2021-01-18 GC - Item 3 - Attachment 2 - Phase 7 Project Summary Coastal Hazards Adaptation Plan

of 98

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                        7
 Methodology




                Table 2-2     Permanent inundation due to Sea Level Rise mapping assumptions

           Planning            SLR            Noosa               Lake    Tewantin       Lake Cootharaba
           Horizon          allowance       Heads HAT            Weyba   HAT (mAHD)        HAT (mAHD)
                                (m)          (mAHD)               HAT
                                                                (mAHD)
          Present-day            0             1.16              0.5         0.91                0.2
              2040              0.2            1.36              0.7         1.11                0.4
              2070              0.5            1.66              1.0         1.41                0.7
              2100              0.8            1.96              1.3         1.71                1.0

2.2.3    Phase 4: Asset Prioritisation
         In phase 4 of the CHAP, Noosa Shire Council have sought to:

         • Identify and map assets – both tangible and intangible within the defined coastal hazard area;

         • Identify and understand potential impacts to interdependent infrastructure systems;

         • Estimate the underlying value – both economic and non-economic – of affected assets; and

         • Prioritise assets for analysis as part of subsequent CHAP phases.

         All identified assets were prioritised according to:

         • Difficulty to replace an asset

         • The cost of replacing an asset

         • The value the community places on an asset

         • The scarcity of an asset across the Shire

         • The remaining design life of an asset i.e. a shorter design life may create opportunities for asset
           replacement or responding to a changing risk profile easier

         • The ability of an asset to withstand a hazard

         • The criticality of an asset i.e. is an essential service in an emergency

         • Biodiversity value

         • The role the asset plays in Noosa’s economy i.e. fiscal contribution

         • The aesthetic value of an asset.

         Any assets that received a score greater than 4 (on a scale of 0-5) were identified as key assets and
         have been included in the risk assessment. Asset types that are not considered ‘key assets’ on an
         individual basis, but are when grouped (e.g. a given neighbourhood of private dwellings) have also
         been included.
Log in to download the original file

2021-01-18 GC - Item 3 - Attachment 2 - Phase 7 Project Summary Coastal Hazards Adaptation Plan(PDF, 7MB).pdf · 7.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.