2021-01-18 GC - Item 3 - Attachment 2 - Phase 7 Project Summary Coastal Hazards Adaptation Plan

of 98

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                       31
 Findings




                    Figure 3-1   Open Beaches Net Present Value (Source: Aither Economics, 2020)

3.6.2    Noosaville
         The results of the Noosaville CBA have identified that Option 1 (levees and stormwater infrastructure
         modifications) provides the greatest net benefit to the community in terms of protection from sea level
         rise, as shown in Table 3-3. This is driven by avoided loss of tourism revenue and recreational area
         and reduced infrastructure damage. It assumes that stormwater infrastructure modifications are
         required from 2040, whilst the levees are not constructed until 2070.

              Table 3-3        2100 Present Value Results, Noosaville (Source: Aither Economics, 2020)

                                             Option 1 – Levee and      Option 2 – road        Confidence
                                             stormwater modification   raising
            Net Present Value                $21.5m                    -$3.9m
            Benefit Cost Ratio               2.11                      0.80

            Costs                            $19.4m                    $19.2m
            Levee costs                      $8.9m                                            Medium
            Stormwater modification costs    $10.5m                                           Medium
            Road raising costs                                         $19.2m                 Medium

            Benefits                         $40.9m                    $15.3m
            Recreational benefits            $6.5m                     $0.1m                  Low
            Avoided property damage          $0.1m                     $0.1m                  Low
            Avoided road damage              $1.1m                     $0.6m                  Medium
            Tourism benefits                 $27.1m                    $10.8m                 Low
            Avoided damage to stormwater     $3.0m                     $0.6m                  Medium
            network
            Residential nuisance benefits    $3.1m                     $3.1m                  Low
Log in to download the original file

2021-01-18 GC - Item 3 - Attachment 2 - Phase 7 Project Summary Coastal Hazards Adaptation Plan(PDF, 7MB).pdf · 7.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.