2021-01-18 GC - Item 3 - Attachment 2 - Phase 7 Project Summary Coastal Hazards Adaptation Plan

of 98

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                 ii
Executive Summary




Locality               Recommended Adaptation Options              Recommended Adaptation Hierarchy
                                                                   Approach
Peregian to            Active dune and habitat management          Accommodate (short term)
Sunshine Beaches       Manual creek mouth management               Planned transition (long term)
                       Community infrastructure management
                       Land buy back
                       Relocate important infrastructure
                       Beach nourishment
                       Dune augmentation
Noosa Heads            Design of hazard resilient infrastructure   Accommodate
                       Tide flaps and valves on stormwater
                       pipe network
                       Active dune and habitat management
                       Dune augmentation
                       Improve sand shifter efficiency
Teewah                 Active dune and habitat management          Accommodate
                       Acquisition of properties affected by
                       coastal erosion in 2070, and conversion
                       of affected properties to public open
                       spaces
                       Beach nourishment
                       Dune augmentation
Noosaville             Design of hazard resilient infrastructure   Accommodate
                       Tide flaps and valves on stormwater
                       pipe network
                       Raising road levels
                       Levees
Tewantin               Design of hazard resilient infrastructure   Prepare/Accommodate
                       Tide flaps and valves on stormwater
                       pipe network
Noosa North Shore      Design of hazard resilient infrastructure   Avoid/Prepare
                       Reduce intensity of future development
Lake Cootharaba        Design of hazard resilient infrastructure   Prepare
                       Relocate important infrastructure
                       Land management to support habitat
                       migration
Log in to download the original file

2021-01-18 GC - Item 3 - Attachment 2 - Phase 7 Project Summary Coastal Hazards Adaptation Plan(PDF, 7MB).pdf · 7.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.