2021-01-18 GC - Item 3 - Attachment 2 - Phase 7 Project Summary Coastal Hazards Adaptation Plan

of 98

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                    Consequence                                      Risk Level
                                              Hazard    Event/ Planning                              Existing       Likelihood of                                                    Combined
Asset Name       Location     Asset Type                                  Impacted Assets                                                             Environ-                                        Adaptive
                                               Type        Horizon                                   Controls        the Hazard     Community                        Council        Consequence
                                                                                                                                                       mental                                         Capacity
                                                             2100         24 lots impacted; 6                         Unlikely         Major        Insignificant      Major            Major          High
                                                                           partial, 18 full lots
  Teewah            The       Open Space/     Erosion        Now            Beach access           Vegetated dune     Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
 Foreshore       Esplanade     Recreation                    2040                                      buffer         Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                             2070                                                     Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                             2100                                                     Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
    Mixed          [TW1]       Stormwater,    Erosion        Now          Minor stormwater         Vegetated dune     Unlikely      Insignificant   Insignificant      Minor            Minor          Low
infrastructure    Teewah      water supply,                  2040          and energy and              buffer         Unlikely      Insignificant   Insignificant      Minor            Minor          Low
   networks      Township    sewage, energy                  2070           lighting assets                           Unlikely         Minor        Insignificant      Minor            Minor          Low
                               and lighting                  2100                                                     Unlikely       Moderate       Insignificant      Minor          Moderate        Medium
Road network       [TW1]      Road reserve    Erosion        Now           Road surfaces,          Vegetated dune     Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                  Teewah                                     2040           guttering, and             buffer         Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                 Township                                    2070         adjacent pathways                           Unlikely      Insignificant   Insignificant   Insignificant    Insignificant     Low
                                                             2100                                                     Unlikely         Minor        Insignificant   Insignificant        Minor         Low
Log in to download the original file

2021-01-18 GC - Item 3 - Attachment 2 - Phase 7 Project Summary Coastal Hazards Adaptation Plan(PDF, 7MB).pdf · 7.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.