilities for the
         local community and include the Noosa Marina. Importantly, Tewantin is the southern access point
         to the Noosa River Ferry which provides the closest vehicular access to Noosa North Shore, Teewah
         and the very popular Cooloola Coast section of the Great Sandy National Park.

         The Foreshore Parklands (including Martin, Tewantin and Earl St Parks, splash park and the
         Tewantin Boat Ramp) were awarded a High risk ranking for storm tide inundation from 2070. These
         are also at a High risk from permanent sea level rise by 2070. The Noosa Marina is rated as being
         at a High risk of permanent sea level rise between 2070 and 2100 (the boardwalk, tenancies and
         car park). Other critical underground infrastructure is also at a High or Very High Risk level, largely
         in lower areas around Makepeace Island, the Tewantin Ferry landing and the end of Moorindil Street.

         Approximately 15 lots (no dwellings) have been rated as being a High risk by 2070 as a result of
         permanent sea level rise to the west of Sheep Island (in the area bound by Ward Park, Ward Street,
         Myles Street, George Street and Aida Street). A further 7 lots are also considered at High risk by
         2100 in the area bound by Tait Street, Cambridge Cresent and Moorindill Street.

         The Noosa River Island Conservation Parks (Sheep, Goat and Makepeace) and their
         ecological/open space values are a ranked as a High risk from permanent sea level rise by 2070;
         the risk to the Lake Doonella wetlands also becomes High by 2070.

         The risk from permanent sea level rise to the Noosa River Ferry access (Moorindal Street and
         Maximillian Road) becomes High by 2070. Critical infrastructure around Lake Doonella is also at
         High to Very High risk between 2070 and 2100. The road network around the Doonella bridge is
         also potentially impacted by 2050 from permanent sea level rise.

3.4.5    Noosa North Shore
         The Noosa North Shore area largely comprises the Great Sandy National Park, although there are
         small low-density residential areas fringing the north bank of the Noosa River, at Teewah and pockets
         along the Eastern shores of Lake Cootharaba/Lake Cooroibah.

         Residential properties along the Noosa River (e.g. along Wallaby Track, Wygani Drive and Homeport
         Track) are at a High risk from storm tide inundation from 2040 and a High to Very High risk as a
         result of permanent sea level rise between 2070 and 2100. This involves the majority of properties
         along the river and their road access, including the Rural Fire Brigade facilities on Noosa Drive.

Section 31

 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                                       24
 Findings




         Risks to the Teewah township from coastal erosion are covered in section 3.1.

3.4.6    Lake Weyba and Surrounds
         Low density residential properties front the western edge of Lake Weyba, which is otherwise
         surrounded by National Park. The Noosa Aerodrome (a private facility with low use), is also situated
         on the western shore of the lake. Residential properties along Weyba Creek close to the lake are
         subject to both storm tide inundation and permanent sea level rise, with approximately 20 properties
         (including approximately 15 dwellings) ranked as being at Very High risk from sea level rise by 2100.
         Lake Weyba Drive (and critical infrastructure) is also at a High risk from permanent sea level rise,
         with access affected.

         Foreshore parklands around the lake edge, which include sections of Noosa National Park, have a
         high environmental value, are at High risk as a result of permanent sea level rise by 2070, rising to
         a Very High risk by 2100.

3.4.7    Lake Cooribah, Lake Cootharaba and Surrounds
         Lake Cooribah and Cootharaba form part of the Noosa River system and are surrounded by the
         extensive Great Sandy National Park. Adjacent to these features are areas of rural and residential
         property, including a closed settlement on the south-western shore of Lake Cooroibah and a small
         township at Boreen Point. Open space/conservation areas immediately around the lake shores and
         the ecological values these support are at a High risk by 2070 as a result of permanent sea level
         rise and storm tide inundation.

3.4.8    Summary
         Asset risks that were considered High or Very High through the risk assessment (as summarised
         Table 3-1), are considered Intolerable and require further investigation to determine potential risk
         mitigation measures.

          Table 3-1      Summary of High and Very High assets at risk from present and future coastal
                                                   hazards

                                                             Erosion              Sea Level Rise             Storm Tide

   Reporting
                                                   Present




                                                                                                       Present




                 Asset
                                                             2040

                                                                    2070

                                                                           2100

                                                                                  2040

                                                                                         2070

                                                                                                2100




                                                                                                                 2040

                                                                                                                        2070

                                                                                                                                2100




   Area
                                                     day




                                                                                                         day




                 Peregian beach and dune system,
                                                                           H
                 SLSC
                 Peregian Park, critical                                   H
                                                                    H
                 infrastructure
                 David Low Way – Castaways                                 VH
   Open Coast                                                       H
                 Beach
                 David Low Way – Sunrise Beach               VH     VH     VH
                 Sunrise and Sunshine beach and                            VH
                                                             H      H
                 dune system
                 Sunrise Beach residential areas                    H      H

Section 32

Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                                           25
Findings




                                                               Erosion              Sea Level Rise             Storm Tide

  Reporting




                                                     Present




                                                                                                         Present
                Asset




                                                               2040

                                                                      2070

                                                                             2100

                                                                                    2040

                                                                                           2070

                                                                                                  2100




                                                                                                                   2040

                                                                                                                          2070

                                                                                                                                   2100
  Area




                                                       day




                                                                                                           day
                Sunshine Beach residential areas               VH     VH     VH
                Sunshine Beach SLSC                            H      VH     VH
                Teewah beach and dune system                                 H
                Teewah Beach residential areas                               H
                Teewah Esplanade                               H      H      H
                Noosa North Shore Campground                          H      H
                Noosa Main Beach and dune                                    H
                                                      H        H      H
                system, SLSC
                Sand recycling system                 H        VH     VH     VH
              Tourist
              accommodation/commercial               VH        VH     VH     VH                   VH
  Noosa Heads premises

                Critical infrastructure                                                           VH
                                                     VH        VH     VH     VH            H
                (water/sewer/stormwater etc.)
                Roads                                                        VH                   H
                Noosa Spit Recreation Area                            VH     VH            VH     VH                               H
                Foreshore Parklands (incl. private                                                VH                               H
                                                                                           VH
                infrastructure)
                Noosa River Holiday Park / Coast                                                  VH                               H
                                                                                           H
                Guard
                Housing / businesses / tourism                                             H      VH                               H
                Critical infrastructure                                                           VH                               H
  Noosaville                                                                        H      VH                             H
                (water/sewer/stormwater etc.)
                Roads                                                                      H      VH
                Weyba Ck conservation areas                                                H      H
                Homemaker Centre, retirement                                                      H
                villages
                Noosa Australian Football Club                                             H      H                       H        H
                Residential areas                                                                 VH                      H        H
                Critical infrastructure                                                           H                                H
                (water/sewer/stormwater etc.)
  Lake Weyba
                Roads                                                                             H
                Noosa National Park                                                        H      VH
                Foreshore Parklands                                                        H      H
                Foreshore Parklands                                                        H      VH                      H        H
                Critical infrastructure                                                           VH                               H
  Tewantin                                                                                 H                              H
                (water/sewer/stormwater etc.)
                Roads                                                               H      H      H

Section 33

 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                                              26
 Findings




                                                                   Erosion              Sea Level Rise             Storm Tide

   Reporting




                                                         Present




                                                                                                             Present
                   Asset




                                                                   2040

                                                                          2070

                                                                                 2100

                                                                                        2040

                                                                                               2070

                                                                                                      2100




                                                                                                                       2040

                                                                                                                              2070

                                                                                                                                       2100
   Area




                                                           day




                                                                                                               day
                   Residential areas (incl. islands),                                                 H
                                                                                               H
                   Noosa Marina
                   Lake Doonella conservation areas                                            H      H
                   Residential areas                                                    H      VH     VH               H      H        H
                   Roads                                                                H      VH     VH
   Noosa North     Rural Fire Brigade                                                          H      VH                               H
   Shore
                   Critical infrastructure (electrical                                                H
                                                                                               H
                   etc.)
                   Noosa Ferry                                                                 VH     VH                               H

   Lake            Boreen Point campground                                                                                             H
   Cootharaba      Conservation areas                                                          H      H                       H        H

         The detailed risk assessment is available in Appendix B.

3.5      Phase 6: Options Assessment
         Options to mitigate high and very high risks within each locality were considered, and the analysis
         tables are provided in Appendix C. Within the adaptation pathway, highly ranked, “no regrets” options
         will tend to be most suitable for short-term implementation over expensive or complex options.

         The desired stakeholder outcomes for all open coast beaches focussed on the retention of the beach
         and dune system, and the mitigation against erosion risks to built assets in key locations.
         Maintenance of the existing dune systems, supported by complementary measures of community
         education, detailed studies (where appropriate) and monitoring all ranked highly for addressing risks
         to natural and built assets exposed to erosion hazards. There was also a high level of tolerance for
         some instances of storm-tide inundation where it already occurs.

3.5.1    Eastern Beaches (Peregian to Sunshine Beach)
         At Peregian, the wide and relatively intact dune system buffers built assets from impacts under most
         planning horizons. Continued maintenance of this buffer was the highest ranked option for this area.
         Community infrastructure management at Peregian Park and the Peregian Surf Life Saving Club,
         buy back of privately-owned land parcels and beach nourishment/dune augmentation to delay
         impacts were ranked significantly higher than asset relocation and seawalls.

         No high or very high risks were identified for Marcus Beach therefore an MCA was not undertaken
         for this locality.

         The David Low Way crossing of Burgess Creek is a critical area at Castaways and Sunrise Beaches
         requiring risk treatment. While maintenance of the existing dune ranked highly due to its relatively
         low costs, other highly ranked measures included manual creek mouth management and beach

Section 34

 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                        27
 Findings




         nourishment/dune augmentation. Upgrading to extend the bridge, seawalls and road relocation were
         the lowest ranked options for this site.

         The Sunshine Beach SLSC, community parkland, beachfront residential properties and associated
         roads and utilities are at high to very high risk from erosion impacts along Sunrise and Sunshine
         Beaches. Continued maintenance of the dune system and manual creek mouth management both
         ranked highly for this area, followed by beach nourishment/dune augmentation and buy back of
         residential land parcels. Due to the intensity of existing development, avoid measures ranked poorly
         due to their limited effectiveness. Seawalls in general but especially those on private land to protect
         private residential assets also rated very poorly, largely due to the limited technical viability of the
         option (high dune heights and infrastructure close to seaward property boundaries).

3.5.2    Teewah
         Noosa North Shore Campground, the Teewah residential area and associated access are at high
         risk to erosion. The highest ranked options for this area were active management of the beach and
         dune (and complementary measures), community infrastructure management and design resilient
         public infrastructure (where present). Buy back and beach nourishment were ranked lower, largely
         due to their significant costs. Seawalls again rated poorly due to the high dune heights in the area
         and the technical infeasibility of that option.

3.5.3    Noosa Heads (Erosion)
         Noosa Heads is exposed to erosion from the open coast as well as inundation hazards via the Noosa
         River frontage.

         Noosa Main Beach is already exposed to very high erosion risks, existing risk treatments include a
         seawall to protect landward infrastructure and a permanent sand shifter system to rapidly reinstate
         the recreational beach following severe erosion. Further options have been considered to limit
         erosion of the recreational beach as well as provide additional protection to tourist, commercial and
         community infrastructure. Noosa Woods Beach lies north of Noosa Main Beach but is backed by a
         well-vegetated dune system containing limited public infrastructure, except for infrastructure to
         support operation of the sand shifter and access roads. Dog Beach, within the Noosa River, is subject
         to erosion hazards as a result of channel migration.

         For Noosa Main Beach, hazard resilient design for new or upgraded private infrastructure ranked
         highest on the options, while dune augmentation was highest for Noosa Woods Beach and Dog
         Beach. The density of development landward of Noosa Main Beach limits the implementation,
         economic viability and political acceptance of many options to reduce asset exposure. Improving the
         efficacy of the sand shifter rated higher than upgrading the existing seawall. Options to reduce the
         intensity of existing development and protective structures such as groynes and breakwaters all rated
         poorly, largely due to costs and social impacts.

3.5.4    Noosa Heads (Inundation)
         High and very high risks associated with inundation impact on the Noosa River frontage of Noosa
         Heads. For the highly developed tourist area around Noosa Parade to Noosa Drive where risks are
         associated with sea level rise hazards, hazard resilient design for infrastructure rated highly, along

Section 35

 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                        28
 Findings




         with tide flaps /valves on the stormwater network to limit penetration onto roads and properties via
         this path. Raising footpath levels rated lower than modifications to the stormwater network due to the
         potential for increasing impacts on the road network.

         At Dog Beach, the highest ranked options to manage sea level rise and storm tide risks were active
         dune and habitat management as well as dune augmentation, which rated higher than manual creek
         channel management.

         Major infrastructure such as tidal gates or surge barriers, although benefitting more than just the
         Noosa Heads locality, rated poorly for all parts of Noosa Heads, largely due to the significant costs,
         environmental and social impacts, and complexity of gaining approvals.

3.5.5    Noosaville
         Sea level rise and storm tide expose numerous areas within Noosaville and around Lake Weyba to
         high and very high risks.

         Hazard resilient design for public and private infrastructure rated well for both hazard types, along
         with modifications to the stormwater network to reduce penetration into inland areas and build
         redundancy into the system to ease impacts where possible. Options such as raising road or footpath
         levels rated more highly than major infrastructure such as levees and tidal gates but would need to
         be done in conjunction with stormwater network management measures for optimal benefit. Land
         buy back and land swap rated poorly due to the major cost and social implications.

         Although levees rated poorly due to the costs involved, the wider community benefit may outweigh
         this. Similarly, although road raising rated poorly, the road network through Noosaville provides
         important connectivity between Noosa Heads and Tewantin.

3.5.6    Tewantin
         Assets at high risk or very high risk from sea level rise include residential areas (including roads and
         associated utilities), Noosa Marina, Tewantin end of the Noosa River Ferry landing, and the foreshore
         parklands. Design of hazard resilient infrastructure rated highly for this locality, as did rolling
         easements and land management to support habitat migration, both of which could only be
         implemented in selected areas. Levees, land buy back and tidal gates all rated poorly, driven by high
         economic, environmental and/or social costs.

         Only the foreshore parkland areas at Tewantin were at high risk from storm tide, with affected assets
         mainly park infrastructure and associated utilities such as stormwater, electricity etc. The assessment
         shows that designing hazard resilient infrastructure and stormwater network management actions
         rated highly. The relatively short section of levee (and therefore lower cost) required to protect the
         parklands elevates this option within the rankings, particularly compared to river walls with high crest
         levels and tide gates. Master planning of public lands, while reducing impacts on infrastructure, does
         not reduce risks on the broader usage of the land.

3.5.7    Noosa North Shore
         For private riverfront development including the rural fire brigade facility on Noosa’s North Shore,
         design resilient infrastructure was the highest ranked option to mitigate against risks from storm tide

Section 36

 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                             29
 Findings




           and sea level rise inundation, followed by reducing the intensity of future development. While some
           of the properties already have river walls, crest heights are low. Raising crest levels is ranked higher
           than levees and land buy back, all of which mitigate risks to the road network from sea level rise,
           with the exception of road impacts around the Noosa North Shore end of the Noosa River Ferry
           landing. Tidal gates at the mouth of the Noosa River is the lowest ranked option to mitigate against
           inundation risks in this area.

3.5.8      Lake Cootharaba
           Assets at high or very high risk from storm tide and/or sea level rise inundation in this locality are the
           Boreen Point Campground and areas of National Park / conservation importance fringing the Lake.

           As there is uncertainty on the extent of built assets within conservation areas, design of hazard
           resilient infrastructure was the highest ranked option for managing sea level rise, closely followed by
           habitat migration. Major built infrastructure to reduce risks to conservation areas all rated poorly,
           including levees and tidal gates.

           At Boreen Point Campground, the option ratings for storm tide were similar, although opportunities
           to relocate important infrastructure landward ranked higher than implementation of measures such
           as seawall, levees and tidal gates.

3.5.9      Summary
           Coastal hazard adaptation options that rated favourably (albeit, many requiring further investigation)
           in the MCA process at localities within Noosa Shire are summarised in Table 3-2.

                                Table 3-2      Summary of Preferred Adaptation Options

        Locality                Potential Adaptation Options (in order of                Adaptation Hierarchy
                                preference)                                              Approach
        Peregian to Sunshine    Active dune and habitat management                       Accommodate (short term)
        Beaches                 Manual creek mouth management                            Planned transition (long term)
                                Community infrastructure management
                                Land buy back
                                Relocate important infrastructure
                                Beach nourishment
                                Dune augmentation
        Noosa Heads             Design of hazard resilient infrastructure                Accommodate
                                Tide flaps and valves on stormwater pipe network
                                Active dune and habitat management
                                Dune augmentation
                                Improve sand shifter efficiency
        Teewah                  Active dune and habitat management                       Accommodate
                                Beach nourishment
                                Dune augmentation
        Noosaville              Design of hazard resilient infrastructure                Accommodate
                                Tide flaps and valves on stormwater pipe network
                                Raising road levels
                                Levees

Section 37

 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                         30
 Findings




        Locality                Potential Adaptation Options (in order of             Adaptation Hierarchy
                                preference)                                           Approach
        Tewantin                Design of hazard resilient infrastructure             Prepare/Accommodate
                                Tide flaps and valves on stormwater pipe network
        Noosa North Shore       Design of hazard resilient infrastructure             Avoid/Prepare
                                Reduce intensity of future development
        Lake Cootharaba         Design of hazard resilient infrastructure             Prepare
                                Relocate important infrastructure
                                Land management to support habitat migration


3.6        Phase 7: Socio-economic Appraisal
           Following the MCA Assessment, a Cost-Benefit Analysis (CBA) was performed by Aither on two
           regions within the Noosa region: the open coast and Noosaville (Aither, 2020a and b). The options
           chosen were primarily those that were favoured by the MCA analysis, with some minor adjustments
           made e.g. an additional option of changes to planning regulations was added to the Eastern Beaches.
           The findings of the CBA are provided below.

3.6.1      Open Coast Locations
           A cost-benefit analysis (CBA) was performed for a range of options for open coast locations (Teewah
           and the Eastern Beaches) where risks were rated as high or very high by 2100. The Noosa Main
           Beach compartment was not included due to the limited capacity to carry out measures in addition
           to those already in place in this location (as noted in Section 3.5.3).

           The analysis identified that option 3 (dune revegetation and beach nourishment/augmentation) would
           provide the greatest economic net benefit for managing erosion risks along the Eastern Beaches, for
           the options assessed. The benefits of this option are driven by the significant value provided by the
           continued natural protection of high value beachfront properties, however it is recognised that this
           option may only be of value in the short term and is ranked high because of the low cost of
           implementation rather than the delivery of significant benefits.

           Uncertainties remain regarding the reliability of a sufficient offshore sediment supply over the long
           term due to incomplete understanding of existing sediment volumes, and changes to sediment
           movements into the local offshore zone in the latter half of the study period.

           Option 7 (changes to planning regulations) would also deliver net economic benefits, although the
           net benefits are lower than under option 3. Implementing planning restrictions, alongside dune
           augmentation in viable locations is likely to deliver socio-economic benefits to the community and
           reduce risks.

           Option 4 (construction of seawalls in high risk locations) had the least socio-economic benefit due to
           loss of amenity, low community support, impacts on the tourism economy, and cost of construction.

           Options 5 (property acquisition and conversion to public property) and 6 (Option 5 with a 15-year
           leaseback of properties prior to conversion to public open spaces) were the most economically viable
           for Teewah of all options analysed.

Section 38

 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                       31
 Findings




                    Figure 3-1   Open Beaches Net Present Value (Source: Aither Economics, 2020)

3.6.2    Noosaville
         The results of the Noosaville CBA have identified that Option 1 (levees and stormwater infrastructure
         modifications) provides the greatest net benefit to the community in terms of protection from sea level
         rise, as shown in Table 3-3. This is driven by avoided loss of tourism revenue and recreational area
         and reduced infrastructure damage. It assumes that stormwater infrastructure modifications are
         required from 2040, whilst the levees are not constructed until 2070.

              Table 3-3        2100 Present Value Results, Noosaville (Source: Aither Economics, 2020)

                                             Option 1 – Levee and      Option 2 – road        Confidence
                                             stormwater modification   raising
            Net Present Value                $21.5m                    -$3.9m
            Benefit Cost Ratio               2.11                      0.80

            Costs                            $19.4m                    $19.2m
            Levee costs                      $8.9m                                            Medium
            Stormwater modification costs    $10.5m                                           Medium
            Road raising costs                                         $19.2m                 Medium

            Benefits                         $40.9m                    $15.3m
            Recreational benefits            $6.5m                     $0.1m                  Low
            Avoided property damage          $0.1m                     $0.1m                  Low
            Avoided road damage              $1.1m                     $0.6m                  Medium
            Tourism benefits                 $27.1m                    $10.8m                 Low
            Avoided damage to stormwater     $3.0m                     $0.6m                  Medium
            network
            Residential nuisance benefits    $3.1m                     $3.1m                  Low

Section 39

Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                        32
Conclusions and Recommendations




4       Conclusions and Recommendations
        Noosa faces impacts from a range of coastal hazards, particularly towards the latter half of the
        century. In some locations hazards are being experienced in such a way as to already represent a
        material risk. A risk assessment identified that without mitigation, increased coastal erosion is likely
        for the open coast region, having a high impact particularly on privately-owned assets, as well as
        Council coastal infrastructure (e.g. roads and recreational areas) and the beaches themselves. Areas
        along the Noosa River (Noosa Heads, Tewantin, and in particular Noosaville and Noosa North Shore)
        will be increasingly at risk due to inundation associated with rising sea levels. In this instance, the
        greatest level of exposure and impacts are expected to be felt by Council infrastructure (e.g.
        stormwater networks, open space, roads), some private property, as well as indirect consequences
        for adjacent retail and commercial operations.

        A summary of the potential coastal hazard mitigation measures for consideration and further
        investigation prior to inclusion in the Coastal Hazards Adaptation Plan is provided below. The
        majority of these options were then analysed further through a Cost-Benefit Analysis. It’s important
        to note there are a range of factors Council must consider beyond the findings of a CBA (i.e. as
        expressed in financial terms) when determining which hazard mitigation measures to include in the
        plan.

         Locality               Recommended Adaptation Options                     Recommended Adaptation
                                                                                   Hierarchy Approach
         Peregian to Sunshine   Active dune and habitat management                 Accommodate (short term)
         Beaches                Manual creek mouth management                      Planned transition (long
                                Community infrastructure management                term)
                                Land buy back
                                Relocate important infrastructure
                                Beach nourishment
                                Dune augmentation
         Noosa Heads            Design of hazard resilient infrastructure          Accommodate
                                Tide flaps and valves on stormwater pipe network
                                Active dune and habitat management
                                Dune augmentation
                                Improve sand shifter efficiency
         Teewah                 Active dune and habitat management                 Accommodate
                                Acquisition of properties affected by coastal
                                erosion in 2070, and conversion of affected
                                properties to public open spaces
                                Beach nourishment
                                Dune augmentation
         Noosaville             Design of hazard resilient infrastructure          Accommodate
                                Tide flaps and valves on stormwater pipe network
                                Raising road levels
                                Levees
         Tewantin               Design of hazard resilient infrastructure          Prepare/Accommodate
                                Tide flaps and valves on stormwater pipe network

Section 40

Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                       33
Conclusions and Recommendations




         Locality               Recommended Adaptation Options                    Recommended Adaptation
                                                                                  Hierarchy Approach
         Noosa North Shore      Design of hazard resilient infrastructure         Avoid/Prepare
                                Reduce intensity of future development
         Lake Cootharaba        Design of hazard resilient infrastructure         Prepare
                                Relocate important infrastructure
                                Land management to support habitat migration

        The feedback received during public consultation throughout the project thus far has been for Council
        to focus on less intrusive solutions to minimising these potential risks such as nature-based solutions
        (i.e. beach management and dune augmentation) on the open coast, rather than hard (less
        reversible) interventions such as seawalls or levees. This was borne out by both the options
        assessment (Phase 6) and more detailed Cost-Benefit Analysis (Phase 7). particularly for the open
        coast areas which favoured ‘lighter touch’ options. For the settlement of Teewah, on the coast north
        of Noosa, a planned transition was favoured by the CBA. Where inundation from sea level rise or
        stormtide is the predominant hazard, the Cost-Benefit Analysis has favoured intervention such as
        the construction of levees or infrastructure upgrades where there is significant public infrastructure
        and properties at risk. The probable timing for these interventions is for adaptation options to be in
        place by 2070. The study also found that planning controls may also be used to support nature-
        based solutions, and thus could be included in a suite of complementary measures that are
        consistent with the feedback received.

4.1     Additional considerations
        While natural options such as dune augmentation and beach nourishment ranked highly in open
        coast areas, uncertainty remains as to the most economical and reliable sources of sand that can be
        used for this purpose. It is strongly recommended that investigations into possible sand sources for
        these purposes are undertaken in the near future, with a view to securing long-term access, statutory
        approvals and funding for implementation and a clear and sequenced action plan. This is especially
        important given there may be a need to address the impacts of erosion promptly following extreme
        storm events.

        The concept design for inundation protection measures i.e. levees should also be further developed
        to gain a deeper understanding of design options and costs.

Section 41

Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                  34
References




5       References
        Aither, 2020a. Noosa Shire Council – Coastal Hazard Adaptaiton Plan Cost Benefit Analysis.

        Aither, 2020b. Noosa Shire council CHAP – Phase 7, Noosaville Cost Benefit Analysis, prepared for
        Noosa Shire Council

Section 42

Noosa Shire Council Climate Change Adaptation Plan: Project Summary   A-1
Hazard Mapping




Appendix A               Hazard Mapping




G:\Admin\B22613.g.mpb.Noosa_CHAS\R.B22613.005.01.Phase 7.docx

Section 43

;                                                                                                               i                 Google™ earth
  }                        x                                                                                                        Data SIO, NOAA, U.S. Navy,
                    ~Z     fi,                                                                                   |                  NGA, GEBCO
            ee         Ae /                                                                                     fi                  image © 2017 DigitaiGlobe
      ect                        -                              a                                              |                    image © 2017 CNES/ Airbus
     §                                                                                                       of
      \       Zs ~                                     r .                                                  i
      ioe              ay       ff                                                              .     \   )
      Cope             A                              5
                            Ang                                                                        A   F
                             w                                                bea                         |
      y                          a                                        ‘  :    .  ss 4                i
                                                                   a             =   Lake)               |
     LEGEND                                                     eRe                  =—_                |
             Noosa Shire                                                     teed
             LGA Boundary                                                       ‘ e                    f
                                                                                 rs                 “ j
     ——— Noosa River                                      hie     ten         aa                eg!
                                                       it      ut         ae =       ™            n /
        Peak Flood Depth (m)                                      Ca                    1          H
                                                              a                           J      [
                                                             id                                    i
 ,               0.0 to 0.5                                 Y                                     i
                0.5 to 1.0                                F          oan                ;        |
                 1.0 to 1.5                              F                         Fi            |
                 1.5 to 2.0                              A                           v          TL eewah
                 2.0 to 2.5                               le                                    j
                 2.5 to 3.0                      .         a                                    }
                 3.0 to 3.5            5       :    -     Fo                                    !
                 3.5 to 4.0                 ,         ,                  a
                 4.0 to 4.5               -                           y..                      |
                 4.5 to 5.0              ,                           :                         i
                 >5.0                             a
      Hazard extentderived                          :             es ie                       !
                                                              =i      .                       +
      using methods described                    ;       k             ;    Fs i
      in Aurecon (2013) and                                '                  oa
      Airborne Laser Scanning                                .           py a &                '
      data captured in 2010.                               ’                mo      |          :
      inundation depths are               oy               Pip           -          }           ‘
      derived from waiter levels                     ee) panescooroibah             Zz          i
      that do not include any                  :      p       «       .          Ss              ;
      freeboard allowance.                          i                   5      4 K4
                                                                     OIRO                                 By
                                                                           bee        ys          Er
                         ee                                                            ae                                |
 a                ee,    Bs                                        wn       me    mes      Pe          es at
    \             tae            a                                  a teh SS Py ‘ ~ Suter asot ep       y. Ps         ie
                      *          :                                     pie Me         Wert  i          ey         a
                 2 5                Ree               ;                re op    Men      Sea          ys     ee
                                         oe           ;               :         ie Ce     we Rae”                  Nt   |
         wee!                                                            Dees Ce                     (oe    ae Beach)
               oo! OV                                                        r    ag               yes               elit
       F   Be     -    F     .            7    ;         =                        eS        2    ace  on         oe
       ay         “¢                                                        a              .
                                                   ,                 xd                 :               j          |

                                  \   ee                    :                                                a
                                     ae        :     .     z                 ‘                 Peregian|Beach
                                 P                      .                                      HG                }
             :                           at   Pi                                                    ae        B
                                a                                                              Ae
Title:                                                                                                                       Figure:                         Rev:
 Present Day 100 year ARI Storm Tide Inundation Peak                                                                       A-1                                A
 Depth
                 :                   ‘            :       i                                                                    sie
 BMT WBM endeavours to ensure that the information provided in this                                                           We cy
 map is correct at the time of publication. BMT WBM does not warrant, N      Okm               4                 8            ty C2:
 guarantee or make representations regarding the currency and                 a                                                   mat
 accuracy of information contained in this map.                 / \                   Scale - Main Map                         ‘a       BMT             \WBM
  ‘    c   i      i                                                                               Fi                            wal
                                                                                                                                          www.bmtwbm.com.au
 Filepath: 1|:\B22613.i.mbp.Noosa_CHAS\DRG\COA_010_170802_Storm_Tide_Present_Day.wor

Section 44

;                                                                                                        i               Google™ earth
  }                      x                                                                                                 Data SIO, NOAA, U.S. Navy,
                  oat    fi,                                                                             |                 NGA, GEBCO
           ee        Dye /                                                                               i                 image © 2017 DigitalGlobe
      acta                     r                                                                        fi                 image © 2017 CNES/ Airbus

      ye ~Y                                       Foy                                                |
       >             ay Pema y                          :                                .     \   i}
                          Ang                                                                   A   !
                           >                                        a     ]                        i
     :                     w                                       : *. i ~ Ce ,                  i
                                                             i. ue              Meccan           |
    LEGEND                                                  acto    Gia Wek.
            Noosa Shire                                             “      ae                   }
            LGA Boundary                                                he                     |
    ———— Noosa River                                      on     <._.SS                        eet
                                                   fas i  ,     ee             3           ae

       Peak Flood Depth (m)                                P                                |
                                                       eo                                   {
 7              0.0 to 0.5                             Pe                                   I
               :0.5to 1.0                                       cake              er       )
                1.0 to 1.5                           ,                            EO
                1.5 to 2.0                        pe                             ae
                2.0 to 2.5                        ee                           2          ve
                2.5 to 3.0                    FE Boreen                         Ss
                3.0 to 3.5               a.    ee                           oe           i
               3.5 to 4.0                 ae     ae                         a            i
                4.0 to 4.5                       ;                      all              !
                4.5 to 5.0                    Be             cial                       i
                >5.0                          ce           ap pele
     Hazard extentderived                        -—  e                  a
                        :                            (TAN            eee                N
     using methods described                  ;    seat 9 = 5      ‘     =.
     in Aurecon (2013) and                             Hii &:          pe    3
     Airborne Laser Scanning                          -              gee  | ss           \
     data captured in 2010.                            ’      Sa                         f
     inundation depths are             oy               are         r          7         v
     derived from water levels           5       Mea ase) panescooroibah     ae           i
     that do notinclude any                 .     *       a       7        ad      c       ‘
     freeboard allowance.                  :     so               ah        Gi
                                                     “        e                             P
                ,                 .                                 Lae                            Weg
                 GO)                                           ee                              eae
    Y            me           Vs                                ek oe    i ves oS             a ri            i
                Ptr  he                                           fm Hy      , Set fh                     en
                                      2   -       a‘               Ped ae     ont,   Ree            Fs   Prag ve
                           DEE          ok         .              aaa  mA ; hee Hy            4 ©    siSunshine)
            eee                                                     Dey: Pia A) Ger                 Mem ecach |,
         Ny   Cooroy;                                               ccm pari: “LO Maem                   9,
      ?    a       een:          P        -                +            5    tr ae             aa a      ay
         ;     tae               ‘      Ci         Torey                  ;        Pa               5      ay
       ay        “¢                                                    os

                                \   ee                  :                                             a
                                   ae      :      .    z                ‘               Peregian|Beach -
                                                    5                   ;                Et ce           }
                               :         ag                                              “a e™
            sg                        et                                               As             i
                                 5                                                                 oe   |
Title:                                                                                                              Figure:                        Rev:
 2040 Planning Horizon 100 year ARI Storm Tide                                                                      A-2                             A
 Inundation Peak Depth
                                                                                                                         A
 BMT WBM endeavours to ensure that the information provided in this                                                   We
 map is correct at the time of publication. BMT WBM does not warrant, N Okm              4               8           ty G2:
 guarantee or make representations regarding the currency and                                            |              ma
 accuracy of information contained in this map.                                 Scale - Main Map                      ‘a       BMT WBM
  pope eet       3             :                             Ny                            :                           eZ,
                                                                                                                                 www.bmtwbm.com.au
 Filepath: |:\B22613.i.mbp.Noosa_CHAS\DRG\COA_010_170802_Storm_Tide_Present_Day.wor

Section 45

;                                                                                                      i               Google™ earth
  4                      i                                                                                               Data SIO, NOAA, U.S. Navy,
                   3    j A                                                                                              NGA, GEBCO
           ee        Nee /                                                                             f                 image © 2017 DigitalGlobe
      ect                     -                            a                                          /                  image © 2017 CNES/ Airbus
    {                            ,                                                                  i
     \                                               ,                                               /
      \      ~~                                   ord                                               i
     Ss              a       ff                                                              \    4 i
      Cope           A                           5
                         Ang                                                                  A   ie
                           w                                      i          4
     y                      a                                     ii ih oe     =                 i
                                                                 ae,  oe        %  Coolcol
    cone                                                   Beco.
            Noosa Shire                                            e      ‘y Ae                j
            LGA Boundary                                               ne     3             '
    ——— Noosa River                                ae           _—            4         »    |
                                                  i      he             x     4           ae
                                                           1                     4
                                                           we                      |       }
       Peak Flood Depth (m)                               ee                       i       i
                                                       Q                                 ‘/
               0.0 to 0.5                             F
               0.5 to 1.0                           f           ake)                     i
               1.0 to 1.5                                                                H
               1.5 to 2.0                        ee,                                   alt
               2.0 to 2.5                      carats                                   ree
               2.5 to 3.0                    FS Boreen|                       4         H
               3.0 to 3.5               a       y                              i
               3.5 to 4.0                7    i i                          a.          i
               4.0 to 4.5                       yo                    rer              |
               4.5 to 5.0                      %              oo                       i
              >5.0                           oe        a a
                                               i.   4 ce     ee
     Hazard extentderived                               Ol     ao        ae            1
     using methods described                 ;      ay)           a   -     2          }
     in Aurecon (2013) and                            ‘           :    F
     Airborne Laser Scanning                         A                   |   te.
     data captured in 2010.                                  ii |                      \
     inundation depths are             ae             pa    ‘      Pex       '          ‘
     derived from water levels          5        ee ae) paar eo              EZ          ‘
     that do notinclude any                .     *       A       .         >"            ‘
     freeboard allowance.                       se              .        aA
                                                            ec      - 2X        :               esr)
                                                    aa           ee       ‘SS              :

             ’                                              e      phe     sy              |  pe
    4            a            rs                               eh)            Be      aay     a           no
               . tes ba       ;                                  if    Se bs a Sale: fomas              a ae
                                     .   ,        H               ret ee          git ha > ty 7”  Fs   a     ue)
              oa            $    s   a            :             “   ree ae Thee a                  eeSunshine)!
               Be:                                                    a                 RS
             5     » Las              ‘    .                                Mabe Pee   =A     =.        roa
          i oe                                                    {  4                   Wake      4     y

                                           nia        :                                 i .         ao P
                               _                                                               i     en
                                \  ee                  :                                            rae!
                                  ae       :     .    e               :                Peregian|Beach' |
                                                    :                  5               ¢ Ls ra         }

                                5                                                                  el |
Title:                                                                                                            Figure:                       Rev:
 2070 Planning Horizon 100 year ARI Storm Tide                                                                    A-3                            A
 Inundation Peak Depth
               :                 :            :      j                                                               sie
 BMT WBM endeavours to ensure that the information provided in this                                                We. oo
 map is correct at the time of publication. BMT WBM does not warrant, N Okm            4                8          ty Oe:
 guarantee or make representations regarding the currency and          a                                              ma
 accuracy of information contained in this map.                                Scale - Main Map                     a        BMT WBM
  fore  oe                                                  *                             :                          rad,
                                                                                                                               www.bmtwbm.com.au
 Filepath: 1:\B22613.i.mbp.Noosa_CHAS\DRG\COA_009_170802_Storm_Tide_2070.wor

Section 46

;                                                                                                             i                 Google™ earth
  4                        i                                                                                                      Data SIO, NOAA, U.S. Navy,
                   oat    f iL.                                                                                |                  NGA, GEBCO
           ee         Nee /                                                                                   fi                  image © 2017 DigitaiGlobe
       ect                      -                              a                                             |                    image © 2017 CNES/ Airbus
     §                             ;                                                                       F
     \        Ss sy                                   r   a                                               i
       _              *     =                                                                  SS        4
      Cope            A                              5
                           Ang                                                                       A   F
                            ,                                          ¥.,    ]                          i
                             w                                        Pig                               }
     ry                         er                                    id   aie        a                i
    LEGEND                                                     WakelComoyy                            }
             Noosa Shire                                               bam             4
             LGA Boundary                                                    nt                      ¥
     ——— Noosa River                                   ae            re        ae.            sg
                                                      £7     2      aie       :      4          +a
                                                               yi. ;                              |
        Peak Flood Depth (m)                                 *                           4       i
                                                            r                             q     "
 ”              0.0 to 0.5                               r                                {     f
                                                           r                                     /
  :             0.5 to 1.0                              po          poke                 Jy     |
                1.0 to 1.5                              |                                ak     |
                1.5 to 2.0                          Ce,                                :     5
                20to25                            ; : $   sy                         rs        lcewah
                2.5 to 3.0                      a       ow /Boreen)                           }
                3.0 to 3.5            F       =, Ps j                               '         1
                3.5 to 4.0                  ——                                                !
                4.0 to 4.5                          }
                4.5 to 5.0                        £                           a              i
                >5.0                            a,            :       ;
                                                    Se       -
                                                       ,                   atlas             ‘s
      Hazard extentderived                         —           = Se a                        !
      using methods described                   ;   dy         4    ee    a .   '
      in Aurecon (2013) and                             i |          P      Pf
     Airborne Laser Scanning                             bls      a      ee
      data captured in 2010.                           ‘oa       ie |                         :
      inundation depths are              ae               pa    3      F           ]          y
      derived from water levels            \        Bee      2ke)Cooroibah       aay           ‘
      that do notinclude any                  :     ro       A       i             4           i
      freeboard allowance.                   3      ae                th      a /ad
                                                        i?            aS        \               i
                                                                 —                 7             .
                 ,                  :                                     cat) “Ss -                     ed
              .      “A       ‘                                 Ls      if i ye -        3      | 4 ee                 }
 M              re)     9    ;                                    v  Meee      ea     eS oo            ey
                Me                                   :                Cee pe I RE                              EN
                            AW        x a             :              - are: ‘       ee               a    “Sunshine,
             & fe wR                                                          cals  re  ee. hom             a    oy
         ¥    wee                                                      D     iH oS           Pa    ae       Beach”
          © 1 Cocroyls                                                 ae anal.          Qe ee)
       2   Ne    os bs 4    ;      ®    s    os                                  > Fe Ee               a       ey
          ‘     Ws    x           2       :             ee     :       P      ,        F de               7     Bs
    os    r       a |                                                      Dy            4                "      ,
                                         P                          *  ,              ia               4         f
                                           _                   P      ce                 L               q     ’|
                                              ;             =                                   eee
                                                         Ay                                      : bg      ya   i]
                                  \   ee                   :                                               a
                                    ae        :     .     z                ‘                 Peregian Beach *
          ;                                            f                    ;                 Fat              /
                                P               ae                                                LS        a
  ,         &                           ;                                                   ~    ee         #
                    ‘           fi                                                :           Re Gy         :
                                  ~                                                           Ss nt          i
Title:                                                                                                                     Figure:                        Rev:
 2100 Planning Horizon 100 year ARI Storm Tide                                                                            A-4                               A
 Inundation Peak Depth
                :                   :            :       j                                                                   sie
 BMT WBM endeavours to ensure that the information provided in this                                                         We oo
 map is correct at the time of publication. BMT WBM does not warrant, N     Okm              4                 8           ty C2:
 guarantee or make representations regarding the currency and               a                                                  ma
 accuracy of information contained in this map.                                      Scale - Main Map                        wa       BMT            \WBM
  fore   oe                                                     *                               :                            rad,
                                                                                                                                        www.bmtwbm.com.au
 Filepath: 1:\B22613.i.mbp.Noosa_CHAS\DRG\COA_011_170802_Storm_Tide_2100.wor

Section 47

?                      :                                              i                                              Googie™earth
                        i                                                    ;                      :                 Data SIO, NOAA, U.S. Navy,
           2      “4    fi,                                             P   to                                        NGA, GEBCO
          é          ye /                                              ro   a                                         image © 2017 DigitalG lobe
      acta                   :                                          a                         F                   image © 2017 CNES / Airbus
    §                                                               bf
      \       - ~y                              a   a           y           :
     4                                             ’              atl    f                       ,
                     ay      ff                             ,             | , ]      \         3}
           ill      A                           7    }         Fe         oy
                        ~                                                  e                r
    ri                       er                                              ; e3            i
                                                           rl                   q
    LEGEND                                                 ee              fHake|Cooloolal
            Noosa Shire                                     »                  |
            LGA Baunllaly                        ae      Fe.  ee              q      :
    ———— Noosa River                           x       ae                     4
                                                te       oe                   4        *
   —— Urban Model Extent                       e     SS                        ‘
                      rai                                “g 2                   5
       Peak Flood Depth (m)                          ;                            1    y
 f                                                 F          lake
               0.0 to 0.5                                  Cee                    |
              0.5 to 1.0                                     er eed
               1.0 to 1.5                   ae                                  =
              1.5 to 2.0                 p         Py .                         3
               2.0 to 2.5                  ws     *& Boreen                    “wd
               2.5 to 3.0          —                                         as
               3.0 to 3.5               ,                                   di
               3.5 to 4.0            .        a                         al
               4.0 to 4.5           ,   Pet                           Y
               4.5 to 5.0               ne                         oes
               >5.0                      ae ee                    i
     Hazard extentderived                      F          s.      4 E       |
     using methods described                     a.)         ir
     in WMA Water (2017) and                        | -     oF oe      j    Pan.
     Airborne Laser Scanning              7         ch      wv F   : os    fe
     data captured in 2010.           ee aw        ee ke        Pa          .
     inundation depths are             Fe           3 Beene ocore ar)     ae
     derived from water levels                      “a }  :    s          ‘
                ;                             ao              ca            }
     that do notinclude any                  F i              *.,         ‘ai        i
     freeboard allowance.                    rs              | *        “ae
                                                           ieee          Xx   es      eee
                                                            —         a    me   «    ie       Bay)
                                                           NT Tanah           iS) he
                                                       eM                 |                  "
                   Pea 2   :     ‘                     rae Be. Ps                  PP      ie
                      ee                               fee     ee t ioe      —!     _      eg
                                                          kes: 299 Up Fo _.     =    Bie     ar           7
    .          gle>                                        alekf   ihe       ich sg         is            Si
                Toe                             5,              FM          VS Goh i          bic MA
               nee                                 .             pera:       Py |) 2            Maalbeach
   —    \ Gey”                                  |               a                         “.           oe
      Pile        NT                wa                            a             ee                   ie:
         ea   eT               ,                 ,                    ,         ™               ,     =
                ORO                                                                              RY   te
               fi             rae                  "   ;     x    o            r     iWeyba) i        rf

                                    ae         .     s              3               Peregian Beach |
                                                  -                  5               oan ee
                             «      : Ps    =                                 3      Be ws a      i
  :        ay                                                                      % a   ee       iy

Title:                                                                                                         Figure:                      Rev:
 Present Day Planning Horizon Coincident Catchment                                                              B-1                          A
 Flooding & Storm Tide Inundation Peak Depth
                                                                                                                   if
 BMT WBM endeavours to ensure that the information provided in this                                              We
 map is correct at the time of publication. BMT WBM does not warrant, N Okm          4               8          ty CDs
 guarantee or make representations regarding the currency and     a                                             ve mek
 accuracy of information contained in this map.          / \                 Scale - Main Map                    ‘a       BMT \WBM
  >curac  i                                                                            Fi                         wel
                                                                                                                           www.bmtwbm.com.au
 Filepath: |:\B22613.i.mbp.Noosa_CHAS\DRG\COA_015_170802_Coincident_StormTide_and_Flooding_Present_Day.wor

Section 48

:                                             P ioe %                                       ereyole My Ti ¢4)
                        i                                                 Si                      :                Data SIO, NOAA, U.S. Navy,
           a     “4    fi,                                            Ft                                           NGA, GEBCO
          s         ye                                                    ne                                       image © 2017 DigitalG lobe
      peed                   js                          ;            me    7                   p                  image © 2017 CNES / Airbus
    §                          ;            .                      Pee   Al                    <
     \      _ “y ‘                             ad  if         .            4
     :                                                            =    " ot                    ;
      -             a       ff                      :                   { . 4            A   y
        ———-        A                          :    ,         ro          a3
                        y                                 .              |.
                           a                                 .              aa             r
    LEGEND                                              ake'Como}
           Noosa Shire                                     si 7              }
           LGA Boundary                                  p. *
    ——— Noosa River                           ,      eo                            »
                                               -        -*                  q        *
   —— Urban Model Extent                      x   ~~                         |
                     n                                 ,                        F
       Peak Flood Depth (m)                           ,                         my
               0.0 to 0.5                                    oe
                                                  i
          —0.5to 1.0                       Po                                  ‘
               1.0 to 1.5                 i)                                     _—
               1.5 to 2.0                b          en                         :
               2.0 to 2.5                 ee       ee borcen                    ail
               2.5 to 3.0         =                                        pe
               3.0 to 3.5              =    fs                             *        |
               3.5 to 4.0            “    re                             a
               4.0 to 4.5          >   Pre                            a
               4.5 to 5.0              PA                        @a:
              >5.0                         nie                    =
     Hazard extentderived                    a           p>! ,            5
     using methods described                    2       3    Par          ‘       ,
     in WMA Water (2017) and               a               ae    ee        Saad
     Airborne Laser Scanning             bj        < iy   sn     oe       1 if
       .                  ‘                  .        :    Fu     aA        aa
     data captured in 2010.             | = ee       ae         5          ;
     inundation depths are            Fes          é A eee   Oreo aly   ff
     derived from water levels               “ails a     ys  a:           ?
     that do notinclude any                   i             4,             a        x
     freeboard allowance.                    é "           (|            —          a LN
                                                        ee dy          Pi                  eau)
                                                             Geta  ew AO       oe   -        Bays
                                                           i ie Or3.0%             cal
               “A         53                            ee  a ae ae            ~~       Sa
                  Lo       gee                               Soaare                           Geis
    S              :                                   eee or ard, eae 1) bene |            ee         ss
     ‘         5             .                  ;             Ce    he     Ac Ss ‘e        Tink    ieee
        Wet       ts                                                 ee =                     aeBeach |
        RN   Se                                        ea                   OP          Se
       es         La                gt ie                       Pe     ee                  a         as

         :                                   |               oe             i.              :
                                  oe          {           oe                  y                  3,
                                         5            :       ;       ,        rier        a    ve

                                ae.           .     .             SF               Peregian|Beach

         are      -          m                                                     trang        i
Title:                                                                                                       Figure:                     Rev:
 2070 Planning Horizon Coincident Catchment Flooding                                                         B-3                          A
 & Storm Tide Inundation Peak Depth
                                                                                                                 if
 BMT WBM endeavours to ensure that the information provided in this                                           We
 map is correct at the time of publication. BMT WBM does not warrant, N Okm        4               8          ty G2:
 guarantee or make representations regarding the currency and       ———                                       Me  ms
 accuracy of information contained in this map.         / \                Scale - Main Map                    ‘a      BMT \WBM
  >curac  i                                                                          Fi                        wal
                                                                                                                         www.bmtwbm.com.au
 Filepath: |:\B22613.i.mbp.Noosa_CHAS\DRG\COA_013_170802_Coincident_StormTide_and_Flooding_2070.wor

Section 49

?                       :                                               f i}                                            Google™earth
                         i                                               *     1                       ,                 Data SIO, NOAA, U.S. Navy,
           -       ef   fi,                                               Pl                                             NGA, GEBCO
          s          ye                                                 F a     a                     !                  Image © 2017 DigitalG lobe
      peed                    js                            ;             a                          p                   image © 2017 CNES/ Airbus
    §                            ,            .                       a      in|
     i                                                               -     } me                     P
     \       — “™     ‘                          ad   ai          ¥
      —              *     i                           :    ais             6                ae
         a           A                           Ys   yi         3           3
                           ng                                                7          x     F
                          , od                                 ;
                            sr                                  7                 >             r
    LEGEND                                               Make\Como)               1
            Noosa Shire                                       a   ae              d
            LGA Boundary                                   y.” ™                 li
                                                     "       Ao                 4
    ——— Noosa River                           -         —                       {       .
   —— Urban Model Extent                        Z' ba                            ]
                                                  i         b                   4         a

       Peak Flood Depth (m)                           .                             ’    y
 i                                                  F           fifake)
                0.0 to 0.5                                                          |
                0.5 to 1.0                  Pes
                1.0 to 1.5                       +
                1.5 to 2.0                           a                                :
                2.0 to 2.5                  &       ate botcer)                     ft
                2.5 to 3.0          ——                                             wer
                3.0 to 3.5               -   i.                               ual       |
                3.5 to 4.0            :        ~                           ”
                4.0 to 4.5                   4                           é
                4.5 to 5.0               me                         tte’
                >5.0                     |  ea .”                       eas
     Hazard extentderived                      a           ZS. oe             i
     using methods described                    si   we                 ar            :
     in WMA Water (2017) and                        | ool           ig        me  é
    Airborne Laser Scanning                ae         ce sa      7              f
     data captured in 2010.         a               oor ss       A ai          t ss     :
     inundation depths are               a.           i Been Coo cibaiy     Fina
     derived from water levels                       a
     that do not include any                  a :              A             y      :   N
                                               Pa         eet er)              :     im    a   Hagunal
     freeboard allowance.                          ‘2         1]             “—        ol
                                                             ee       eZ          Se
                                                              i We ee              “1h         ON
                            Ng                           a al Ae BEN IG          =,            =
               ve      4                                Farle  ial    eres        .         Sins
                           ,                               ae . OEE Ms £     tae           e Wes  a          .
                  re                 ae           p               VEE         VPS             Velo          ey
        .    peat                                    “             oon           -_       i a      al Beach |
      Fs    ei     aor               eae          oy               ae Si                        at      ’ *
       ss       ve              1                         :        ‘    a          ee              4     FS
    eo  Tae      a | is           J     :     '                  ra  AG 2                         ys      ]
                                    Be          !            Par                  ;                ee
                                           ’                     ;       ;                    ger    a.
                                      .              5               5              :      a        he i

                                  ae.            .    .               SF               Peregian|Beach
                                                                                       OS ae
  ,                                  ae a                                       '       =            &
           &                      uty Sy                                              base           by
                              om                                                       LAE
Title:                                                                                                            Figure:                       Rev:
 2100 Planning Horizon Coincident Catchment Flooding                                                               B-4                           A
 & Storm Tide Inundation Peak Depth
                                                                                                                       if
 BMT WBM endeavours to ensure that the information provided in this                                                  en
 map is correct at the time of publication. BMT WBM does not warrant, N Okm            4                8          ty Cas
 guarantee or make representations regarding the currency and           ———                                        Me   ms
 accuracy of information contained in this map.            / \                 Scale - Main Map                     ‘a       BMT \WBM
  >curac  i                                                                              Fi                          wel
                                                                                                                               www.bmtwbm.com.au
 Filepath: |:\B22613.i.mbp.Noosa_CHAS\DRG\COA_012_170802_Coincident_StormTide_and_Flooding_2100.wor

Section 50

;                                                                                                                                  Google™ earth
  R                        x                                                                                                         Data SiO, NOAA, U.S. Navy,
                    oat   A\                                                                                                         Mey Mers-lec)
            ee         ~ }                                                                                                           image © 2017 DigitaiGlobe
      ee                         r                                                                              :                    image © 2017 CNES / Airbus
      1            '                                    ; —                                                  ,
      ay           NA          7                                                                %          ,
       —_             we                              »
                             i /                                                4                "a     A  t
                                                                            hee                            j
     LEGEND                                                      ake\Coro *                  ‘oolocla   |!
     pa] Noosa Shire                                                          y   a                     i
             LGA Boundary                                                     ~                       FH
             Noosa River                                   ;          See 2 A                        an i
                                                                               ad                 i   i
                                                                   f                                ar,
               .                               .                                        oy.          fl
        Peak Flood Depth (m)                                      ee                               /
                                                              i}                           b      rf
                                                            i                                      i
 1               0.0 to 0.5                                Fs
  :              0.5 to 1.0                                4           ee
                 4.0 to 1.5                              7        ‘Cootharaba        am
                 1.5 to 2.0                               3                           iil       »Teewah
                 2.0 to 2.5                               Ye                        ee           :
                 2.5 to 3.0                                5-.Boreen               i             |
                 3.0 to 3.5                 a         ee                          r             ;
                 3.5 to 4.0                  ;        4                                         {
                 4.0 to 4.5                           ;                    gi
                 4.5 to 5.0                            x           a                           t
                 >5.0                             ee
      Hazard extentderived                             _. a     eas ae
      using published tidal                            Pe     S              ea)
     planes, sea-levelrise                                   a           :     me
      allowance and Airborne                                 '          | di 1s    a            ;
      Laser Scanning data                                   a    ee         mics                \
      captured in 2016.                   Le               ga            Pag                     ‘
      inundation depths are                 '        See ae              ota        ac           it
      derived from water levels                 -     :        a       x        g         ;       7
      that do not include any                 5          ae             a                         N
      freeboard allowance.                               7           i BY          es              :     a
                                                                    ces. “San
                                                                          . eat,                   fe   meey,
               ,                                                           Peat   isc                  e's.

                      ss         Bes                                 Pep ss    t     Een mene ty          ae ae        ' |
                 we                      aa                              Cro fy      Re                   ip MO
                                                                         Pb,            be otk Tn aa   4   J
                  7    .                                                Pi    ee  ee   perm        Qe gel re,       =   :

       ?    CUES                         Sods                                      od a               Pa          ie 8
             Sie             :             ,           oF                           s        aa                    a

                                               re                                ,         F   —              ene
                             ¥   € toy                                   ;                     ,                |
  ;         a                                                                                 ms!  a ;         FH
                                                                                                Aa             |
Title:                                                                                                                        Figure:                         Rev:
 2040 Planning Horizon Permanent Inundation due to Sea                                                                        E-1                              A
 Level Rise
                                    i.      '      sara   2                                                                     PAO
 BMT WBM endeavours to ensure that the information provided in this                                                            Le
 map is correct at the time of publication. BMT WBM does not warrant, N       Okm               4                 8           if
 guarantee or make representations regarding the currency and                a                                                %     :
 accuracy of information contained in this map.                                        Scale - Main Map                        vias      BMT             WBM
                                                                                                                                           www.bmtwbm.com.au
 Filepath: 1\B22613.i.mbp.Noosa_CHAS\DRG\COA_017_170803_SLR_2040.wor

Section 51

;                                                                                                                      Google™ earth
  )                      y                                                                                               Data SIO, NOAA, U.S. Navy,
                  oat   A                                                                                                NGA, GEBCO
           ee        ~                                                                                                   image © 2017 DigitaiGlobe
    e                         ‘                                                                       ;                  image © 2017 CNES / Airbus
     1           '                                 pe                  }
      —           NB         ff                                          :              A         ‘|
      Xu  a          A                           2
                           ig                                           g                     A

                                                             cam   WA Sy      LakelCoolcoiayam
    LEGEND                                                 akelGomo,    < b                     j
   ipa] Noosa Shire                                                i     Ae er                 i
            LGA Boundary                                                 Sg                  f
            Noosa River                             Ea       eg           J   q        Rr    I
                                                           ‘            va               rm i
                                                                        el                   {
                   aio                                                                     ii
                                           -                                     ‘          |
       Peak Flood Depth (m)                               a                               |
                                                         a                               a
 ‘1            0.0 to 0.5                             f         io                        i
               0.5 to 1.0                                        one.             ;       ,
               4.0 to 1.5                                   ‘Cootharaba          il
               1.5 to 2.0                                                       :      :
               2.0 to 2.5                              =                         .      Teguon
               2.5 to 3.0                             p= Boreen               A         f
               3.0 to 3.5               ee      ee |                        ,
               3.5 to 4.0                7      r.                         4           j
               4.0 to 4.5                                             vr
               4.5 to 5.0                      a              ee
              >5.0                           aa    /           ee                      ;
     Hazard extentderived                          eae          es
     using published tidal                                     ia                      5
     planes, sea-levelrise                              i         oe    p ¥ i          ,
     allowance and Airborne                           ie      a dee
     Laser Scanning data                               ee:           ac)
     captured in 2016.                 Le             ge      C   yan
     Inundation depths are              5       Mee a rags cibah                        \
     derived from water levels             :      -        .     5       “re            iy
     that do notinclude any                     ie              ~        oy               N
     freeboard allowance.                           ie}      ee        * CY
             3                                                        ae       iy        ?      ts
               i*   ae                                       PE i)       we        MB         BE,
                 }            wis                               ek   soe     Ptr oe eee Pa
    .               ‘                                             ances %      ie Pe ne al   SD           “  be®
                            :    -     oe         .             Bit any    ge   A Pot elites neal a    Pie
             Roe                     :                              Lake       ae SN          Aaa   eine)
            cs                                                   IDoonelia) fe             ae    oe  Beooih
           Boo ole                               Ma       ee           f    BS            NSS a2
                he. Ae                                            ;               )                       fs
         p                                                             Py               Wane             .

               |              pape                                 |                   ee i

  ,                           ;         FE                                            %,   a '      ra
                                                                                        A            |
Title:                                                                                                            Figure:                       Rev:
 2070 Planning Horizon Permanent Inundation due to Sea                                                             E-2                           A
 Level Rise
                                 ,      ;     baba                                                                   sre
 BMT WBM endeavours to ensure that the information provided in this                                                 “Ue
 map is correct at the time of publication. BMT WWBM does not warrant, N Okm           4                8          if
 guarantee or make representations regarding the currency and      a                                               ™
 accuracy of information contained in this map.                                Scale - Main Map                      =       BMT WBM
                                                                                                                               www.bmtwbm.com.au
 Filepath: 1\B22613.i.mbp.Noosa_CHAS\DRG\COA_018_170803_SLR_2070.wor

Section 52

:                       :                                                                               i               Google™ earth
  '                      x                                                                                               for CRS OM (0-1 MRM -La
                  nag   fi,                                                                                              NGA, GEBCO
           ee        ae /                                                       3                      i                 image © 2017 DigitalGlobe
      cel                     .                            a                  7                       /                  image © 2017 CNES / Airbus
    §                            .                                      De ce }                     ;. /
     4                                               ,                vs                            ff
      '    -                                     ox    4              a                            j
      =              a.    ae                          a                4                         yy
                       ‘  ae                                            :               -    \     {

                                                              .   “i  a        <a
                                                             am     QW . LakelCoolcola)
    LEGEND                                                  ake Como      ee hy 7
            Noosa Shire                                             ai.         r
            LGA Boundary                                                   a §
                                                                 =    es. Se 4              .
    ——— Noosa River                                 oy          ee Cg a                 Ss
                                                                                |
                                                             cf                   ,        |
       Peak Flood Depth (m)                               va                               f
                                                        al                         i]    J Hi
 ri            0.0 to 0.5                                                         o       :
  :           0.5 to 1.0                                        pak,            ee       f
               1.0 to 1.5                                                    ae
               1.5 to 2.0                                                    ae  ;     od
               2.0 to 2.5                              .                     ¥          vo
               2.5 to 3.0                    .         7 Boreen                 4       |
               3.0 to 3.5                  es                              Fs          }
               3.5 to 4.0                                         ~—S
               4.0 to 4.5                                       yl                     ,
               4.5 to 5.0                         >      -           ¥                 ,
               >5.0                           re < c       oo aad                      |
     Hazard extentderived                       A  wae. = on —                         |
     using published tidal                        = aN .       .            a
     planes, sea-levelrise                          iE          ne         4
     allowance and Airborne                           v             Be    \ oo  -      {
     Laser Scanning data                              ,     y            >   ae        ;
     captured in 2016.                 Le             Ge C        i
     Inundation depths are              .           eee       one ue        he          :
     derived from water levels             :     a         :    x         <
     that do notinclude any               3         ae          NS   ~~
     freeboard allowance.                           =          ; a “4        -

                    a       ;                               &        ; ys ep Ms        Rides i:
                 a     )          ,                           Pk     PEN          SP      Dp  eres
 4             i”                                              dicate    ta, So Le ol toon: a
    :          ai             ‘                                ee      Oh             ok                       |
              A:          BE         ok           .             é   Bn             eS be?          “Sunshine
                 t Se         :                                   Ped RR        ee              a       Fh

             ag                                           ;           Pers   mE Y PASS
         ar   NS     3          “                 E       i                      LS +              1      N
          ao    BN                                                d  te,                feta     a       Pa
    ae           oe                     ;                            hg.
                                        -               a il  ; a               ;  le,         a q     i

                                  ane      :     :    :                                Peregian|Beach\ |
                                                                                       CON           ae
  ;        ie                        sot     Oe                                 .     ~ Eee          My
                              a                                                         ee       2
Title:                                                                                                            Figure:                       Rev:
 2100 Planning Horizon Permanent Inundation due to Sea                                                             E-3                           A
 Level Rise
               /                 .            ;      ;                                                               sie
 BMT WBM endeavours to ensure that the information provided in this                                                We oo
 map is correct at the time of publication. BMT WBM does not warrant, N Okm            4                8          (   Oy
 guarantee or make representations regarding the currency and              a ____                                  Me
 accuracy of information contained in this map.            / \                 Scale - Main Map                     a        BMT WBM
  >curac’ i                                                                               =                          a SF,
                                                                                                                               www.bmtwbm.com.au
 Filepath: 1\B2261 3.i.mbp.Noosa_CHAS\DRG\COA_019_170803_SLR_2100.wor

Section 53

Noosa Shire Council Climate Change Adaptation Plan: Project Summary   B-1
Detailed Risk Assessment




Appendix B               Detailed Risk Assessment




G:\Admin\B22613.g.mpb.Noosa_CHAS\R.B22613.005.01.Phase 7.docx

Section 54

                                                                                                                                                          Consequence                                      Risk Level
                                                   Hazard    Event/ Planning                              Existing        Likelihood of                                                    Combined
 Asset Name          Location      Asset Type                                   Impacted Assets                                                             Environ-                                        Adaptive
                                                    Type        Horizon                                   Controls         the Hazard     Community                        Council        Consequence
                                                                                                                                                             mental                                         Capacity
                       [ PB1]                                     Now                                                       Unlikely      Insignificant   Insignificant   Insignificant    Insignificant      Low
                                                                                    No impact
                     Peregian                                     2040                                                      Unlikely      Insignificant   Insignificant   Insignificant    Insignificant      Low
                       Beach                                      2070                                                      Unlikely      Insignificant   Insignificant   Insignificant    Insignificant      Low
  Residential
                      south of
  properties
                    surf club –     Detached
Peregian Beach                                                                                         Vegetated dune
                       east of    Housing, a few   Erosion
    (Single,                                                                                               buffer,
                     Plover St,    townhouses                                  28 lots impacted; 28
   detached                                                       2100                                                      Unlikely       Moderate       Insignificant    Moderate         Moderate        Medium
                    Shearwater                                                         partial
   housing)
                      St, and
                      Lorikeet
                        Drive
                                                                  Now              Beach access                             Unlikely      Insignificant   Insignificant   Insignificant    Insignificant      Low
                                                                  2040             Beach access        Vegetated dune       Unlikely      Insignificant   Insignificant   Insignificant    Insignificant      Low
                      Lot 6        Open Space/                                    Car park, beach       buffer, coastal
  Victory Park                                     Erosion        2070                                                      Unlikely         Minor        Insignificant      Minor            Minor           Low
                    CP864962        Recreation                                         access            building line/
                                                                                  Car park, beach      building setback
                                                                  2100                                                      Unlikely         Minor        Insignificant    Moderate         Moderate        Medium
                                                                               access, park shelters
                                                                  Now          SLSC tower & beach                           Unlikely        Minor         Insignificant     Minor            Minor           Low
                                                                  2040                 access                               Unlikely       Moderate       Insignificant    Moderate         Moderate        Medium
                                                                                                       Vegetated dune
                                                                  2070           Playground, skate                          Unlikely        Major         Insignificant     Major            Major           High
                     Lot 159       Open Space/                                                          buffer, coastal
 Peregian Park                                     Erosion                        park, pathways,
                    CP839188        Recreation                                                           building line/
                                                                                SLSC tower, public
                                                                  2100                                 building setback     Unlikely         Major        Insignificant      Major            Major          High
                                                                                amenities, & beach
                                                                                       access
                                                                  Now                No impact                              Unlikely      Insignificant   Insignificant   Insignificant    Insignificant      Low
                                                                                 Minor operational
                                                                  2040              impact (SLS        Vegetated dune       Unlikely         Minor        Insignificant      Minor            Minor           Low
                     Lot 165        Community                                         services)         buffer, coastal
Peregian SLSC                                      Erosion
                    MCH5180          Services                                  Moderate operational      building line/
                                                                  2070                                                      Unlikely       Moderate       Insignificant    Moderate         Moderate        Medium
                                                                               impact (SLS services    building setback
                                                                                  SLSC Building
                                                                  2100                                                      Unlikely         Major        Insignificant      Major            Major          High
                                                                                 heavily impacted
                                                                  Now              Coastal dunes                            Unlikely         Minor           Minor           Minor            Minor           Low
                                                                  2040                                                      Unlikely         Minor           Minor           Minor            Minor           Low
Peregian Beach                                                                 Peregian Beach Car
    (beach,                                                                    Park/ toilet, coastal
                    Unallocated    Open Space/
vegetated dunes                                    Erosion                      dune vegetation &            Nil
                    State Land     Conservation                   2070                                                      Unlikely       Moderate        Moderate        Moderate         Moderate        Medium
 and foreshore                                                                   beach access.
   reserve)                                                                     Partial loss of high
                                                                                  use foreshore
                                                                  2100                                                      Unlikely         Major         Moderate          Major            Major          High
                      North &       Stormwater,                   Now           Pipes, pits, poles,                         Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
     Mixed
                      South        water supply,                  2040         pumps, low voltage.     Vegetated dune       Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
 infrastructure                                    Erosion
                     Peregian     sewage, energy                  2070          Sewage impacted            buffer           Unlikely       Moderate       Insignificant    Moderate         Moderate        Medium
    networks
                      Beach         and lighting                  2100            first and most                            Unlikely        Moderate      Insignificant      Major            Major          High
 Road network                                                     Now                                                       Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                     North &
  (Particularly                                                   2040           Road surfaces,                             Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                      South                                                                            Vegetated dune
 Osprey Ave.,                      Road reserve    Erosion        2070            guttering, and                            Unlikely         Minor        Insignificant      Minor            Minor          Low
                     Peregian                                                                              buffer
 Pitta St., Piper                                                               adjacent pathways
                      Beach                                       2100                                                      Unlikely         Minor        Insignificant      Minor            Minor           Low
       St)
                                                                  Now                                                       Unlikely        Minor           Minor           Minor            Minor           Low
                                                                                 Coastal dunes &
                    Unallocated    Open Space/                    2040                                                      Unlikely        Minor           Minor           Minor            Minor           Low
 Marcus Beach                                      Erosion                        foreshore (low             Nil
                    State Land     Conservation                   2070                                                      Unlikely        Minor           Minor           Minor            Minor           Low
                                                                                     visitation)
                                                                  2100                                                      Unlikely       Moderate        Moderate        Moderate         Moderate        Medium
  Castaways          Lot 159       Open Space/     Erosion        Now           Dune vegetation,       Vegetated dune       Unlikely        Minor           Minor           Minor            Minor           Low
    Beach           CP839188;      Conservation                   2040         with mostly informal        buffer           Unlikely        Minor           Minor           Minor            Minor           Low
  Foreshore                                                       2070           access. 2 small                            Unlikely       Moderate        Moderate        Moderate         Moderate        Medium
   Reserve                                                        2100              boardwalk                               Unlikely       Moderate        Moderate        Moderate         Moderate        Medium
                                                                                  areas/carparks

Section 55

                                                                                                                                                          Consequence                                      Risk Level
                                                  Hazard    Event/ Planning                               Existing        Likelihood of                                                    Combined
 Asset Name        Location      Asset Type                                    Impacted Assets                                                             Environ-                                         Adaptive
                                                   Type        Horizon                                    Controls         the Hazard     Community                         Council       Consequence
                                                                                                                                                            mental                                          Capacity
Castaways Park      LotPlan      Open Space/      Erosion        Now              Footpaths,           Vegetated dune       Unlikely         Minor          Minor           Minor            Minor           Low
                  105MCH80       Conservation                    2040             Boardwalk,           buffer and David     Unlikely         Minor          Minor           Minor            Minor           Low
                    7481 &                                       2070             vegetation               Low Way          Unlikely         Minor          Minor           Minor            Minor           Low
                  89MCH540                                       2100                                                       Unlikely         Minor          Minor          Moderate         Moderate        Medium
                       1
     Mixed        Castaways       Stormwater,     Erosion        Now           Small number of         Vegetated dune       Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
 infrastructure    Beach –      sewage, energy                   2040          pipes, pits, poles,         buffer           Unlikely      Insignificant   Insignificant      Minor            Minor          Low
    networks      adjacent to     and lighting                   2070         pumps, low voltage.                           Unlikely         Minor        Insignificant    Moderate         Moderate        Medium
                  David Low                                      2100                                                       Unlikely       Moderate       Insignificant    Moderate         Moderate        Medium
                     Way
David Low Way     Castaways     Council-owned     Erosion        Now           Major road access       Vegetated dune       Unlikely      Insignificant   Insignificant   Insignificant    Insignificant      Low
                    Beach        infrastructure                                 near Burgess Ck            buffer
                                                                 2040          Pathways adjacent                            Unlikely         Minor        Insignificant    Moderate         Moderate        Medium
                                                                              to carpark impacted
                                                                 2070         Whole section DLW                             Unlikely         Major        Insignificant      Major            Major          High
                                                                                   and carpark
                                                                 2100          Major road access                            Unlikely         Major        Insignificant   Catastrophic    Catastrophic     Very High
                                                                                near Burgess Ck,
                                                                                 partially isolates
                                                                                   Castaways
                                                                                 residential area
David Low Way       Sunrise     Council-owned     Erosion        Now           Major road access       Vegetated dune       Unlikely      Insignificant   Insignificant   Insignificant   Insignificant      Low
                     Beach       infrastructure                  2040           near Burgess Ck,           buffer           Unlikely         Major        Insignificant   Catastrophic    Catastrophic     Very High
                  approachin                                     2070         isolates Castaways                            Unlikely         Major        Insignificant   Catastrophic    Catastrophic     Very High
                   g Burgess                                     2100            residential area                           Unlikely         Major        Insignificant   Catastrophic    Catastrophic     Very High
                       Ck
     Mixed          Sunrise       Stormwater,     Erosion        Now           Small number of         Vegetated dune       Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
 infrastructure     Beach –     sewage, energy                   2040          pipes, pits, poles,         buffer           Unlikely      Insignificant   Insignificant      Minor            Minor          Low
    networks       David Low      and lighting                   2070         pumps, low voltage.                           Unlikely         Minor        Insignificant    Moderate         Moderate        Medium
                      Way                                        2100                                                       Unlikely       Moderate       Insignificant    Moderate         Moderate        Medium
Orient Bushland     LotPlan      Open Space/      Erosion        Now              Vegetation,          Vegetated dune       Unlikely         Minor           Minor           Minor            Minor          Low
Reserve South     6N21840 &      Conservation                    2040             boardwalk            buffer and David     Unlikely         Minor           Minor           Minor            Minor          Low
                  211RP1353                                      2070                                      Low Way          Unlikely         Minor           Minor           Minor            Minor          Low
                       63                                        2100                                                       Unlikely         Minor           Minor         Moderate         Moderate        Medium
 Residential         [SrB1]     Predominantly     Erosion        Now           No lots impacted        Vegetated dune       Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
  properties         Orient       detached                       2040          No lots impacted         buffer, coastal     Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
Sunrise Beach         Drive        housing                       2070             1 lot partially        building line/     Unlikely         Minor        Insignificant   Insignificant       Minor          Low
 (multi-res &                                                                       impacted           building setback
  detached)                                                      2100          5 lots impacted; 4                           Unlikely       Moderate       Insignificant      Major            Major          High
                                                                                partial, 1 full lots

Section 56

                                                                                                                                                            Consequence                                      Risk Level
                                                    Hazard    Event/ Planning                               Existing        Likelihood of                                                    Combined
 Asset Name       Location        Asset Type                                     Impacted Assets                                                              Environ-                                        Adaptive
                                                     Type        Horizon                                    Controls         the Hazard     Community                         Council       Consequence
                                                                                                                                                               mental                                         Capacity
 Residential         [SrB3]      Predominantly      Erosion        Now            No lots impacted       Vegetated dune       Unlikely      Insignificant   Insignificant   Insignificant    Insignificant      Low
  properties       Tingira St      detached                        2040             Approx.4 lots         buffer, coastal     Unlikely         Minor        Insignificant   Insignificant       Minor           Low
Sunrise Beach     (north end)       housing                                      (approx. 1 full lots      building line/
 (multi-res &                                                      2070         Approx. 5 lots (incl.    building setback     Unlikely       Moderate       Insignificant      Major            Major          High
  detached)                                                                      approx. 2 full lots)
                                                                   2100         Approx. 8 lots (incl.                         Unlikely         Major        Insignificant   Catastrophic    Catastrophic     Very High
                                                                                 approx. 5 full lots)
 Residential         [SrB2]        Detached                        Now            No lots impacted       Vegetated dune       Unlikely      Insignificant   Insignificant   Insignificant    Insignificant      Low
  properties       Tingira St       housing                        2040          7 lots impacted; 7       buffer, coastal     Unlikely         Minor        Insignificant   Insignificant       Minor           Low
Sunrise Beach                                                                        partial lots          building line/
                  (south end)
 (multi-res &                                                      2070         11 lots impacted; 6      building setback     Unlikely         Major        Insignificant      Major            Major          High
  detached                                                                        partial, 5 full lots
                                                                   2100         Approx. 11 lots (incl.                        Unlikely         Major        Insignificant   Catastrophic    Catastrophic     Very High
                                                                                approx. 11 full lots)
     Mixed          Sunrise       Stormwater,       Erosion        Now           Pipes, pits, poles,     Vegetated dune       Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
 infrastructure      Beach       water supply,                     2040         pumps, low voltage.          buffer           Unlikely         Minor        Insignificant    Moderate         Moderate        Medium
    networks        Beach –     sewage, energy                     2070                                                       Unlikely         Minor        Insignificant    Moderate         Moderate        Medium
                   Tingira &      and lighting                     2100                                                       Unlikely       Moderate       Insignificant      Major          Moderate         High
                  Sobraon St
 Road network       Sunrise      Road reserve       Erosion        Now             Road surfaces,        Vegetated dune       Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                    Beach –                                        2040             guttering, and           buffer           Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                   Tingira &                                       2070         adjacent pathways.                            Unlikely      Insignificant   Insignificant      Minor            Minor          Low
                  Sobraon St                                       2100          Partially impacted.                          Unlikely      Insignificant   Insignificant    Moderate         Moderate        Medium
  Residential     [SB1] Ross     Predominantly      Erosion        Now            No lots impacted       Vegetated dune       Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
   properties         Cr &         detached                        2040          2 lots impacted; 2          buffer           Unlikely         Minor        Insignificant   Insignificant       Minor          Low
Sunshine Beach     Adams St         housing                                              partial
  (multi-res &                                                     2070          3 lots impacted; 3                           Unlikely       Moderate       Insignificant      Minor          Moderate        Medium
   detached)                                                                             partial
                                                                   2100         12 lots impacted; 3                           Unlikely         Major        Insignificant      Major            Major          High
                                                                                   full lot, 9 partial
     Mixed        Sunshine        Stormwater,       Erosion        Now           Pipes, pits, poles,     Vegetated dune       Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
 infrastructure   Beach –        water supply,                     2040         pumps, low voltage.          buffer           Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
    networks      Ross Cr       sewage, energy                     2070                                                       Unlikely      Insignificant   Insignificant    Moderate         Moderate        Medium
                                  and lighting                     2100                                                       Unlikely      Insignificant   Insignificant    Moderate         Moderate        Medium
 Road network     Sunshine       Road reserve       Erosion        Now           Road surfaces,          Vegetated dune       Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                  Beach –                                          2040           guttering, and             buffer           Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                  Ross Cr                                          2070         adjacent pathways                             Unlikely      Insignificant   Insignificant    Moderate         Moderate        Medium
                                                                   2100                                                       Unlikely      Insignificant   Insignificant    Moderate         Moderate        Medium
  Residential     [SB3] Park    Predominantly       Erosion        Now           3 lots impacted; 3      Vegetated dune       Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
   properties     Cr & Webb       detached                                              partial           buffer, coastal
Sunshine Beach        Rd        housing, some                      2040          11 lots impacted;6        building line/     Unlikely         Major        Insignificant      Major            Major          High
  (multi-res &                  multi-unit resi                                     partial, 5 full      building setback
   detached)                      and tourist                      2070         16 lots impacted; 6                           Unlikely      Catastrophic    Insignificant   Catastrophic    Catastrophic     Very High
                                    accom                                        partial, 10 full lots
                                                                   2100         19 lots impacted; 3                           Unlikely      Catastrophic    Insignificant   Catastrophic    Catastrophic     Very High
                                                                                   partial, 16 full
  Residential       [SB4]       Mostly detached     Erosion        Now            No lots impacted       Vegetated dune       Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
   properties      Belmore      residential, plus                  2040           No lots impacted         buffer and         Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
Sunshine Beach      Tce &       major multi-unit                   2070          8 lots impacted; 8         minimum           Unlikely       Moderate       Insignificant   Insignificant     Moderate        Medium
  (multi-res &    Stevens St     tourist accom                                          partial             setbacks
   detached)                                                       2100         11 lots impacted; 7                           Unlikely         Major        Insignificant   Catastrophic    Catastrophic     Very High
                                                                                  partial, 4 full lots
     Mixed        Sunshine        Stormwater,       Erosion        Now           Pipes, pits, poles,     Vegetated dune       Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
 infrastructure   Beach –        water supply,                     2040         pumps, low voltage.          buffer           Unlikely      Insignificant   Insignificant    Moderate         Moderate        Medium
    networks      Belmore       sewage, energy                     2070                                                       Unlikely       Moderate       Insignificant      Major            Major          High
                    Tce           and lighting                     2100                                                       Unlikely         Major        Insignificant      Major            Major          High
 Road network     Sunshine       Road reserve       Erosion        Now           Road surfaces,          Vegetated dune       Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                  Beach –                                          2040           guttering, and             buffer           Unlikely         Minor        Insignificant    Moderate         Moderate        Medium
                  Belmore                                          2070         adjacent pathways                             Unlikely       Moderate       Insignificant      Major            Major          High
                    Tce                                            2100                                                       Unlikely       Moderate       Insignificant      Major            Major          High

Section 57

                                                                                                                                                                 Consequence                                      Risk Level
                                                        Hazard    Event/ Planning                                Existing        Likelihood of                                                    Combined
 Asset Name         Location         Asset Type                                      Impacted Assets                                                               Environ-                                        Adaptive
                                                         Type        Horizon                                     Controls         the Hazard     Community                         Council       Consequence
                                                                                                                                                                    mental                                         Capacity
  Residential        [SB5]          Predominantly       Erosion        Now          11 lots impacted; 11      Vegetated dune       Unlikely       Moderate       Insignificant    Moderate         Moderate        Medium
   properties      Esplanade,      detached resi,,                                        partial lots         buffer, coastal
Sunshine Beach     & Arakoon       with some multi-                    2040          20 lots impacted; 9        building line,     Unlikely         Major        Insignificant   Catastrophic    Catastrophic     Very High
  (multi-res &        Cres          unit resi/tourist                                 partial, 11 full lots      with small
   detached)                             accom                         2070          22 lots impacted; 3      building setback     Unlikely      Catastrophic    Insignificant   Catastrophic    Catastrophic     Very High
                                                                                      partial, 19 full lots        section
                                                                       2100          24 lots impacted; 8                           Unlikely      Catastrophic    Insignificant   Catastrophic    Catastrophic     Very High
                                                                                      partial, 22 full lots
     Mixed         Sunshine          Stormwater,        Erosion        Now            Pipes, pits, poles,     Vegetated dune       Unlikely      Insignificant   Insignificant    Moderate         Moderate        Medium
 infrastructure     Beach –         water supply,                      2040         pumps, low voltage.           buffer           Unlikely      Insignificant   Insignificant    Moderate         Moderate        Medium
    networks       Esplanade       sewage, energy                      2070                                                        Unlikely       Moderate       Insignificant    Moderate         Moderate        Medium
                    Arakoon          and lighting                      2100                                                        Unlikely       Moderate       Insignificant     Major            Major           High
                      Tce
 Road network      Sunshine         Road reserve        Erosion        Now            Road surfaces,          Vegetated dune       Unlikely        Minor         Insignificant   Insignificant    Insignificant     Low
                    Beach –                                            2040            guttering, and             buffer           Unlikely        Minor         Insignificant    Moderate         Moderate        Medium
                   Esplanade                                           2070          adjacent pathways                             Unlikely       Moderate       Insignificant    Moderate         Moderate        Medium
                    Arakoon                                            2100                                                        Unlikely       Moderate       Insignificant      Major            Major          High
                      Tce
  Residential        [SB6]            Detached          Erosion        Now           8 lots impacted; 8       Vegetated dune       Unlikely         Minor        Insignificant    Moderate         Moderate        Medium
   properties       Seaview            housing                                           partial lots          buffer, coastal
Sunshine Beach        Tce                                              2040         18 lots impacted; 8         building line/     Unlikely         Major        Insignificant   Catastrophic    Catastrophic     Very High
  (multi-res &                                                                       partial, 11 full lots    building setback
   detached)                                                           2070         18 lots impacted; 4                            Unlikely      Catastrophic    Insignificant   Catastrophic    Catastrophic     Very High
                                                                                     partial, 14 full lots
                                                                       2100         19 lots impacted; 5                            Unlikely      Catastrophic    Insignificant   Catastrophic    Catastrophic     Very High
                                                                                     partial, 14 full lots
     Mixed         Sunshine          Stormwater,        Erosion        Now           Pipes, pits, poles,      Vegetated dune       Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
 infrastructure     Beach –         water supply,                      2040         pumps, low voltage.           buffer           Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
    networks        Seaview        sewage, energy                      2070                                                        Unlikely         Minor        Insignificant      Minor            Minor          Low
                      Tce            and lighting                      2100                                                        Unlikely         Major        Insignificant      Major            Major          High
 Road network      Sunshine         Road reserve        Erosion        Now            Road surfaces,          Vegetated dune       Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                    Beach –                                            2040            guttering, and             buffer           Unlikely         Minor        Insignificant      Minor            Minor          Low
                    Seaview                                            2070          adjacent pathways                             Unlikely         Minor        Insignificant      Minor            Minor          Low
                      Tce                                              2100                                                        Unlikely         Major        Insignificant      Major            Major          High
  Sunrise &         Lot 159         Open Space/         Erosion        Now            Dune vegetation,        Vegetated dune       Unlikely       Moderate          Minor           Minor          Moderate        Medium
Sunshine Beach     CP839188         Conservation/                                     beach access, &             buffer
  Foreshore                         Road Reserve                                         SLSC tower
   Reserve                                                             2040           Dune vegetation,                             Unlikely         Major          Minor            Major           Major           High
                                                                       2070          dog exercise area,                            Unlikely         Major         Moderate          Major           Major           High
                                                                       2100           beach accesses,                              Unlikely      Catastrophic     Moderate       Catastrophic    Catastrophic     Very High
                                                                                       lookouts, public
                                                                                    amenities, carparks
                                                                                     on Belmont Tce &
                                                                                    Tingira Cres., SLSC
                                                                                            tower
Ed Webb Park &      Lot 126         Open Space/         Erosion        Now              SLSC building         Vegetated dune       Unlikely       Moderate       Insignificant    Moderate        Moderate         Medium
Sunshine Beach     CP845336          Recreation                        2040         SLSC building, car            buffer           Unlikely         Major        Insignificant      Major           Major           High
    SLSC                                                               2070          park, landscaping                             Unlikely         Major        Insignificant   Catastrophic    Catastrophic     Very High
                                                                       2100                                                        Unlikely         Major        Insignificant   Catastrophic    Catastrophic     Very High
Noosa National      Lot 147         Open Space/         Erosion        Now           Very small area of             Nil            Unlikely      Insignificant      Minor        Insignificant      Minor           Low
    Park            NPW889          Conservation                       2040           dune vegetation/                             Unlikely      Insignificant      Minor        Insignificant      Minor           Low
                                                                       2070           unformed paths                               Unlikely      Insignificant      Minor        Insignificant      Minor           Low
                                                                       2100                                                        Unlikely      Insignificant      Minor        Insignificant      Minor           Low
 Noosa North         South of       Open Space/         Erosion        Now              No impact                   Nil            Unlikely         Minor        Insignificant      Minor           Minor           Low
   Shore           third cutting     Recreation                        2040         Campground eastern                             Unlikely         Minor        Insignificant    Moderate        Moderate         Medium
 Campground                                                            2070              edge (no                                  Unlikely       Moderate       Insignificant      Major           Major           High
                                                                       2100           infrastructure)                              Unlikely       Moderate       Insignificant      Major           Major           High
    Teewah            [TW1]          Detached           Erosion        Now              No impact             Vegetated dune       Unlikely      Insignificant   Insignificant   Insignificant   Insignificant      Low
Residential Area     Teewah          Residential                       2040                                       buffer           Unlikely      Insignificant   Insignificant   Insignificant   Insignificant      Low
                    Township                                           2070         20 lots impacted; 20                           Unlikely         Minor        Insignificant      Minor           Minor           Low
                                                                                           partial

Section 58

                                                                                                                                                    Consequence                                      Risk Level
                                              Hazard    Event/ Planning                              Existing       Likelihood of                                                    Combined
Asset Name       Location     Asset Type                                  Impacted Assets                                                             Environ-                                        Adaptive
                                               Type        Horizon                                   Controls        the Hazard     Community                        Council        Consequence
                                                                                                                                                       mental                                         Capacity
                                                             2100         24 lots impacted; 6                         Unlikely         Major        Insignificant      Major            Major          High
                                                                           partial, 18 full lots
  Teewah            The       Open Space/     Erosion        Now            Beach access           Vegetated dune     Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
 Foreshore       Esplanade     Recreation                    2040                                      buffer         Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                             2070                                                     Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                             2100                                                     Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
    Mixed          [TW1]       Stormwater,    Erosion        Now          Minor stormwater         Vegetated dune     Unlikely      Insignificant   Insignificant      Minor            Minor          Low
infrastructure    Teewah      water supply,                  2040          and energy and              buffer         Unlikely      Insignificant   Insignificant      Minor            Minor          Low
   networks      Township    sewage, energy                  2070           lighting assets                           Unlikely         Minor        Insignificant      Minor            Minor          Low
                               and lighting                  2100                                                     Unlikely       Moderate       Insignificant      Minor          Moderate        Medium
Road network       [TW1]      Road reserve    Erosion        Now           Road surfaces,          Vegetated dune     Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                  Teewah                                     2040           guttering, and             buffer         Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                 Township                                    2070         adjacent pathways                           Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                             2100                                                     Unlikely         Minor        Insignificant   Insignificant        Minor         Low

Section 59

                                                                                                                                                           Consequence                                      Risk Level   Potential
                                                   Hazard       Event/ Planning                                Existing   Likelihood of                                                     Combined
 Asset Name        Location      Asset Type                                            Impacted Assets                                                      Environ-                                         Adaptive     Control
                                                    Type           Horizon                                     Controls    the Hazard      Community                        Council        Consequence
                                                                                                                                                             mental                                          Capacity    Options
Lake Cooroibah, Lake Cootharaba and surrounds
                                                               1 in 20 yr ARI Now        1-2 properties                     Possible       Insignificant   Insignificant   Insignificant    Insignificant      Low
                                                                                         10 partial lots
                                                               1 in 100 yr ARI Now                                           Unlikely      Insignificant   Insignificant   Insignificant    Insignificant      Low
                                                                                           impacted
                                                               1 in 500 yr ARI Now       10 partial lots                     Rare          Insignificant   Insignificant   Insignificant    Insignificant      Low
                                                               1 in 20 yr ARI 2040        impacted (3                       Possible       Insignificant   Insignificant   Insignificant    Insignificant      Low
                                                               1 in 100 yr ARI 2040        dwellings)                       Unlikely       Insignificant   Insignificant   Insignificant    Insignificant      Low
                                                  Storm Tide   1 in 500 yr ARI 2040      20 partial lots                     Rare             Minor        Insignificant   Insignificant       Minor           Low
                                                  Inundation                              impacted (3
                     [Coo1]                                    1 in 20 yr ARI 2070                                          Possible          Minor        Insignificant   Insignificant       Minor         Medium
                                                                                           dwellings)
                   McKinnon
  Residential                   Detached resi &                1 in 100 yr ARI 2070                                         Unlikely          Minor        Insignificant   Insignificant       Minor          Low
                      Dr &
properties (Lake                  acreage w/                   1 in 500 yr ARI 2070      25+ partial lots        Nil         Rare             Minor        Insignificant   Insignificant       Minor          Low
                   Tingara Ct
  Cooroibah)                       dwelling                    1 in 20 yr ARI 2100        impacted (3                       Possible          Minor        Insignificant   Insignificant       Minor         Medium
                    136 lots                                   1 in 100 yr ARI 2100        dwellings)                       Unlikely          Minor        Insignificant   Insignificant       Minor          Low
                                                               1 in 500 yr ARI 2100                                          Rare             Minor        Insignificant   Insignificant       Minor          Low
                                                                                          4-5 partial lots
                                                                      2040                                                Almost Certain   Insignificant   Insignificant   Insignificant    Insignificant      Low
                                                                                            impacted
                                                                                          15+ partial lots
                                                  Sea Level           2070                                                Almost Certain      Minor        Insignificant      Minor            Minor         Medium
                                                                                            impacted                                                                                                                     Landward
                                                    Rise
                                                                                          25+ partial lots                                                                                                                building
                                                                      2100               impacted (1 full                 Almost Certain      Minor        Insignificant      Minor            Minor         Medium      relocation
                                                                                            dwelling)
                                                                1 in 20 yr ARI Now                                          Possible       Insignificant   Insignificant      Minor            Minor         Medium
                                                               1 in 100 yr ARI Now                                          Unlikely       Insignificant   Insignificant      Minor            Minor          Low
                                                               1 in 500 yr ARI Now                                           Rare          Insignificant   Insignificant      Minor            Minor          Low
                                                               1 in 20 yr ARI 2040      Electrical assets,                  Possible       Insignificant   Insignificant      Minor            Minor         Medium
                                                               1 in 100 yr ARI 2040   pressure and gravity                  Unlikely       Insignificant   Insignificant      Minor            Minor          Low
                                                               1 in 500 yr ARI 2040            main                          Rare          Insignificant   Insignificant      Minor            Minor          Low
                                                               1 in 20 yr ARI 2070                                          Possible       Insignificant   Insignificant      Minor            Minor         Medium
                                                               1 in 100 yr ARI 2070                                         Unlikely       Insignificant   Insignificant      Minor            Minor          Low
                                  Stormwater,
                                                  Storm Tide   1 in 500 yr ARI 2070                                          Rare          Insignificant   Insignificant      Minor            Minor          Low
                                 sewage, and
                     [Coo1]                                    1 in 20 yr ARI 2100       Few stormwater                     Possible       Insignificant   Insignificant      Minor            Minor         Medium
                                 water supply     Inundation
     Critical      McKinnon                                                            assets, one bridge,                                                                                                    Low
                                and energy and
 infrastructure       Dr &                                                             electricity assets on
                                     lighting
                   Tingara Ct                                  1 in 100 yr ARI 2100   McKinnon Drive and                     Unlikely      Insignificant   Insignificant      Minor            Minor
                                 infrastructure
                                      assets                                          adjacent to the NE of
                                                                                       the neighbourhood
                                                                                         Few stormwater                                                                                                        Low
                                                                                       assets, one bridge,
                                                               1 in 500 yr ARI 2100                                           Rare         Insignificant   Insignificant      Minor            Minor
                                                                                        electricity assets,
                                                                                           gravity main
                                                                       2040              Lighting assets                  Almost Certain   Insignificant   Insignificant      Minor            Minor         Medium
                                                  Sea Level
                                                                       2070           Lighting, stormwater                Almost Certain   Insignificant   Insignificant      Minor            Minor         Medium
                                                    Rise
                                                                       2100                    assets                     Almost Certain   Insignificant   Insignificant      Minor            Minor         Medium
                                                                1 in 20 yr ARI Now                                           Possible      Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                               1 in 100 yr ARI Now                                           Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                               1 in 500 yr ARI Now                                            Rare         Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                               1 in 20 yr ARI 2040                                           Possible      Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                                                                Nil
                                                               1 in 100 yr ARI 2040                                          Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                  Storm Tide   1 in 500 yr ARI 2040                                           Rare         Insignificant   Insignificant   Insignificant    Insignificant     Low
                     [Coo1]                       Inundation   1 in 20 yr ARI 2070                                           Possible      Insignificant   Insignificant   Insignificant    Insignificant     Low
                   McKinnon
 Road network                   Road network                   1 in 100 yr ARI 2070                              Nil         Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                      Dr &
                                                               1 in 500 yr ARI 2070                                           Rare         Insignificant   Insignificant      Minor            Minor          Low
                   Tingara Ct                                                         Possible inundation
                                                               1 in 20 yr ARI 2100                                           Possible      Insignificant   Insignificant      Minor            Minor         Medium
                                                                                      on McKinnon Rd at
                                                               1 in 100 yr ARI 2100                                          Unlikely      Insignificant   Insignificant      Minor            Minor          Low
                                                                                        Cooroibah Ck
                                                               1 in 500 yr ARI 2100                                           Rare         Insignificant   Insignificant      Minor            Minor          Low
                                                                       2040                                               Almost Certain   Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                  Sea Level
                                                                       2070                     Nil                       Almost Certain   Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                    Rise
                                                                       2100                                               Almost Certain   Insignificant   Insignificant   Insignificant    Insignificant     Low

Section 60

                                                                                                                                                            Consequence                                      Risk Level   Potential
                                                    Hazard       Event/ Planning                                Existing   Likelihood of                                                     Combined
 Asset Name         Location      Asset Type                                            Impacted Assets                                                       Environ-                                        Adaptive     Control
                                                     Type           Horizon                                     Controls    the Hazard      Community                        Council        Consequence
                                                                                                                                                               mental                                         Capacity    Options
                                                                1 in 20 yr ARI Now                                           Possible       Insignificant   Insignificant   Insignificant    Insignificant      Low
                                                                1 in 100 yr ARI Now             Nil                          Unlikely       Insignificant   Insignificant   Insignificant    Insignificant      Low
                                                                1 in 500 yr ARI Now                                           Rare          Insignificant   Insignificant   Insignificant    Insignificant      Low
                                                                                         6 partial lots (Lake
                                                                1 in 20 yr ARI 2040                                          Possible       Insignificant   Insignificant   Insignificant    Insignificant      Low
                                                                                           Cooroibah Rd)
                                                                                         9 partial lots (Lake
                                                                1 in 100 yr ARI 2040       Cooroibah Rd,                      Unlikely      Insignificant   Insignificant   Insignificant    Insignificant      Low
                                                                                       Morning Glory Drive)
                   [Coo2] area                                                          11 partial lots (Lake
                    bound by                                    1 in 500 yr ARI 2040       Cooroibah Rd,                       Rare         Insignificant   Insignificant   Insignificant    Insignificant      Low
                      Lake                                                                Morning Glory Dr)
                                                   Storm Tide
                    Cooroibah                                                           12 partial lots (Lake
  Residential                    Detached resi &   Inundation
                    Rd, Johns                                   1 in 20 yr ARI 2070        Cooroibah Rd,                     Possible       Insignificant   Insignificant   Insignificant    Insignificant      Low
properties (Lake    Rd & Lake      acreage w/
                                                                                          Morning Glory Dr)
  Cooroibah)        Cooroibah       dwelling
                                                                1 in 100 yr ARI 2070    12 partial lots (Lake                 Unlikely      Insignificant   Insignificant   Insignificant    Insignificant      Low
                                                                                       Cooroibah Rd [some
                   95 lots (26                                  1 in 500 yr ARI 2070     dwellinsg], Morning                   Rare         Insignificant   Insignificant   Insignificant    Insignificant      Low
                    acreage)                                                                   Glory Dr)
                                                                1 in 20 yr ARI 2100        All lots north of                 Possible          Minor        Insignificant      Minor            Minor         Medium
                                                                1 in 100 yr ARI 2100     Lakeside Park (13)                  Unlikely          Minor        Insignificant      Minor            Minor          Low
                                                                                        (Lake Cooroibah Rd
                                                                1 in 500 yr ARI 2100   [some dwellings] 1 at                   Rare            Minor        Insignificant      Minor            Minor           Low
                                                                                          Morning Glory Dr)
                                                                        2040               Some backyard                   Almost Certain   Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                   Sea Level
                                                                        2070                inundation, no                 Almost Certain   Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                     Rise
                                                                        2100             dwelling inundation               Almost Certain   Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                                 1 in 20 yr ARI Now                                           Possible      Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                                1 in 100 yr ARI Now                                           Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                                1 in 500 yr ARI Now                                            Rare         Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                                1 in 20 yr ARI 2040       Gravity main at                     Possible      Insignificant   Insignificant   Insignificant    Insignificant     Low
                   [Coo2] area     Stormwater,                  1 in 100 yr ARI 2040      Lakeway Drive                       Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                    bound by      sewage, and      Storm Tide   1 in 500 yr ARI 2040                                           Rare         Insignificant   Insignificant   Insignificant    Insignificant     Low
                      Lake        water supply     Inundation   1 in 20 yr ARI 2070                                           Possible      Insignificant   Insignificant   Insignificant    Insignificant     Low
     Critical
                    Cooroibah    and energy and                 1 in 100 yr ARI 2070                                          Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
 infrastructure
                    Rd, Johns         lighting                  1 in 500 yr ARI 2070    Playground, boat                       Rare         Insignificant   Insignificant      Minor            Minor          Low
                    Rd & Lake     infrastructure                1 in 20 yr ARI 2100     ramp, gravity and                     Possible      Insignificant   Insignificant      Minor            Minor         Medium
                    Cooroibah          assets                   1 in 100 yr ARI 2100    pressure main at                      Unlikely      Insignificant   Insignificant      Minor            Minor          Low
                                                                1 in 500 yr ARI 2100     Lakeway Drive                         Rare         Insignificant   Insignificant      Minor            Minor          Low
                                                                        2040                                               Almost Certain   Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                   Sea Level
                                                                        2070                    Nil                        Almost Certain   Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                     Rise
                                                                        2100                                               Almost Certain   Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                                 1 in 20 yr ARI Now                                           Possible      Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                                1 in 100 yr ARI Now                                           Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                                1 in 500 yr ARI Now                                            Rare         Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                                1 in 20 yr ARI 2040                                           Possible      Insignificant   Insignificant   Insignificant    Insignificant     Low
                   [Coo2] area                                  1 in 100 yr ARI 2040                                          Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                    bound by                       Storm Tide   1 in 500 yr ARI 2040                                           Rare         Insignificant   Insignificant   Insignificant    Insignificant     Low
                      Lake                         Inundation   1 in 20 yr ARI 2070                                           Possible      Insignificant   Insignificant   Insignificant    Insignificant     Low
 Road network       Cooroibah    Road network                   1 in 100 yr ARI 2070      Nil - negligible                    Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                    Rd, Johns                                   1 in 500 yr ARI 2070                                           Rare         Insignificant   Insignificant   Insignificant    Insignificant     Low
                    Rd & Lake                                   1 in 20 yr ARI 2100                                           Possible      Insignificant   Insignificant   Insignificant    Insignificant     Low
                    Cooroibah                                   1 in 100 yr ARI 2100                                          Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                                1 in 500 yr ARI 2100                                           Rare         Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                                        2040                                               Almost Certain   Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                   Sea Level
                                                                        2070                                               Almost Certain   Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                     Rise
                                                                        2100                                               Almost Certain   Insignificant   Insignificant   Insignificant    Insignificant     Low

Section 61

                                                                                                                                                            Consequence                                      Risk Level   Potential
                                                     Hazard       Event/ Planning                                Existing   Likelihood of                                                    Combined
 Asset Name         Location       Asset Type                                            Impacted Assets                                                      Environ-                                        Adaptive     Control
                                                      Type           Horizon                                     Controls    the Hazard     Community                        Council        Consequence
                                                                                                                                                               mental                                         Capacity    Options
                                                                  1 in 20 yr ARI Now              Nil                         Possible      Insignificant   Insignificant   Insignificant    Insignificant      Low
                                                                 1 in 100 yr ARI Now                                          Unlikely      Insignificant   Insignificant   Insignificant    Insignificant      Low
                                                                 1 in 500 yr ARI Now                                           Rare         Insignificant   Insignificant   Insignificant    Insignificant      Low
                                                                                           1-2 lots partially
                                                                 1 in 20 yr ARI 2040                                          Possible      Insignificant   Insignificant   Insignificant    Insignificant      Low
                                                                                          impacted Boreen
                                                                 1 in 100 yr ARI 2040                                         Unlikely      Insignificant   Insignificant   Insignificant    Insignificant      Low
                      [BP1]                                                                      Pde
                                                                 1 in 500 yr ARI 2040                                          Rare         Insignificant   Insignificant   Insignificant    Insignificant      Low
  Residential        Boreen
                                                    Storm Tide   1 in 20 yr ARI 2070                                          Possible      Insignificant   Insignificant   Insignificant    Insignificant      Low
properties (Lake      Point         Residential                                                                    Nil
                                                    Inundation                            3-4 lots partially                                                                                                    Low
  Cootharaba)
                                                                 1 in 100 yr ARI 2070    impacted Boreen                      Unlikely      Insignificant   Insignificant   Insignificant    Insignificant
                    297 lots
                                                                                         Pde, Teewah Rd
                                                                 1 in 500 yr ARI 2070    8-10 lots partially                   Rare            Minor        Insignificant   Insignificant       Minor          Low
                                                                 1 in 20 yr ARI 2100     impacted Boreen                      Possible         Minor        Insignificant   Insignificant       Minor         Medium
                                                                 1 in 100 yr ARI 2100    Pde, Woongar St,                     Unlikely         Minor        Insignificant   Insignificant       Minor          Low
                                                                 1 in 500 yr ARI 2100       Teewah Rd                          Rare            Minor        Insignificant   Insignificant       Minor          Low
                                                                  1 in 20 yr ARI Now                                          Possible      Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                                 1 in 100 yr ARI Now                                          Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                                 1 in 500 yr ARI Now                                           Rare         Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                                                         Stormwater pipes,
                                    Stormwater,                  1 in 20 yr ARI 2040                                          Possible      Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                                                          pressure main,
                                   sewage, and                   1 in 100 yr ARI 2040                                         Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                                                          electrical assets
                                   water supply                  1 in 500 yr ARI 2040                                          Rare         Insignificant   Insignificant   Insignificant    Insignificant     Low
     Critical        Boreen                         Storm Tide
                                  and energy and                 1 in 20 yr ARI 2070                               Nil        Possible      Insignificant   Insignificant   Insignificant    Insignificant     Low
 infrastructure       Point                         Inundation
                                       lighting                  1 in 100 yr ARI 2070                                         Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                                   infrastructure                1 in 500 yr ARI 2070    Stormwater pipes,                     Rare         Insignificant   Insignificant   Insignificant    Insignificant     Low
                                        assets                   1 in 20 yr ARI 2100       pressure main,                     Possible      Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                                 1 in 100 yr ARI 2100     electrical assets,                  Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                                                         pump and main at
                                                                 1 in 500 yr ARI 2100                                           Rare        Insignificant   Insignificant   Insignificant    Insignificant      Low
                                                                                           campgrounds
                                                                 1 in 20 yr ARI Now      Minimal foreshore                    Possible      Insignificant   Insignificant   Insignificant    Insignificant      Low
                                                                 1 in 100 yr ARI Now         inundation                       Unlikely      Insignificant   Insignificant   Insignificant    Insignificant      Low
                                                                                        Minor inundation of                                                                                                     Low
                                                                 1 in 500 yr ARI Now                                            Rare        Insignificant   Insignificant      Minor            Minor
                                                                                               grounds
                                                                 1 in 20 yr ARI 2040    Moderate inundation                   Possible        Minor           Minor           Minor            Minor          Medium
                                                                 1 in 100 yr ARI 2040        of grounds                       Unlikely        Minor           Minor           Minor            Minor           Low
 Boreen Point        Boreen                                      1 in 500 yr ARI 2040                                          Rare           Minor          Moderate        Moderate         Moderate        Medium
                                  Open Space /      Storm Tide
Campground &          Point                                      1 in 20 yr ARI 2070                               Nil        Possible        Minor          Moderate        Moderate         Moderate         Low
                                   Recreation       Inundation
Caravan Park       (south side)                                  1 in 100 yr ARI 2070        Significant                      Unlikely        Minor          Moderate        Moderate         Moderate        Medium
                                                                 1 in 500 yr ARI 2070        inundation                        Rare           Minor          Moderate        Moderate         Moderate         Low
                                                                 1 in 20 yr ARI 2100                                          Possible        Minor          Moderate        Moderate         Moderate        Medium
                                                                 1 in 100 yr ARI 2100                                         Unlikely       Moderate        Moderate        Moderate         Moderate        Medium
                                                                                        Near total inundation
                                                                 1 in 500 yr ARI 2100     excluding main                        Rare         Moderate        Moderate          Major            Major          High
                                                                                             amenities
                                                                  1 in 20 yr ARI Now                                          Possible      Insignificant   Insignificant      Minor            Minor         Medium
                                                                 1 in 100 yr ARI Now                                          Unlikely      Insignificant   Insignificant      Minor            Minor          Low
                                                                 1 in 500 yr ARI Now                                           Rare         Insignificant   Insignificant      Minor            Minor          Low
                                                                                         Partial inundation of
                                                                 1 in 20 yr ARI 2040                                          Possible      Insignificant   Insignificant      Minor            Minor         Medium
                                                                                        Lake Flat Rd, Boreen
                                                                 1 in 100 yr ARI 2040                                         Unlikely      Insignificant   Insignificant      Minor            Minor          Low
                                                                                                  Pde
                                                                 1 in 500 yr ARI 2040                                          Rare         Insignificant   Insignificant      Minor            Minor          Low
                                                                 1 in 20 yr ARI 2070                                          Possible      Insignificant   Insignificant      Minor            Minor         Medium
                     Boreen                         Storm Tide   1 in 100 yr ARI 2070                                         Unlikely      Insignificant   Insignificant      Minor            Minor          Low
 Road network                     Road network                                                                     Nil
                      Point                         Inundation   1 in 500 yr ARI 2070   Partial inundation of                  Rare         Insignificant   Insignificant      Minor            Minor          Low
                                                                 1 in 20 yr ARI 2100      Lake Flat Rd (+                     Possible      Insignificant   Insignificant      Minor            Minor         Medium
                                                                                         driveway), Boreen
                                                                 1 in 100 yr ARI 2100                                         Unlikely      Insignificant   Insignificant      Minor            Minor           Low
                                                                                                 Pde
                                                                                        Partial inundation of
                                                                                          Lake Flat Rd (+
                                                                 1 in 500 yr ARI 2100                                           Rare           Minor        Insignificant      Minor            Minor           Low
                                                                                         driveway), Boreen
                                                                                        Pde, Louis Bazzo Dr

Section 62

                                                                                                                                                     Consequence                                      Risk Level   Potential
                                                Hazard       Event/ Planning                             Existing   Likelihood of                                                     Combined
 Asset Name        Location    Asset Type                                          Impacted Assets                                                    Environ-                                         Adaptive     Control
                                                 Type           Horizon                                  Controls    the Hazard      Community                        Council        Consequence
                                                                                                                                                       mental                                          Capacity    Options
                                                                                    Localised areas
                                                            1 in 20 yr ARI Now     around lakefront &                 Possible       Insignificant   Insignificant   Insignificant    Insignificant      Low
                                                                                      creek fringe
                                                            1 in 100 yr ARI Now                                       Unlikely       Insignificant   Insignificant   Insignificant    Insignificant     Low
  Great Sandy                                               1 in 500 yr ARI Now                                        Rare          Insignificant   Insignificant   Insignificant    Insignificant     Low
  National Park                                             1 in 20 yr ARI 2040    Large areas around                 Possible       Insignificant      Minor        Insignificant       Minor         Medium
    (and other                                 Storm Tide   1 in 100 yr ARI 2040    lakefront & creeks                Unlikely       Insignificant      Minor        Insignificant       Minor         Medium
related reserves                               Inundation   1 in 500 yr ARI 2040                                       Rare          Insignificant      Minor        Insignificant       Minor         Medium
 i.e. Wooroi Ck                                             1 in 20 yr ARI 2070                                       Possible       Insignificant      Minor        Insignificant       Minor         Medium
     Bushland                                               1 in 100 yr ARI 2070                                      Unlikely          Minor         Moderate          Minor          Moderate         High
     Reserve,                                               1 in 500 yr ARI 2070    Extensive areas                    Rare             Minor         Moderate          Minor          Moderate         Low
                              Open Space/
     Moorindil
                              Conservation                  1 in 20 yr ARI 2100    around lakefront &                 Possible          Minor         Moderate          Minor          Moderate         High
 Reserve, Harry    Various                                  1 in 100 yr ARI 2100        creeks             Nil        Unlikely          Minor         Moderate          Minor          Moderate         High
                                (including
      Spring
                              National Park)                1 in 500 yr ARI 2100                                       Rare             Minor         Moderate          Minor          Moderate         Low
  Conservation                                                                      Lakefront & creek
 Park, Cooribah                                                                    fringe, large areas                                                                                                              Habitat
 Environmental                                                     2040            around Kinaba Is &               Almost Certain   Insignificant   Insignificant   Insignificant    Insignificant      Low       migration,
 Reserve, Una                                                                         southern lake                                                                                                                  tidal
Corbould Nature                                Permanent                                shorelines                                                                                                                  barrage
     Reserve,                                  Sea Level           2070             Lakefront & creek               Almost Certain      Minor         Moderate          Minor          Moderate         High
 Boreen Point)                                    Rise                             fringe, large areas
                                                                                    around Kinaba Is,
                                                                   2100            eastern & southern               Almost Certain      Minor         Moderate          Minor          Moderate         High
                                                                                    lake shorelines, &
                                                                                      Lake Cooloola

The text continues on section 63.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.