Log in to see the plans as drawn Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary iv
Contents
3.4.1 Open Coast 19
3.4.2 Noosa Heads 20
3.4.3 Noosaville 21
3.4.4 Tewantin 23
3.4.5 Noosa North Shore 23
3.4.6 Lake Weyba and Surrounds 24
3.4.7 Lake Cooribah, Lake Cootharaba and Surrounds 24
3.4.8 Summary 24
3.5 Phase 6: Options Assessment 26
3.5.1 Eastern Beaches (Peregian to Sunshine Beach) 26
3.5.2 Teewah 27
3.5.3 Noosa Heads (Erosion) 27
3.5.4 Noosa Heads (Inundation) 27
3.5.5 Noosaville 28
3.5.6 Tewantin 28
3.5.7 Noosa North Shore 28
3.5.8 Lake Cootharaba 29
3.5.9 Summary 29
3.6 Phase 7: Socio-economic Appraisal 30
3.6.1 Open Coast Locations 30
3.6.2 Noosaville 31
4 Conclusions and Recommendations 32
4.1 Additional considerations 33
Appendix A Hazard Mapping A-1
Appendix B Detailed Risk Assessment B-1
List of Figures
Figure 1-1 QCoast2100 Phases 2
Figure 2-1 Hierarchy of preferred coastal management responses for areas vulnerable to
coastal hazards (Noosa Environment Strategy 2019) 13
Figure 2-2 Conceptual CBA Model for open beaches 15
Figure 2-3 Conceptual Model for Noosaville CBA 16
Figure 3-1 Open Beaches Net Present Value (Source: Aither Economics, 2020) 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.